Contract Letting February 22,  2001

                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 2
                                                          VENDOR RANKING

     CALL ORDER   : F10                     CONTRACT ID : 32041                        COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01                DISTRICT    : 3
                                                                                           PROJECT(S) : DPS-EACNH-57-4(108)
     CONTRACT DESCRIPTION :                                                                             EACSTPD-EACBR-57-4(110)
     N-57, NEWCASTLE NORTH & NORTH OF N-15/US-20.

  --------------------------------------------------------------------------------------------------------------------------
      VENDOR NO.           BID NOTES
  --------------------------------------------------------------------------------------------------------------------------
        1661               THE TOTAL AMOUNT OF WORK WHICH WILL BE ACCEPTED IN THIS
        1661               LETTING IS LIMITED TO 4,500,000.00.

  --------------------------------------------------------------------------------------------------------------------------
                                                                                                   TOTAL         % OVER
  RANK     VENDOR NO./NAME                                                                          BID           LOW BID
  --------------------------------------------------------------------------------------------------------------------------
   1   0875           BROWER CONSTRUCTION CO.                                                $  2,766,874.47     100.0000%
   2   1344           DOBSON BROTHERS CONSTRUCTION COMPANY                                   $  2,817,736.37     101.8382%
   3   0477           WESTERN ENGINEERING COMPANY, INC.                                      $  2,989,636.73     108.0510%
   4   0574           CONSTRUCTORS, INC.                                                     $  3,131,980.87     113.1956%
   5   0086           HENNINGSEN CONST., INC.                                                $  3,155,228.63     114.0358%
   6   1661           U.S. ASPHALT CO.                                                       $  3,458,643.21     125.0018%
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 3
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(1) 0875                    |(2) 1344                    |(3) 0477
                                          |BROWER CONSTRUCTION CO.     |DOBSON BROTHERS CONSTRUCTION|WESTERN ENGINEERING COMPANY,
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001   GROUP 6 BRIDGE AT STA. 48+86.40
               1-26.00 M SPAN PRESTRESSED CONCRETE INVERTED TEE GIRDER BRDG
                                          |                            |                            |
0001 0030.60                          LUMP|   25312.50000      25312.50|   25000.00000      25000.00|   26000.00000       26000.00
  MOBILIZATION                            |                            |                            |
0002 1043.50                 422.000  m2  |       2.53000       1067.66|       2.50000       1055.00|       2.50000        1055.00
  RIPRAP FILTER FABRIC                    |                            |                            |
0003 3050.15                 117.100  m3  |     258.19000      30234.05|     255.00000      29860.50|     256.00000       29977.60
  CONCRETE FOR PAVEMENT APPROACHES CLASS  |                            |                            |
  47BD-30                                 |                            |                            |
0004 3051.10                7695.000  kg  |       1.37000      10542.15|       1.35000      10388.25|       1.36000       10465.20
  EPOXY COATED REINFORCING STEEL FOR      |                            |                            |
  PAVEMENT APPROACHES                     |                            |                            |
0005 6000.10                  50.000  LS  |    5062.50000       5062.50|    5000.00000       5000.00|    5000.00000        5000.00
  ABUTMENT NO.1 EXCAVATION                |                            |                            |
0006 6000.11                  50.000  LS  |    5062.50000       5062.50|    5000.00000       5000.00|    5000.00000        5000.00
  ABUTMENT NO.2 EXCAVATION                |                            |                            |
0007 6010.22                  47.700  m3  |     470.81000      22457.64|     465.00000      22180.50|     470.00000       22419.00
  CLASS 47B-20 CONCRETE FOR BRIDGE        |                            |                            |
0008 6010.26                  71.500  m3  |     506.25000      36196.88|     500.00000      35750.00|     505.00000       36107.50
  CLASS 47BD-30 CONCRETE FOR BRIDGE       |                            |                            |
0009 6011.11                  85.200  LS  |  101250.00000     101250.00|  100000.00000     100000.00|  101000.00000      101000.00
  PRECAST/PRESTRESSED CONCRETE            |                            |                            |
  SUPERSTRUCTURE AT STA. 48+86.40         |                            |                            |
0010 6040.00                   1.000  EACH|   18225.00000      18225.00|   18000.00000      18000.00|   18000.00000       18000.00
  REMOVE STRUCTURE AT STA. 48+90.60       |                            |                            |
0011 6104.00                 415.000  Mg  |      22.28000       9246.20|      22.00000       9130.00|      22.50000        9337.50
  BROKEN CONCRETE RIPRAP                  |                            |                            |
0012 6131.50               10430.000  kg  |       1.37000      14289.10|       1.35000      14080.50|       1.36000       14184.80
  EPOXY COATED REINFORCING STEEL          |                            |                            |
0013 6139.50                  34.000  m2  |      33.41000       1135.94|      33.00000       1122.00|      33.00000        1122.00
  SUBSURFACE DRAINAGE MATTING             |                            |                            |
0014 6200.00                 377.900  m   |      85.05000      32140.40|      84.00000      31743.60|      85.00000       32121.50
  CONCRETE PILING                         |                            |                            |
0015 6310.00                 254.500  m2  |     126.56000      32209.52|     125.00000      31812.50|     126.00000       32067.00
  STEEL SHEET PILING                      |                            |                            |
0016 8091.00                 110.000  m3  |      36.45000       4009.50|      36.00000       3960.00|      36.00000        3960.00
  GRANULAR BACKFILL                       |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 4
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(1) 0875                    |(2) 1344                    |(3) 0477
                                          |BROWER CONSTRUCTION CO.     |DOBSON BROTHERS CONSTRUCTION|WESTERN ENGINEERING COMPANY,
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
     SECTION TOTALS                       |             $    348,441.54|             $    344,082.85|                $    347,817.10
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0002   GROUP 6A BRIDGE AT STA. 154+20.96
               1-15.00 M & 2-14.00 M SPANS PREST CONC INVERTED TEE GRDR BR
                                          |                            |                            |
0017 0030.60                          LUMP|   45000.00000      45000.00|   45000.00000      45000.00|   46000.00000       46000.00
  MOBILIZATION                            |                            |                            |
0018 1043.50                 623.000  m2  |       2.50000       1557.50|       2.50000       1557.50|       2.50000        1557.50
  RIPRAP FILTER FABRIC                    |                            |                            |
0019 3050.15                 116.400  m3  |     240.00000      27936.00|     240.00000      27936.00|     242.00000       28168.80
  CONCRETE FOR PAVEMENT APPROACHES CLASS  |                            |                            |
  47BD-30                                 |                            |                            |
0020 3051.10                7710.000  kg  |       1.20000       9252.00|       1.20000       9252.00|       1.21000        9329.10
  EPOXY COATED REINFORCING STEEL FOR      |                            |                            |
  PAVEMENT APPROACHES                     |                            |                            |
0021 6000.10                  45.000  LS  |    5000.00000       5000.00|    5000.00000       5000.00|    5000.00000        5000.00
  ABUTMENT NO.1 EXCAVATION                |                            |                            |
0022 6000.11                  45.000  LS  |    5000.00000       5000.00|    5000.00000       5000.00|    5000.00000        5000.00
  ABUTMENT NO.2 EXCAVATION                |                            |                            |
0023 6001.50                  10.000  LS  |    5000.00000       5000.00|    5000.00000       5000.00|    5000.00000        5000.00
  BENT NO.1 EXCAVATION                    |                            |                            |
0024 6001.51                  10.000  LS  |    5000.00000       5000.00|    5000.00000       5000.00|    5000.00000        5000.00
  BENT NO.2 EXCAVATION                    |                            |                            |
0025 6010.22                 130.300  m3  |     500.00000      65150.00|     500.00000      65150.00|     505.00000       65801.50
  CLASS 47B-20 CONCRETE FOR BRIDGE        |                            |                            |
0026 6010.26                 103.700  m3  |     500.00000      51850.00|     500.00000      51850.00|     505.00000       52368.50
  CLASS 47BD-30 CONCRETE FOR BRIDGE       |                            |                            |
0027 6011.11                  92.300  LS  |  115000.00000     115000.00|   15000.00000      15000.00|  116000.00000      116000.00
  PRECAST/PRESTRESSED CONCRETE            |                            |                            |
  SUPERSTRUCTURE AT STA. 154+20.96        |                            |                            |
0028 6040.00                   1.000  EACH|   25000.00000      25000.00|   25000.00000      25000.00|   25000.00000       25000.00
  REMOVE STRUCTURE AT STA. 154+21.00      |                            |                            |
0029 6080.00                 720.000  kg  |       5.00000       3600.00|       5.00000       3600.00|       5.00000        3600.00
  STRUCTURAL STEEL FOR SUBSTRUCTURE       |                            |                            |
0030 6104.00                 600.000  Mg  |      17.00000      10200.00|      17.00000      10200.00|      17.50000       10500.00
  BROKEN CONCRETE RIPRAP                  |                            |                            |
0031 6131.50               19455.000  kg  |       1.20000      23346.00|       1.20000      23346.00|       1.21000       23540.55
  EPOXY COATED REINFORCING STEEL          |                            |                            |
0032 6139.50                  28.000  m2  |      40.00000       1120.00|      40.00000       1120.00|      41.00000        1148.00
  SUBSURFACE DRAINAGE MATTING             |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 5
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(1) 0875                    |(2) 1344                    |(3) 0477
                                          |BROWER CONSTRUCTION CO.     |DOBSON BROTHERS CONSTRUCTION|WESTERN ENGINEERING COMPANY,
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0033 6210.12                 427.200  m   |      66.00000      28195.20|      66.00000      28195.20|      66.50000       28408.80
  HP 250 mm X 62 kg STEEL PILING          |                            |                            |
0034 6310.00                 254.400  m2  |     130.00000      33072.00|     130.00000      33072.00|     131.00000       33326.40
  STEEL SHEET PILING                      |                            |                            |
0035 8091.00                 115.000  m3  |      25.00000       2875.00|      25.00000       2875.00|      25.00000        2875.00
  GRANULAR BACKFILL                       |                            |                            |
     SECTION TOTALS                       |             $    463,153.70|             $    363,153.70|                $    467,624.15
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0003   GROUP 7 GUARDRAIL
                                          |                            |                            |
0036 0030.70                          LUMP|    1464.39000       1464.39|    2000.00000       2000.00|    1500.00000        1500.00
  MOBILIZATION                            |                            |                            |
0037 7011.20                  99.000  m   |      42.74000       4231.26|      42.00000       4158.00|      42.00000        4158.00
  W-BEAM GUARDRAIL                        |                            |                            |
0038 7017.00                 168.000  m   |       8.50000       1428.00|       8.35000       1402.80|       8.35000        1402.80
  REMOVE GUARDRAIL                        |                            |                            |
0039 7018.01                 168.000  m   |      36.63000       6153.84|      36.00000       6048.00|      36.00000        6048.00
  RESET GUARDRAIL                         |                            |                            |
0040 7020.00                  10.000  EACH|    1221.00000      12210.00|    1200.00000      12000.00|    1200.00000       12000.00
  BRIDGE APPROACH SECTIONS                |                            |                            |
0041 7021.70                  10.000  EACH|    1526.25000      15262.50|    1500.00000      15000.00|    1500.00000       15000.00
  GUARDRAIL END TREATMENT, SRT-350        |                            |                            |
     SECTION TOTALS                       |             $     40,749.99|             $     40,608.80|                $     40,108.80
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0004   GROUP 8B ELECTRICAL
                                          |                            |                            |
0042 A009.14                   2.000  EACH|    1800.00000       3600.00|    1800.00000       3600.00|    1800.00000        3600.00
  STREET LIGHTING UNIT, TYPE              |                            |                            |
  SL-BT-12.2-3.7-0.25                     |                            |                            |
0043 A020.10                   1.000  EACH|    1600.00000       1600.00|    1600.00000       1600.00|    1600.00000        1600.00
  LIGHTING CONTROL CENTER, TYPE D         |                            |                            |
0044 A070.10                  80.000  m   |       5.00000        400.00|       5.00000        400.00|       5.00000         400.00
  38 mm CONDUIT IN TRENCH                 |                            |                            |
0045 A072.10                  10.000  m   |       5.00000         50.00|       5.00000         50.00|       5.00000          50.00
  38 mm CONDUIT UNDER ROADWAY             |                            |                            |
0046 A080.22                  90.000  m   |       1.00000         90.00|       1.00000         90.00|       1.00000          90.00
  STREET LIGHTING CABLE, NO. 6 BARE       |                            |                            |
0047 A080.24                 180.000  m   |       1.65000        297.00|       1.65000        297.00|       1.75000         315.00
  STREET LIGHTING CABLE, NO. 6 USE        |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 6
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(1) 0875                    |(2) 1344                    |(3) 0477
                                          |BROWER CONSTRUCTION CO.     |DOBSON BROTHERS CONSTRUCTION|WESTERN ENGINEERING COMPANY,
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0048 0030.81                          LUMP|    2182.00000       2182.00|    2100.00000       2100.00|    2200.00000        2200.00
  MOBILIZATION                            |                            |                            |
     SECTION TOTALS                       |             $      8,219.00|             $      8,137.00|                $      8,255.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0005   GROUP 9 BITUMINOUS
                                          |                            |                            |
0049 L001.01                   3.500  ha  |    2115.95000       7405.83|    1900.00000       6650.00|    2100.00000        7350.00
  SEEDING, TYPE A                         |                            |                            |
0050 L001.02                  15.200  ha  |    1064.54000      16181.01|     900.00000      13680.00|    1060.00000       16112.00
  SEEDING, TYPE B                         |                            |                            |
0051 L020.00                2441.400  m2  |       1.65000       4028.31|       1.20000       2929.68|       1.65000        4028.31
  EROSION CONTROL                         |                            |                            |
0052 L020.02               10142.000  m2  |       1.57000      15922.94|       1.20000      12170.40|       1.56000       15821.52
  EROSION CONTROL, TYPE B                 |                            |                            |
0053 L020.07                4973.000  m2  |       3.78000      18797.94|       3.75000      18648.75|       3.75000       18648.75
  EROSION CONTROL, TYPE B-1               |                            |                            |
0054 L022.11                  98.000  m   |      12.52000       1226.96|       9.00000        882.00|      12.50000        1225.00
  FABRIC SILT FENCE-LOW POROSITY          |                            |                            |
0055 L032.75                  93.700  Mg  |      78.78000       7381.69|      60.00000       5622.00|      80.00000        7496.00
  MULCH                                   |                            |                            |
0056 0002.40                 320.160  StaM|      18.00000       5762.88|      18.00000       5762.88|      18.25000        5842.92
  TEMPORARY SOLID LINES                   |                            |                            |
0057 0002.45                 640.320  StaM|      18.00000      11525.76|      18.00000      11525.76|      18.25000       11685.84
  TEMPORARY BROKEN LINES                  |                            |                            |
0058 0030.90                          LUMP|   44244.29000      44244.29|   75000.00000      75000.00|   15000.00000       15000.00
  MOBILIZATION                            |                            |                            |
0059 1009.00                          LUMP|    3000.00000       3000.00|    2683.82000       2683.82|    6000.00000        6000.00
  GENERAL CLEARING AND GRUBBING           |                            |                            |
0060 1020.03                  93.000  EACH|      12.50000       1162.50|      12.50000       1162.50|      13.00000        1209.00
  DELINEATOR,  TYPE III                   |                            |                            |
0061 1030.00                3050.000  m3  |       5.50000      16775.00|       5.17000      15768.50|       6.60000       20130.00
  EARTHWORK MEASURED IN EMBANKMENT        |                            |                            |
0062 1102.00                 585.400  m2  |       5.00000       2927.00|      12.37000       7241.40|       2.50000        1463.50
  REMOVE ASPHALT SURFACE                  |                            |                            |
0063 2001.00                 210.000  m3  |      17.33000       3639.30|      19.86000       4170.60|      18.50000        3885.00
  GRAVEL SURFACE COURSE                   |                            |                            |
0064 2020.00                 915.000  m2  |       6.00000       5490.00|       6.59000       6029.85|       2.00000        1830.00
  SPECIAL SURFACE COURSE FOR MAILBOX      |                            |                            |
  TURNOUTS                                |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 7
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(1) 0875                    |(2) 1344                    |(3) 0477
                                          |BROWER CONSTRUCTION CO.     |DOBSON BROTHERS CONSTRUCTION|WESTERN ENGINEERING COMPANY,
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0065 2021.00                  13.000  EACH|      50.00000        650.00|      50.00000        650.00|      50.00000         650.00
  MAILBOX POST                            |                            |                            |
0066 3014.12                 152.000  m   |      69.00000      10488.00|      49.32000       7496.64|      60.00000        9120.00
  COMBINATION CONCRETE CLASS 47B-25 CURB  |                            |                            |
  AND GUTTER                              |                            |                            |
0067 3016.21                 802.000  m2  |      43.05000      34526.10|      32.88000      26369.76|      50.00000       40100.00
  CONCRETE CLASS 47B-20 SIDEWALKS         |                            |                            |
0068 3089.25                 373.000  m2  |      53.36000      19903.28|      30.91000      11529.43|      60.00000       22380.00
  TEMPORARY SURFACING                     |                            |                            |
0069 5812.00                   4.000  EACH|     780.00000       3120.00|    2000.00000       8000.00|     500.00000        2000.00
  EXHIBIT BASE                            |                            |                            |
0070 5812.01                   4.000  EACH|     900.00000       3600.00|    2000.00000       8000.00|     500.00000        2000.00
  PILLAR BASE                             |                            |                            |
0071 6406.00                 640.000  m   |      50.50000      32320.00|      81.65000      52256.00|      92.00000       58880.00
  PEDESTRIAN HANDRAIL                     |                            |                            |
0072 9000.75                 750.000  Mg  |      15.08000      11310.00|      15.00000      11250.00|      17.10000       12825.00
  ASPHALTIC CONCRETE FOR STATE            |                            |                            |
  MAINTENANCE PATCHING, TYPE SP1(12.5)    |                            |                            |
0073 9000.75                 500.000  Mg  |      17.23000       8615.00|      16.00000       8000.00|      19.00000        9500.00
  ASPHALTIC CONCRETE FOR STATE            |                            |                            |
  MAINTENANCE PATCHING, TYPE SP2(12.5)    |                            |                            |
0074 9005.00                 250.000  Mg  |      33.27000       8317.50|      27.09000       6772.50|      25.35000        6337.50
  ASPHALTIC CONCRETE FOR PATCHING, TYPE   |                            |                            |
  SP1(12.5)                               |                            |                            |
0075 9005.25               31460.000  Mg  |      15.08000     474416.80|      17.93000     564077.80|      19.70000      619762.00
  ASPHALTIC CONCRETE, TYPE SP1(12.5)      |                            |                            |
0076 9005.30               20030.000  Mg  |      17.23000     345116.90|      19.01000     380770.30|      21.25000      425637.50
  ASPHALTIC CONCRETE, TYPE SP2(12.5)      |                            |                            |
0077 9009.00                5425.000  m2  |       2.70000      14647.50|       1.96000      10633.00|       1.20000        6510.00
  PLACEMENT OF ASPHALTIC CONCRETE FOR     |                            |                            |
  DRIVEWAYS AND INTERSECTIONS             |                            |                            |
0078 9020.91                  66.500  Mg  |     176.81000      11757.87|     175.00000      11637.50|     176.00000       11704.00
  PERFORMANCE GRADED BINDER (64-22) FOR   |                            |                            |
  STATE MAINTENANCE PATCHING              |                            |                            |
0079 9021.01                2753.900  Mg  |     176.81000     486917.06|     175.00000     481932.50|     176.00000      484686.40
  PERFORMANCE GRADED BINDER (64-22)       |                            |                            |
0080 9034.00                 698.000  m2  |       2.50000       1745.00|       2.01000       1402.98|       1.75000        1221.50
  PREPARATION OF INTERSECTIONS AND        |                            |                            |
  DRIVEWAYS                               |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 8
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(1) 0875                    |(2) 1344                    |(3) 0477
                                          |BROWER CONSTRUCTION CO.     |DOBSON BROTHERS CONSTRUCTION|WESTERN ENGINEERING COMPANY,
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0081 9053.00               54470.000  L   |       0.21000      11438.70|       0.21000      11438.70|       0.25000       13617.50
  TACK COAT                               |                            |                            |
0082 9110.01                  55.000  HOUR|      65.00000       3575.00|      50.00000       2750.00|      55.00000        3025.00
  RENTAL OF LOADER, FULLY OPERATED        |                            |                            |
0083 9110.02                  50.000  HOUR|      65.00000       3250.00|      50.00000       2500.00|      55.00000        2750.00
  RENTAL OF MOTOR GRADER, FULLY OPERATED  |                            |                            |
0084 9110.03                  55.000  HOUR|      55.00000       3025.00|      44.00000       2420.00|      40.00000        2200.00
  RENTAL OF DUMP TRUCK, FULLY OPERATED    |                            |                            |
0085 9110.07                  55.000  HOUR|      45.00000       2475.00|      32.00000       1760.00|      30.00000        1650.00
  RENTAL OF SKID LOADER, FULLY OPERATED   |                            |                            |
0086 9111.00                1547.000  kL  |       2.60000       4022.20|       2.36000       3650.92|       2.00000        3094.00
  WATER                                   |                            |                            |
0087 9170.00                 319.194  StaM|     150.38000      48000.39|     189.17000      60381.93|     160.00000       51071.04
  EARTH SHOULDER CONSTRUCTION             |                            |                            |
0088 9170.01                   9.494  StaM|    2573.60000      24433.76|    2058.26000      19541.12|    1800.00000       17089.20
  EARTH SHOULDER CONSTRUCTION             |                            |                            |
0089 9171.20               33863.000  m2  |       0.79000      26751.77|       1.20000      40635.60|       1.20000       40635.60
  SUBGRADE RECONSTRUCTION                 |                            |                            |
0090 9173.20                6898.000  m2  |       0.76000       5242.48|       2.04000      14071.92|       1.20000        8277.60
  SUBGRADE PREPARATION                    |                            |                            |
0091 9179.23                 160.540  StaM|     418.74000      67224.52|     334.33000      53673.34|     310.00000       49767.40
  COLD MILLING, CLASS 3                   |                            |                            |
0092 9188.50                 708.000  m2  |      11.00000       7788.00|      14.83000      10499.64|      30.00000       21240.00
  SURFACING UNDER GUARDRAIL               |                            |                            |
0093 9300.50                  20.664  LS  |    3500.00000       3500.00|    3143.20000       3143.20|    4000.00000        4000.00
  ASPHALT PAVEMENT SMOOTHNESS TESTING     |                            |                            |
     SECTION TOTALS                       |             $  1,843,649.24|             $  2,007,172.92|                $  2,069,459.08
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0006   GROUP 10A GENERAL ITEMS
                                          |                            |                            |
0094 0001.08               17383.000  BDAY|       0.50000       8691.50|       0.50000       8691.50|       0.50000        8691.50
  BARRICADE, TYPE II                      |                            |                            |
0095 0001.10                2712.000  BDAY|       2.00000       5424.00|       2.00000       5424.00|       2.10000        5695.20
  BARRICADE, TYPE III                     |                            |                            |
0096 0001.30                 738.000  LDAY|       2.25000       1660.50|       2.25000       1660.50|       2.30000        1697.40
  TYPE B HIGH INTENSITY WARNING LIGHT     |                            |                            |
0097 0001.90               20350.000  EACH|       0.10000       2035.00|       0.10000       2035.00|       0.11000        2238.50
  SIGN DAY                                |                            |                            |
0098 0002.30                 530.000  m   |       1.00000        530.00|       1.00000        530.00|       1.00000         530.00
  PAVEMENT MARKING REMOVAL                |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 9
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(1) 0875                    |(2) 1344                    |(3) 0477
                                          |BROWER CONSTRUCTION CO.     |DOBSON BROTHERS CONSTRUCTION|WESTERN ENGINEERING COMPANY,
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0099 0002.39                 990.000  m   |       3.00000       2970.00|       3.00000       2970.00|       3.00000        2970.00
  TEMPORARY PAVEMENT MARKING, TYPE II     |                            |                            |
0100 0003.10                 100.000  DAY |     200.00000      20000.00|     167.43000      16743.00|     185.00000       18500.00
  FLAGGING                                |                            |                            |
0101 0003.51                 230.000  m   |      65.00000      14950.00|      45.00000      10350.00|      35.00000        8050.00
  INSTALL CONCRETE PROTECTION BARRIER     |                            |                            |
0102 0010.04                   2.000  EACH|    1700.00000       3400.00|    1838.55000       3677.10|    3500.00000        7000.00
  FIELD OFFICE                            |                            |                            |
0103 0030.00                          LUMP|    3000.00000       3000.00|    2500.00000       2500.00|    1000.00000        1000.00
  MOBILIZATION                            |                            |                            |
     SECTION TOTALS                       |             $     62,661.00|             $     54,581.10|                $     56,372.60
------------------------------------------+----------------------------+----------------------------+-------------------------------
     CONTRACT TOTALS                      |             $  2,766,874.47|             $  2,817,736.37|                $  2,989,636.73
====================================================================================================================================
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 10
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(4) 0574                    |(5) 0086                    |(6) 1661
                                          |CONSTRUCTORS, INC.          |HENNINGSEN CONST., INC.     |U.S. ASPHALT CO.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001   GROUP 6 BRIDGE AT STA. 48+86.40
               1-26.00 M SPAN PRESTRESSED CONCRETE INVERTED TEE GIRDER BRDG
                                          |                            |                            |
0001 0030.60                          LUMP|   26000.00000      26000.00|   25000.00000      25000.00|   25754.55000       25754.55
  MOBILIZATION                            |                            |                            |
0002 1043.50                 422.000  m2  |       2.55000       1076.10|       2.50000       1055.00|       2.58000        1088.76
  RIPRAP FILTER FABRIC                    |                            |                            |
0003 3050.15                 117.100  m3  |     262.00000      30680.20|     255.00000      29860.50|     262.70000       30762.17
  CONCRETE FOR PAVEMENT APPROACHES CLASS  |                            |                            |
  47BD-30                                 |                            |                            |
0004 3051.10                7695.000  kg  |       1.38000      10619.10|       1.35000      10388.25|       1.39000       10696.05
  EPOXY COATED REINFORCING STEEL FOR      |                            |                            |
  PAVEMENT APPROACHES                     |                            |                            |
0005 6000.10                  50.000  LS  |    5200.00000       5200.00|    5000.00000       5000.00|    5150.91000        5150.91
  ABUTMENT NO.1 EXCAVATION                |                            |                            |
0006 6000.11                  50.000  LS  |    5200.00000       5200.00|    5000.00000       5000.00|    5150.91000        5150.91
  ABUTMENT NO.2 EXCAVATION                |                            |                            |
0007 6010.22                  47.700  m3  |     500.00000      23850.00|     465.00000      22180.50|     499.64000       23832.83
  CLASS 47B-20 CONCRETE FOR BRIDGE        |                            |                            |
0008 6010.26                  71.500  m3  |     515.00000      36822.50|     500.00000      35750.00|     515.09000       36828.94
  CLASS 47BD-30 CONCRETE FOR BRIDGE       |                            |                            |
0009 6011.11                  85.200  LS  |  103000.00000     103000.00|  100000.00000     100000.00|  103018.22000      103018.22
  PRECAST/PRESTRESSED CONCRETE            |                            |                            |
  SUPERSTRUCTURE AT STA. 48+86.40         |                            |                            |
0010 6040.00                   1.000  EACH|   18500.00000      18500.00|   18000.00000      18000.00|   18543.28000       18543.28
  REMOVE STRUCTURE AT STA. 48+90.60       |                            |                            |
0011 6104.00                 415.000  Mg  |      22.50000       9337.50|      22.00000       9130.00|      22.66000        9403.90
  BROKEN CONCRETE RIPRAP                  |                            |                            |
0012 6131.50               10430.000  kg  |       1.38000      14393.40|       1.35000      14080.50|       1.39000       14497.70
  EPOXY COATED REINFORCING STEEL          |                            |                            |
0013 6139.50                  34.000  m2  |      34.00000       1156.00|      33.00000       1122.00|      34.00000        1156.00
  SUBSURFACE DRAINAGE MATTING             |                            |                            |
0014 6200.00                 377.900  m   |      86.00000      32499.40|      84.00000      31743.60|      86.54000       32703.47
  CONCRETE PILING                         |                            |                            |
0015 6310.00                 254.500  m2  |     129.00000      32830.50|     125.00000      31812.50|     128.77000       32771.97
  STEEL SHEET PILING                      |                            |                            |
0016 8091.00                 110.000  m3  |      37.00000       4070.00|      36.00000       3960.00|      37.09000        4079.90
  GRANULAR BACKFILL                       |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 11
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(4) 0574                    |(5) 0086                    |(6) 1661
                                          |CONSTRUCTORS, INC.          |HENNINGSEN CONST., INC.     |U.S. ASPHALT CO.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
     SECTION TOTALS                       |             $    355,234.70|             $    344,082.85|                $    355,439.56
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0002   GROUP 6A BRIDGE AT STA. 154+20.96
               1-15.00 M & 2-14.00 M SPANS PREST CONC INVERTED TEE GRDR BR
                                          |                            |                            |
0017 0030.60                          LUMP|   47000.00000      47000.00|   45000.00000      45000.00|   46358.20000       46358.20
  MOBILIZATION                            |                            |                            |
0018 1043.50                 623.000  m2  |       2.58000       1607.34|       2.50000       1557.50|       2.58000        1607.34
  RIPRAP FILTER FABRIC                    |                            |                            |
0019 3050.15                 116.400  m3  |     245.00000      28518.00|     240.00000      27936.00|     247.24000       28778.74
  CONCRETE FOR PAVEMENT APPROACHES CLASS  |                            |                            |
  47BD-30                                 |                            |                            |
0020 3051.10                7710.000  kg  |       1.22000       9406.20|       1.20000       9252.00|       1.24000        9560.40
  EPOXY COATED REINFORCING STEEL FOR      |                            |                            |
  PAVEMENT APPROACHES                     |                            |                            |
0021 6000.10                  45.000  LS  |    5200.00000       5200.00|    5000.00000       5000.00|    5150.91000        5150.91
  ABUTMENT NO.1 EXCAVATION                |                            |                            |
0022 6000.11                  45.000  LS  |    5200.00000       5200.00|    5000.00000       5000.00|    5150.91000        5150.91
  ABUTMENT NO.2 EXCAVATION                |                            |                            |
0023 6001.50                  10.000  LS  |    5200.00000       5200.00|    5000.00000       5000.00|    5150.91000        5150.91
  BENT NO.1 EXCAVATION                    |                            |                            |
0024 6001.51                  10.000  LS  |    5200.00000       5200.00|    5000.00000       5000.00|    5150.91000        5150.91
  BENT NO.2 EXCAVATION                    |                            |                            |
0025 6010.22                 130.300  m3  |     515.00000      67104.50|     500.00000      65150.00|     515.09000       67116.23
  CLASS 47B-20 CONCRETE FOR BRIDGE        |                            |                            |
0026 6010.26                 103.700  m3  |     515.00000      53405.50|     500.00000      51850.00|     515.09000       53414.83
  CLASS 47BD-30 CONCRETE FOR BRIDGE       |                            |                            |
0027 6011.11                  92.300  LS  |  119000.00000     119000.00|  115000.00000     115000.00|  118470.95000      118470.95
  PRECAST/PRESTRESSED CONCRETE            |                            |                            |
  SUPERSTRUCTURE AT STA. 154+20.96        |                            |                            |
0028 6040.00                   1.000  EACH|   25800.00000      25800.00|   25000.00000      25000.00|   25754.55000       25754.55
  REMOVE STRUCTURE AT STA. 154+21.00      |                            |                            |
0029 6080.00                 720.000  kg  |       5.15000       3708.00|       5.00000       3600.00|       5.15000        3708.00
  STRUCTURAL STEEL FOR SUBSTRUCTURE       |                            |                            |
0030 6104.00                 600.000  Mg  |      17.50000      10500.00|      17.00000      10200.00|      17.51000       10506.00
  BROKEN CONCRETE RIPRAP                  |                            |                            |
0031 6131.50               19455.000  kg  |       1.22000      23735.10|       1.20000      23346.00|       1.24000       24124.20
  EPOXY COATED REINFORCING STEEL          |                            |                            |
0032 6139.50                  28.000  m2  |      41.00000       1148.00|      40.00000       1120.00|      41.21000        1153.88
  SUBSURFACE DRAINAGE MATTING             |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 12
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(4) 0574                    |(5) 0086                    |(6) 1661
                                          |CONSTRUCTORS, INC.          |HENNINGSEN CONST., INC.     |U.S. ASPHALT CO.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0033 6210.12                 427.200  m   |      68.00000      29049.60|      66.00000      28195.20|      67.99000       29045.33
  HP 250 mm X 62 kg STEEL PILING          |                            |                            |
0034 6310.00                 254.400  m2  |     133.00000      33835.20|     130.00000      33072.00|     133.92000       34069.25
  STEEL SHEET PILING                      |                            |                            |
0035 8091.00                 115.000  m3  |      25.50000       2932.50|      25.00000       2875.00|      25.75000        2961.25
  GRANULAR BACKFILL                       |                            |                            |
     SECTION TOTALS                       |             $    477,549.94|             $    463,153.70|                $    477,232.79
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0003   GROUP 7 GUARDRAIL
                                          |                            |                            |
0036 0030.70                          LUMP|    1900.00000       1900.00|    2500.00000       2500.00|    1482.64000        1482.64
  MOBILIZATION                            |                            |                            |
0037 7011.20                  99.000  m   |      43.00000       4257.00|      42.00000       4158.00|      43.27000        4283.73
  W-BEAM GUARDRAIL                        |                            |                            |
0038 7017.00                 168.000  m   |       8.50000       1428.00|       8.35000       1402.80|       8.60000        1444.80
  REMOVE GUARDRAIL                        |                            |                            |
0039 7018.01                 168.000  m   |      37.00000       6216.00|      36.00000       6048.00|      37.09000        6231.12
  RESET GUARDRAIL                         |                            |                            |
0040 7020.00                  10.000  EACH|    1240.00000      12400.00|    1200.00000      12000.00|    1236.22000       12362.20
  BRIDGE APPROACH SECTIONS                |                            |                            |
0041 7021.70                  10.000  EACH|    1550.00000      15500.00|    1500.00000      15000.00|    1545.27000       15452.70
  GUARDRAIL END TREATMENT, SRT-350        |                            |                            |
     SECTION TOTALS                       |             $     41,701.00|             $     41,108.80|                $     41,257.19
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0004   GROUP 8B ELECTRICAL
                                          |                            |                            |
0042 A009.14                   2.000  EACH|    1860.00000       3720.00|    1800.00000       3600.00|    1854.33000        3708.66
  STREET LIGHTING UNIT, TYPE              |                            |                            |
  SL-BT-12.2-3.7-0.25                     |                            |                            |
0043 A020.10                   1.000  EACH|    1650.00000       1650.00|    1600.00000       1600.00|    1648.29000        1648.29
  LIGHTING CONTROL CENTER, TYPE D         |                            |                            |
0044 A070.10                  80.000  m   |       5.15000        412.00|       5.00000        400.00|       5.15000         412.00
  38 mm CONDUIT IN TRENCH                 |                            |                            |
0045 A072.10                  10.000  m   |       5.15000         51.50|       5.00000         50.00|       5.15000          51.50
  38 mm CONDUIT UNDER ROADWAY             |                            |                            |
0046 A080.22                  90.000  m   |       1.00000         90.00|       1.10000         99.00|       1.03000          92.70
  STREET LIGHTING CABLE, NO. 6 BARE       |                            |                            |
0047 A080.24                 180.000  m   |       1.70000        306.00|       1.65000        297.00|       1.70000         306.00
  STREET LIGHTING CABLE, NO. 6 USE        |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 13
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(4) 0574                    |(5) 0086                    |(6) 1661
                                          |CONSTRUCTORS, INC.          |HENNINGSEN CONST., INC.     |U.S. ASPHALT CO.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0048 0030.81                          LUMP|    2100.00000       2100.00|    2100.00000       2100.00|    2163.38000        2163.38
  MOBILIZATION                            |                            |                            |
     SECTION TOTALS                       |             $      8,329.50|             $      8,146.00|                $      8,382.53
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0005   GROUP 9 BITUMINOUS
                                          |                            |                            |
0049 L001.01                   3.500  ha  |    1960.00000       6860.00|    2095.00000       7332.50|    1957.35000        6850.73
  SEEDING, TYPE A                         |                            |                            |
0050 L001.02                  15.200  ha  |     930.00000      14136.00|    1054.00000      16020.80|     927.16000       14092.83
  SEEDING, TYPE B                         |                            |                            |
0051 L020.00                2441.400  m2  |       1.22000       2978.51|       1.63000       3979.48|       1.24000        3027.34
  EROSION CONTROL                         |                            |                            |
0052 L020.02               10142.000  m2  |       1.22000      12373.24|       1.55000      15720.10|       1.24000       12576.08
  EROSION CONTROL, TYPE B                 |                            |                            |
0053 L020.07                4973.000  m2  |       3.80000      18897.40|       3.74000      18599.02|       3.86000       19195.78
  EROSION CONTROL, TYPE B-1               |                            |                            |
0054 L022.11                  98.000  m   |       9.25000        906.50|      12.40000       1215.20|       9.27000         908.46
  FABRIC SILT FENCE-LOW POROSITY          |                            |                            |
0055 L032.75                  93.700  Mg  |      62.00000       5809.40|      78.00000       7308.60|      61.81000        5791.60
  MULCH                                   |                            |                            |
0056 0002.40                 320.160  StaM|      18.50000       5922.96|      18.00000       5762.88|      18.54000        5935.77
  TEMPORARY SOLID LINES                   |                            |                            |
0057 0002.45                 640.320  StaM|      18.50000      11845.92|      18.00000      11525.76|      18.54000       11871.53
  TEMPORARY BROKEN LINES                  |                            |                            |
0058 0030.90                          LUMP|   80000.00000      80000.00|   39000.00000      39000.00|   46127.96000       46127.96
  MOBILIZATION                            |                            |                            |
0059 1009.00                          LUMP|    1500.00000       1500.00|    2500.00000       2500.00|    5150.91000        5150.91
  GENERAL CLEARING AND GRUBBING           |                            |                            |
0060 1020.03                  93.000  EACH|      12.90000       1199.70|      12.50000       1162.50|      12.88000        1197.84
  DELINEATOR,  TYPE III                   |                            |                            |
0061 1030.00                3050.000  m3  |       8.20000      25010.00|       5.25000      16012.50|       5.41000       16500.50
  EARTHWORK MEASURED IN EMBANKMENT        |                            |                            |
0062 1102.00                 585.400  m2  |       2.60000       1522.04|       7.50000       4390.50|       4.56000        2669.42
  REMOVE ASPHALT SURFACE                  |                            |                            |
0063 2001.00                 210.000  m3  |      14.75000       3097.50|      19.50000       4095.00|      36.39000        7641.90
  GRAVEL SURFACE COURSE                   |                            |                            |
0064 2020.00                 915.000  m2  |       4.75000       4346.25|       7.00000       6405.00|       3.89000        3559.35
  SPECIAL SURFACE COURSE FOR MAILBOX      |                            |                            |
  TURNOUTS                                |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 14
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(4) 0574                    |(5) 0086                    |(6) 1661
                                          |CONSTRUCTORS, INC.          |HENNINGSEN CONST., INC.     |U.S. ASPHALT CO.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0065 2021.00                  13.000  EACH|      62.00000        806.00|      50.00000        650.00|      51.51000         669.63
  MAILBOX POST                            |                            |                            |
0066 3014.12                 152.000  m   |      80.00000      12160.00|      58.00000       8816.00|      81.33000       12362.16
  COMBINATION CONCRETE CLASS 47B-25 CURB  |                            |                            |
  AND GUTTER                              |                            |                            |
0067 3016.21                 802.000  m2  |      60.00000      48120.00|      40.50000      32481.00|      60.99000       48913.98
  CONCRETE CLASS 47B-20 SIDEWALKS         |                            |                            |
0068 3089.25                 373.000  m2  |      42.40000      15815.20|      46.50000      17344.50|      40.66000       15166.18
  TEMPORARY SURFACING                     |                            |                            |
0069 5812.00                   4.000  EACH|    4600.00000      18400.00|    2500.00000      10000.00|   18028.19000       72112.76
  EXHIBIT BASE                            |                            |                            |
0070 5812.01                   4.000  EACH|    3900.00000      15600.00|    2000.00000       8000.00|    7726.37000       30905.48
  PILLAR BASE                             |                            |                            |
0071 6406.00                 640.000  m   |      89.00000      56960.00|      50.00000      32000.00|      94.42000       60428.80
  PEDESTRIAN HANDRAIL                     |                            |                            |
0072 9000.75                 750.000  Mg  |      19.30000      14475.00|      18.00000      13500.00|      25.33000       18997.50
  ASPHALTIC CONCRETE FOR STATE            |                            |                            |
  MAINTENANCE PATCHING, TYPE SP1(12.5)    |                            |                            |
0073 9000.75                 500.000  Mg  |      20.35000      10175.00|      18.00000       9000.00|      29.60000       14800.00
  ASPHALTIC CONCRETE FOR STATE            |                            |                            |
  MAINTENANCE PATCHING, TYPE SP2(12.5)    |                            |                            |
0074 9005.00                 250.000  Mg  |      32.50000       8125.00|      40.00000      10000.00|      41.32000       10330.00
  ASPHALTIC CONCRETE FOR PATCHING, TYPE   |                            |                            |
  SP1(12.5)                               |                            |                            |
0075 9005.25               31460.000  Mg  |      19.85000     624481.00|      22.49000     707535.40|      25.23000      793735.80
  ASPHALTIC CONCRETE, TYPE SP1(12.5)      |                            |                            |
0076 9005.30               20030.000  Mg  |      20.35000     407610.50|      22.49000     450474.70|      25.63000      513368.90
  ASPHALTIC CONCRETE, TYPE SP2(12.5)      |                            |                            |
0077 9009.00                5425.000  m2  |       2.60000      14105.00|       1.30000       7052.50|       4.22000       22893.50
  PLACEMENT OF ASPHALTIC CONCRETE FOR     |                            |                            |
  DRIVEWAYS AND INTERSECTIONS             |                            |                            |
0078 9020.91                  66.500  Mg  |     175.50000      11670.75|     175.00000      11637.50|     181.69000       12082.39
  PERFORMANCE GRADED BINDER (64-22) FOR   |                            |                            |
  STATE MAINTENANCE PATCHING              |                            |                            |
0079 9021.01                2753.900  Mg  |     175.50000     483309.45|     175.00000     481932.50|     181.69000      500356.09
  PERFORMANCE GRADED BINDER (64-22)       |                            |                            |
0080 9034.00                 698.000  m2  |       2.15000       1500.70|       2.50000       1745.00|       1.59000        1109.82
  PREPARATION OF INTERSECTIONS AND        |                            |                            |
  DRIVEWAYS                               |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 15
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(4) 0574                    |(5) 0086                    |(6) 1661
                                          |CONSTRUCTORS, INC.          |HENNINGSEN CONST., INC.     |U.S. ASPHALT CO.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0081 9053.00               54470.000  L   |       0.21000      11438.70|       0.25000      13617.50|       0.22000       11983.40
  TACK COAT                               |                            |                            |
0082 9110.01                  55.000  HOUR|      50.00000       2750.00|      45.00000       2475.00|      65.55000        3605.25
  RENTAL OF LOADER, FULLY OPERATED        |                            |                            |
0083 9110.02                  50.000  HOUR|      65.00000       3250.00|      75.00000       3750.00|      56.15000        2807.50
  RENTAL OF MOTOR GRADER, FULLY OPERATED  |                            |                            |
0084 9110.03                  55.000  HOUR|      42.00000       2310.00|      45.00000       2475.00|      51.15000        2813.25
  RENTAL OF DUMP TRUCK, FULLY OPERATED    |                            |                            |
0085 9110.07                  55.000  HOUR|      33.00000       1815.00|      45.00000       2475.00|      42.35000        2329.25
  RENTAL OF SKID LOADER, FULLY OPERATED   |                            |                            |
0086 9111.00                1547.000  kL  |       2.20000       3403.40|       2.35000       3635.45|       2.72000        4207.84
  WATER                                   |                            |                            |
0087 9170.00                 319.194  StaM|     320.00000     102142.08|     190.00000      60646.86|     180.28000       57544.29
  EARTH SHOULDER CONSTRUCTION             |                            |                            |
0088 9170.01                   9.494  StaM|     500.00000       4747.00|    2020.00000      19177.88|     180.28000        1711.58
  EARTH SHOULDER CONSTRUCTION             |                            |                            |
0089 9171.20               33863.000  m2  |       0.87000      29460.81|       1.75000      59260.25|       1.34000       45376.42
  SUBGRADE RECONSTRUCTION                 |                            |                            |
0090 9173.20                6898.000  m2  |       1.30000       8967.40|       1.30000       8967.40|       1.24000        8553.52
  SUBGRADE PREPARATION                    |                            |                            |
0091 9179.23                 160.540  StaM|     418.00000      67105.72|     325.00000      52175.50|     319.36000       51270.05
  COLD MILLING, CLASS 3                   |                            |                            |
0092 9188.50                 708.000  m2  |      23.50000      16638.00|      27.00000      19116.00|      24.64000       17445.12
  SURFACING UNDER GUARDRAIL               |                            |                            |
0093 9300.50                  20.664  LS  |    1300.00000       1300.00|    5000.00000       5000.00|    3273.51000        3273.51
  ASPHALT PAVEMENT SMOOTHNESS TESTING     |                            |                            |
     SECTION TOTALS                       |             $  2,195,047.13|             $  2,215,970.78|                $  2,504,251.97
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0006   GROUP 10A GENERAL ITEMS
                                          |                            |                            |
0094 0001.08               17383.000  BDAY|       0.50000       8691.50|       0.50000       8691.50|       0.50000        8691.50
  BARRICADE, TYPE II                      |                            |                            |
0095 0001.10                2712.000  BDAY|       2.05000       5559.60|       2.00000       5424.00|       2.06000        5586.72
  BARRICADE, TYPE III                     |                            |                            |
0096 0001.30                 738.000  LDAY|       2.30000       1697.40|       2.25000       1660.50|       2.32000        1712.16
  TYPE B HIGH INTENSITY WARNING LIGHT     |                            |                            |
0097 0001.90               20350.000  EACH|       0.10000       2035.00|       0.25000       5087.50|       0.10000        2035.00
  SIGN DAY                                |                            |                            |
0098 0002.30                 530.000  m   |       1.02000        540.60|       1.10000        583.00|       1.03000         545.90
  PAVEMENT MARKING REMOVAL                |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 02/22/01
                                                                                                             PAGE : 16
                                                        TABULATION OF BIDS

     CALL ORDER   : F10                    CONTRACT ID : 32041                       COUNTIES : DIXON           CEDAR
     LETTING DATE : 02/22/01  1:30 PM       DISTRICT    : 3
                                                                                     PROJECT(S) : DPS-EACNH-57-4(108)
                                                                                                  EACSTPD-EACBR-57-4(110)



====================================================================================================================================
                                          |(4) 0574                    |(5) 0086                    |(6) 1661
                                          |CONSTRUCTORS, INC.          |HENNINGSEN CONST., INC.     |U.S. ASPHALT CO.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0099 0002.39                 990.000  m   |       3.05000       3019.50|       3.00000       2970.00|       3.09000        3059.10
  TEMPORARY PAVEMENT MARKING, TYPE II     |                            |                            |
0100 0003.10                 100.000  DAY |     160.00000      16000.00|     200.00000      20000.00|     179.49000       17949.00
  FLAGGING                                |                            |                            |
0101 0003.51                 230.000  m   |      42.50000       9775.00|      45.00000      10350.00|      31.08000        7148.40
  INSTALL CONCRETE PROTECTION BARRIER     |                            |                            |
0102 0010.04                   2.000  EACH|    1900.00000       3800.00|    2500.00000       5000.00|    1442.26000        2884.52
  FIELD OFFICE                            |                            |                            |
0103 0030.00                          LUMP|    3000.00000       3000.00|   23000.00000      23000.00|   22466.87000       22466.87
  MOBILIZATION                            |                            |                            |
     SECTION TOTALS                       |             $     54,118.60|             $     82,766.50|                $     72,079.17
------------------------------------------+----------------------------+----------------------------+-------------------------------
     CONTRACT TOTALS                      |             $  3,131,980.87|             $  3,155,228.63|                $  3,458,643.21
====================================================================================================================================