Contract Letting February 22,  2001


                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/23/01
                                                                                                             PAGE : 2
                                                          VENDOR RANKING

     CALL ORDER   : F02                     CONTRACT ID : 1241X                        COUNTIES : SALINE
     LETTING DATE : 02/22/01                DISTRICT    : 1
                                                                                           PROJECT(S) : BR-2940(1)
     CONTRACT DESCRIPTION :
     ON A COUNTY ROAD SOUTHWEST OF DORCHESTER.

  --------------------------------------------------------------------------------------------------------------------------
      VENDOR NO.           BID NOTES
  --------------------------------------------------------------------------------------------------------------------------
        0137               THE NUMBER OF GROUP 6 CONTRACTS WHICH WILL BE ACCEPTED IN
        0137               THIS LETTING IS LIMITED TO 1.
        0462               THE NUMBER OF GROUP 6 CONTRACTS WHICH WILL BE ACCEPTED IN
        0462               THIS LETTING IS LIMITED TO ONE.
        0805               THE NUMBER OF GROUP 6 CONTRACTS WHICH WILL BE ACCEPTED IN
        0805               THIS LETTING IS LIMITED TO 1.
        1742               THE NUMBER OF GROUP 6 CONTRACTS WHICH WILL BE ACCEPTED IN
        1742               THIS LETTING IS LIMITED TO ONE.
        2017               THE TOTAL AMOUNT OF WORK WHICH WILL BE ACCEPTED IN THIS
        2017               LETTING IS LIMITED TO $700,000.

  --------------------------------------------------------------------------------------------------------------------------
                                                                                                   TOTAL         % OVER
  RANK     VENDOR NO./NAME                                                                          BID           LOW BID
  --------------------------------------------------------------------------------------------------------------------------
   1   0774           DIXON CONSTRUCTION CO.                                                 $    252,425.48     100.0000%
   2   0805           A. M. COHRON & SON, INC.                                               $    253,828.88     100.5559%
   3   0810           ELK HORN CONSTRUCTION CO.                                              $    259,095.38     102.6423%
   4   0462           L. J. WEBB CONTRACTOR, INC.                                            $    259,991.28     102.9972%
   5   0880           CHRISTENSEN BROS., INC.                                                $    275,698.04     109.2195%
   6   1742           HERBST CONSTRUCTION, INC.                                              $    279,643.70     110.7826%
   7   0137           JUDDS BROS. CONSTRUCTION CO.                                           $    281,937.95     111.6915%
   8   1809           CAPITAL CONTRACTORS, INC.                                              $    294,739.08     116.7628%
   9   2017           BRB CONTRACTORS, INC.                                                  $    332,183.90     131.5968%
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/23/01
                                                                                                             PAGE : 3
                                                        TABULATION OF BIDS

     CALL ORDER   : F02                    CONTRACT ID : 1241X                       COUNTIES : SALINE
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 1
                                                                                     PROJECT(S) : BR-2940(1)



====================================================================================================================================
                                          |(1) 0774                    |(2) 0805                    |(3) 0810
                                          |DIXON CONSTRUCTION CO.      |COHRON & SON, INC./A. M.    |ELK HORN CONSTRUCTION CO.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001   GROUP 6 BRIDGE AT STA. 14+90.00
               1-24.384 M SPAN PRESTRESSED CONCRETE GIRDER BRIDGE
                                          |                            |                            |
0001 L006.00                   1.000  ha  |    1235.00000       1235.00|     311.00000        311.00|     292.52000         292.52
  COVER CROP SEEDING                      |                            |                            |
0002 0001.10                1248.000  BDAY|       2.00000       2496.00|       2.00000       2496.00|       1.50000        1872.00
  BARRICADE, TYPE III                     |                            |                            |
0003 0001.30                 208.000  LDAY|       2.25000        468.00|       2.25000        468.00|       2.50000         520.00
  TYPE B HIGH INTENSITY WARNING LIGHT     |                            |                            |
0004 0001.90                2080.000  EACH|       0.25000        520.00|       0.25000        520.00|       0.50000        1040.00
  SIGN DAY                                |                            |                            |
0005 0030.60                          LUMP|   25000.00000      25000.00|   24000.00000      24000.00|   25000.00000       25000.00
  MOBILIZATION                            |                            |                            |
0006 1009.00                          LUMP|    1500.00000       1500.00|    3275.00000       3275.00|    3500.00000        3500.00
  GENERAL CLEARING AND GRUBBING           |                            |                            |
0007 1010.01                1911.000  m3  |       5.24000      10013.64|       4.50000       8599.50|       4.31000        8236.41
  EXCAVATION (ESTABLISHED QUANTITY)       |                            |                            |
0008 1011.00                  38.000  kL  |       5.00000        190.00|       2.73000        103.74|       2.60000          98.80
  WATER                                   |                            |                            |
0009 1043.50                 674.000  m2  |       2.20000       1482.80|       2.50000       1685.00|       2.50000        1685.00
  RIPRAP FILTER FABRIC                    |                            |                            |
0010 2009.51                   1.648  StaM|    1000.00000       1648.00|     388.00000        639.42|     370.13000         609.97
  CRUSHED ROCK EMBEDMENT                  |                            |                            |
0011 2010.03                 139.000  Mg  |      20.00000       2780.00|      18.65000       2592.35|      17.77000        2470.03
  CRUSHED ROCK SURFACE COURSE             |                            |                            |
0012 4050.01                  66.000  m3  |      10.00000        660.00|       5.57000        367.62|       5.30000         349.80
  EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,|                            |                            |
   AND HEADWALLS                          |                            |                            |
0013 4300.24                  19.000  m   |      64.42000       1223.98|      55.50000       1054.50|      52.83000        1003.77
  600 mm CULVERT PIPE                     |                            |                            |
0014 4310.24                   1.000  EACH|     300.00000        300.00|     105.00000        105.00|     100.03000         100.03
  600 mm FLARED-END SECTION               |                            |                            |
0015 6000.10                  75.000  LS  |    5000.00000       5000.00|    2500.00000       2500.00|    5000.00000        5000.00
  ABUTMENT NO.1 EXCAVATION                |                            |                            |
0016 6000.11                  75.000  LS  |    5000.00000       5000.00|    2500.00000       2500.00|    5000.00000        5000.00
  ABUTMENT NO.2 EXCAVATION                |                            |                            |
0017 6005.78                   4.000  EACH|    1000.00000       4000.00|     750.00000       3000.00|     800.00000        3200.00
  EXPANSION BEARING, TFE TYPE             |                            |                            |
0018 6005.83                   4.000  EACH|     900.00000       3600.00|     670.00000       2680.00|     800.00000        3200.00
  FIXED BEARING                           |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/23/01
                                                                                                             PAGE : 4
                                                        TABULATION OF BIDS

     CALL ORDER   : F02                    CONTRACT ID : 1241X                       COUNTIES : SALINE
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 1
                                                                                     PROJECT(S) : BR-2940(1)



====================================================================================================================================
                                          |(1) 0774                    |(2) 0805                    |(3) 0810
                                          |DIXON CONSTRUCTION CO.      |COHRON & SON, INC./A. M.    |ELK HORN CONSTRUCTION CO.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0019 6010.22                 105.000  m3  |     393.00000      41265.00|     390.00000      40950.00|     450.00000       47250.00
  CLASS 47B-20 CONCRETE FOR BRIDGE        |                            |                            |
0020 6010.26                  65.700  m3  |     393.00000      25820.10|     390.00000      25623.00|     450.00000       29565.00
  CLASS 47BD-30 CONCRETE FOR BRIDGE       |                            |                            |
0021 6011.11                  33.400  LS  |   42125.00000      42125.00|   43000.00000      43000.00|   40000.00000       40000.00
  PRECAST/PRESTRESSED CONCRETE            |                            |                            |
  SUPERSTRUCTURE AT STA. 14+90            |                            |                            |
0022 6020.00               10735.000  kg  |       1.10000      11808.50|       1.25000      13418.75|       1.05000       11271.75
  REINFORCING STEEL FOR BRIDGE            |                            |                            |
0023 6040.00                   1.000  EACH|   12000.00000      12000.00|   12000.00000      12000.00|   13000.00000       13000.00
  REMOVE STRUCTURE AT STA. 14+92.4        |                            |                            |
0024 6080.00                1555.000  kg  |       5.50000       8552.50|       4.20000       6531.00|       4.50000        6997.50
  STRUCTURAL STEEL FOR SUBSTRUCTURE       |                            |                            |
0025 6095.00                   3.000  EACH|     725.00000       2175.00|     325.00000        975.00|     700.00000        2100.00
  STEEL DIAPHRAGM                         |                            |                            |
0026 6105.02                 645.000  Mg  |      25.00000      16125.00|      42.00000      27090.00|      28.00000       18060.00
  ROCK RIPRAP, TYPE B                     |                            |                            |
0027 6210.12                 328.800  m   |      49.20000      16176.96|      55.00000      18084.00|      56.00000       18412.80
  HP 250 mm X 62 kg STEEL PILING          |                            |                            |
0028 7020.00                   4.000  EACH|    1235.50000       4942.00|    1235.50000       4942.00|    1235.50000        4942.00
  BRIDGE APPROACH SECTIONS                |                            |                            |
0029 7021.45                   4.000  EACH|    1079.50000       4318.00|    1079.50000       4318.00|    1079.50000        4318.00
  BREAKAWAY CABLE TERMINAL                |                            |                            |
     SECTION TOTALS                       |             $    252,425.48|             $    253,828.88|                $    259,095.38
------------------------------------------+----------------------------+----------------------------+-------------------------------
     CONTRACT TOTALS                      |             $    252,425.48|             $    253,828.88|                $    259,095.38
====================================================================================================================================
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/23/01
                                                                                                             PAGE : 5
                                                        TABULATION OF BIDS

     CALL ORDER   : F02                    CONTRACT ID : 1241X                       COUNTIES : SALINE
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 1
                                                                                     PROJECT(S) : BR-2940(1)



====================================================================================================================================
                                          |(4) 0462                    |(5) 0880                    |(6) 1742
                                          |WEBB CONTRACTOR, INC./L. J. |CHRISTENSEN BROS., INC.     |HERBST CONSTRUCTION, INC.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001   GROUP 6 BRIDGE AT STA. 14+90.00
               1-24.384 M SPAN PRESTRESSED CONCRETE GIRDER BRIDGE
                                          |                            |                            |
0001 L006.00                   1.000  ha  |    1235.00000       1235.00|     300.00000        300.00|     300.00000         300.00
  COVER CROP SEEDING                      |                            |                            |
0002 0001.10                1248.000  BDAY|       2.00000       2496.00|       2.10000       2620.80|       2.00000        2496.00
  BARRICADE, TYPE III                     |                            |                            |
0003 0001.30                 208.000  LDAY|       2.25000        468.00|       1.05000        218.40|       2.25000         468.00
  TYPE B HIGH INTENSITY WARNING LIGHT     |                            |                            |
0004 0001.90                2080.000  EACH|       0.25000        520.00|       0.60000       1248.00|       0.50000        1040.00
  SIGN DAY                                |                            |                            |
0005 0030.60                          LUMP|   15400.00000      15400.00|   24000.00000      24000.00|   22000.00000       22000.00
  MOBILIZATION                            |                            |                            |
0006 1009.00                          LUMP|    2000.00000       2000.00|    3200.00000       3200.00|    5000.00000        5000.00
  GENERAL CLEARING AND GRUBBING           |                            |                            |
0007 1010.01                1911.000  m3  |       2.00000       3822.00|       4.50000       8599.50|       4.50000        8599.50
  EXCAVATION (ESTABLISHED QUANTITY)       |                            |                            |
0008 1011.00                  38.000  kL  |       2.63000         99.94|       2.70000        102.60|       3.00000         114.00
  WATER                                   |                            |                            |
0009 1043.50                 674.000  m2  |       2.40000       1617.60|       2.00000       1348.00|       3.00000        2022.00
  RIPRAP FILTER FABRIC                    |                            |                            |
0010 2009.51                   1.648  StaM|     455.00000        749.84|     380.00000        626.24|     400.00000         659.20
  CRUSHED ROCK EMBEDMENT                  |                            |                            |
0011 2010.03                 139.000  Mg  |      22.05000       3064.95|      18.00000       2502.00|      18.00000        2502.00
  CRUSHED ROCK SURFACE COURSE             |                            |                            |
0012 4050.01                  66.000  m3  |      13.10000        864.60|       5.50000        363.00|       5.50000         363.00
  EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,|                            |                            |
   AND HEADWALLS                          |                            |                            |
0013 4300.24                  19.000  m   |      56.00000       1064.00|      54.00000       1026.00|      55.00000        1045.00
  600 mm CULVERT PIPE                     |                            |                            |
0014 4310.24                   1.000  EACH|     150.00000        150.00|     110.00000        110.00|     110.00000         110.00
  600 mm FLARED-END SECTION               |                            |                            |
0015 6000.10                  75.000  LS  |    3000.00000       3000.00|    3000.00000       3000.00|    7000.00000        7000.00
  ABUTMENT NO.1 EXCAVATION                |                            |                            |
0016 6000.11                  75.000  LS  |    3000.00000       3000.00|    3000.00000       3000.00|    7000.00000        7000.00
  ABUTMENT NO.2 EXCAVATION                |                            |                            |
0017 6005.78                   4.000  EACH|    1000.00000       4000.00|    1150.00000       4600.00|    1100.00000        4400.00
  EXPANSION BEARING, TFE TYPE             |                            |                            |
0018 6005.83                   4.000  EACH|    1000.00000       4000.00|    1100.00000       4400.00|    1050.00000        4200.00
  FIXED BEARING                           |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/23/01
                                                                                                             PAGE : 6
                                                        TABULATION OF BIDS

     CALL ORDER   : F02                    CONTRACT ID : 1241X                       COUNTIES : SALINE
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 1
                                                                                     PROJECT(S) : BR-2940(1)



====================================================================================================================================
                                          |(4) 0462                    |(5) 0880                    |(6) 1742
                                          |WEBB CONTRACTOR, INC./L. J. |CHRISTENSEN BROS., INC.     |HERBST CONSTRUCTION, INC.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0019 6010.22                 105.000  m3  |     392.37000      41198.85|     420.00000      44100.00|     370.00000       38850.00
  CLASS 47B-20 CONCRETE FOR BRIDGE        |                            |                            |
0020 6010.26                  65.700  m3  |     523.17000      34372.27|     400.00000      26280.00|     400.00000       26280.00
  CLASS 47BD-30 CONCRETE FOR BRIDGE       |                            |                            |
0021 6011.11                  33.400  LS  |   50000.00000      50000.00|   51000.00000      51000.00|   55000.00000       55000.00
  PRECAST/PRESTRESSED CONCRETE            |                            |                            |
  SUPERSTRUCTURE AT STA. 14+90            |                            |                            |
0022 6020.00               10735.000  kg  |       1.32000      14170.20|       1.50000      16102.50|       1.20000       12882.00
  REINFORCING STEEL FOR BRIDGE            |                            |                            |
0023 6040.00                   1.000  EACH|    8000.00000       8000.00|   12000.00000      12000.00|   19000.00000       19000.00
  REMOVE STRUCTURE AT STA. 14+92.4        |                            |                            |
0024 6080.00                1555.000  kg  |       6.62000      10294.10|       7.00000      10885.00|       5.00000        7775.00
  STRUCTURAL STEEL FOR SUBSTRUCTURE       |                            |                            |
0025 6095.00                   3.000  EACH|     500.00000       1500.00|     700.00000       2100.00|     620.00000        1860.00
  STEEL DIAPHRAGM                         |                            |                            |
0026 6105.02                 645.000  Mg  |      30.87000      19911.15|      30.00000      19350.00|      30.00000       19350.00
  ROCK RIPRAP, TYPE B                     |                            |                            |
0027 6210.12                 328.800  m   |      72.18000      23732.78|      70.00000      23016.00|      60.00000       19728.00
  HP 250 mm X 62 kg STEEL PILING          |                            |                            |
0028 7020.00                   4.000  EACH|    1235.50000       4942.00|    1300.00000       5200.00|    1300.00000        5200.00
  BRIDGE APPROACH SECTIONS                |                            |                            |
0029 7021.45                   4.000  EACH|    1079.50000       4318.00|    1100.00000       4400.00|    1100.00000        4400.00
  BREAKAWAY CABLE TERMINAL                |                            |                            |
     SECTION TOTALS                       |             $    259,991.28|             $    275,698.04|                $    279,643.70
------------------------------------------+----------------------------+----------------------------+-------------------------------
     CONTRACT TOTALS                      |             $    259,991.28|             $    275,698.04|                $    279,643.70
====================================================================================================================================
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/23/01
                                                                                                             PAGE : 7
                                                        TABULATION OF BIDS

     CALL ORDER   : F02                    CONTRACT ID : 1241X                       COUNTIES : SALINE
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 1
                                                                                     PROJECT(S) : BR-2940(1)



====================================================================================================================================
                                          |(7) 0137                    |(8) 1809                    |(9) 2017
                                          |JUDDS BROS. CONSTRUCTION CO.|CAPITAL CONTRACTORS, INC.   |BRB CONTRACTORS, INC.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001   GROUP 6 BRIDGE AT STA. 14+90.00
               1-24.384 M SPAN PRESTRESSED CONCRETE GIRDER BRIDGE
                                          |                            |                            |
0001 L006.00                   1.000  ha  |     300.00000        300.00|     296.52000        296.52|     600.00000         600.00
  COVER CROP SEEDING                      |                            |                            |
0002 0001.10                1248.000  BDAY|       2.00000       2496.00|       2.00000       2496.00|       2.00000        2496.00
  BARRICADE, TYPE III                     |                            |                            |
0003 0001.30                 208.000  LDAY|       2.25000        468.00|       2.25000        468.00|       2.25000         468.00
  TYPE B HIGH INTENSITY WARNING LIGHT     |                            |                            |
0004 0001.90                2080.000  EACH|       0.25000        520.00|       0.25000        520.00|       0.25000         520.00
  SIGN DAY                                |                            |                            |
0005 0030.60                          LUMP|   10000.00000      10000.00|   20605.00000      20605.00|   37500.00000       37500.00
  MOBILIZATION                            |                            |                            |
0006 1009.00                          LUMP|    3120.00000       3120.00|    3120.00000       3120.00|    3000.00000        3000.00
  GENERAL CLEARING AND GRUBBING           |                            |                            |
0007 1010.01                1911.000  m3  |       4.35000       8312.85|       4.31000       8236.41|       3.00000        5733.00
  EXCAVATION (ESTABLISHED QUANTITY)       |                            |                            |
0008 1011.00                  38.000  kL  |       2.60000         98.80|       2.60000         98.80|       3.80000         144.40
  WATER                                   |                            |                            |
0009 1043.50                 674.000  m2  |       2.50000       1685.00|       3.00000       2022.00|       2.50000        1685.00
  RIPRAP FILTER FABRIC                    |                            |                            |
0010 2009.51                   1.648  StaM|     375.00000        618.00|     370.13000        609.97|    1500.00000        2472.00
  CRUSHED ROCK EMBEDMENT                  |                            |                            |
0011 2010.03                 139.000  Mg  |      18.00000       2502.00|      17.77000       2470.03|      20.00000        2780.00
  CRUSHED ROCK SURFACE COURSE             |                            |                            |
0012 4050.01                  66.000  m3  |       5.50000        363.00|       5.30000        349.80|      15.00000         990.00
  EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,|                            |                            |
   AND HEADWALLS                          |                            |                            |
0013 4300.24                  19.000  m   |      53.00000       1007.00|      52.83000       1003.77|      61.00000        1159.00
  600 mm CULVERT PIPE                     |                            |                            |
0014 4310.24                   1.000  EACH|     100.00000        100.00|     100.03000        100.03|     210.00000         210.00
  600 mm FLARED-END SECTION               |                            |                            |
0015 6000.10                  75.000  LS  |    4000.00000       4000.00|   15000.00000      15000.00|    6000.00000        6000.00
  ABUTMENT NO.1 EXCAVATION                |                            |                            |
0016 6000.11                  75.000  LS  |    4000.00000       4000.00|   15000.00000      15000.00|    6000.00000        6000.00
  ABUTMENT NO.2 EXCAVATION                |                            |                            |
0017 6005.78                   4.000  EACH|     825.00000       3300.00|     750.00000       3000.00|    1100.00000        4400.00
  EXPANSION BEARING, TFE TYPE             |                            |                            |
0018 6005.83                   4.000  EACH|     885.00000       3540.00|     750.00000       3000.00|    1000.00000        4000.00
  FIXED BEARING                           |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/23/01
                                                                                                             PAGE : 8
                                                        TABULATION OF BIDS

     CALL ORDER   : F02                    CONTRACT ID : 1241X                       COUNTIES : SALINE
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 1
                                                                                     PROJECT(S) : BR-2940(1)



====================================================================================================================================
                                          |(7) 0137                    |(8) 1809                    |(9) 2017
                                          |JUDDS BROS. CONSTRUCTION CO.|CAPITAL CONTRACTORS, INC.   |BRB CONTRACTORS, INC.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0019 6010.22                 105.000  m3  |     510.00000      53550.00|     375.00000      39375.00|     640.00000       67200.00
  CLASS 47B-20 CONCRETE FOR BRIDGE        |                            |                            |
0020 6010.26                  65.700  m3  |    1120.00000      73584.00|     385.00000      25294.50|     430.00000       28251.00
  CLASS 47BD-30 CONCRETE FOR BRIDGE       |                            |                            |
0021 6011.11                  33.400  LS  |   45000.00000      45000.00|   72200.00000      72200.00|   56000.00000       56000.00
  PRECAST/PRESTRESSED CONCRETE            |                            |                            |
  SUPERSTRUCTURE AT STA. 14+90            |                            |                            |
0022 6020.00               10735.000  kg  |       0.70000       7514.50|       1.15000      12345.25|       1.70000       18249.50
  REINFORCING STEEL FOR BRIDGE            |                            |                            |
0023 6040.00                   1.000  EACH|    5000.00000       5000.00|    6740.00000       6740.00|   16000.00000       16000.00
  REMOVE STRUCTURE AT STA. 14+92.4        |                            |                            |
0024 6080.00                1555.000  kg  |       3.50000       5442.50|       5.00000       7775.00|       6.00000        9330.00
  STRUCTURAL STEEL FOR SUBSTRUCTURE       |                            |                            |
0025 6095.00                   3.000  EACH|     550.00000       1650.00|     350.00000       1050.00|     500.00000        1500.00
  STEEL DIAPHRAGM                         |                            |                            |
0026 6105.02                 645.000  Mg  |      27.50000      17737.50|      35.00000      22575.00|      36.00000       23220.00
  ROCK RIPRAP, TYPE B                     |                            |                            |
0027 6210.12                 328.800  m   |      51.00000      16768.80|      60.00000      19728.00|      70.00000       23016.00
  HP 250 mm X 62 kg STEEL PILING          |                            |                            |
0028 7020.00                   4.000  EACH|    1235.50000       4942.00|    1235.50000       4942.00|    1235.50000        4942.00
  BRIDGE APPROACH SECTIONS                |                            |                            |
0029 7021.45                   4.000  EACH|    1079.50000       4318.00|    1079.50000       4318.00|    1079.50000        4318.00
  BREAKAWAY CABLE TERMINAL                |                            |                            |
     SECTION TOTALS                       |             $    281,937.95|             $    294,739.08|                $    332,183.90
------------------------------------------+----------------------------+----------------------------+-------------------------------
     CONTRACT TOTALS                      |             $    281,937.95|             $    294,739.08|                $    332,183.90
====================================================================================================================================