Contract Letting July 12, 2001 |
VENDOR RANKING CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) CONTRACT DESCRIPTION : EACIM-680-9(793) I-680, WEST DODGE ROAD INTERCHANGE, OMAHA. EACIM-680-9(803) -------------------------------------------------------------------------------------------------------------------------- VENDOR NO. BID NOTES -------------------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID -------------------------------------------------------------------------------------------------------------------------- 1 0103 CHAS. VRANA & SON CONSTRUCTION CO. $ 5,026,696.99 100.0000% 2 0049 HAWKINS CONSTRUCTION COMPANY $ 5,091,275.59 101.2847% NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 GROUP 1 GRADING | | | 0001 L010.98 422.400 m2 | 7.80000 3294.72| 11.33000 4785.79| TEMPORARY EROSION CONTROL | | | 0002 L020.00 28481.000 m2 | 1.40000 39873.40| 1.45000 41297.45| EROSION CONTROL | | | 0003 L020.01 3462.000 m2 | 5.50000 19041.00| 5.66000 19594.92| EROSION CONTROL, TYPE A | | | 0004 L020.10 5082.000 m2 | 1.50000 7623.00| 1.50000 7623.00| EROSION CONTROL, TYPE HV | | | 0005 L021.01 89.000 BALE| 18.00000 1602.00| 18.10000 1610.90| EROSION CHECKS, TYPE A | | | 0006 L021.06 36.000 BALE| 15.00000 540.00| 14.71000 529.56| EROSION CHECKS, TYPE HV | | | 0007 L022.11 101.800 m | 8.00000 814.40| 7.92000 806.26| FABRIC SILT FENCE-LOW POROSITY | | | 0008 L022.12 156.700 m | 9.00000 1410.30| 9.05000 1418.14| FABRIC SILT FENCE-HIGH POROSITY | | | 0009 L022.23 90.500 m | 20.00000 1810.00| 18.10000 1638.05| FABRIC SILT FENCE-WP-WW-LOW POROSITY | | | 0010 L022.24 80.600 m | 20.00000 1612.00| 18.10000 1458.86| FABRIC SILT FENCE-WP-WW-HIGH POROSITY | | | 0011 0030.10 LUMP| 71755.00000 71755.00| 32814.00000 32814.00| MOBILIZATION | | | 0012 1009.00 LUMP| 25000.00000 25000.00| 17878.00000 17878.00| GENERAL CLEARING AND GRUBBING | | | 0013 1010.00 160960.000 m3 | 3.25000 523120.00| 3.37000 542435.20| EXCAVATION | | | 0014 1011.00 3219.000 kL | 1.20000 3862.80| 1.81000 5826.39| WATER | | | 0015 1021.10 71.000 EACH| 5.00000 355.00| 3.39000 240.69| REMOVE DELINEATOR UNITS | | | 0016 1101.25 283.200 m | 8.20000 2322.24| 8.20000 2322.24| SAWING PAVEMENT | | | 0017 1102.00 6455.000 m2 | 2.60000 16783.00| 2.50000 16137.50| REMOVE ASPHALT SURFACE | | | 0018 1109.20 8.800 m | 17.50000 154.00| 227.00000 1997.60| REMOVE CONCRETE BARRIER | | | 1 NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0019 1123.00 1025.000 m2 | 5.00000 5125.00| 2.70000 2767.50| REMOVE CONCRETE DITCH LINER | | | 0020 3275.20 11915.000 m2 | 6.20000 73873.00| 6.30000 75064.50| CRUSH CONCRETE PAVEMENT | | | 0021 7017.00 233.800 m | 5.00000 1169.00| 4.53000 1059.11| REMOVE GUARDRAIL | | | 0022 9110.01 10.000 HOUR| 120.00000 1200.00| 113.00000 1130.00| RENTAL OF LOADER, FULLY OPERATED | | | 0023 9110.03 10.000 HOUR| 100.00000 1000.00| 85.00000 850.00| RENTAL OF DUMP TRUCK, FULLY OPERATED | | | 0024 9110.07 10.000 HOUR| 100.00000 1000.00| 85.00000 850.00| RENTAL OF SKID LOADER, FULLY OPERATED | | | SECTION TOTALS | $ 804,339.86| $ 782,135.66| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 GROUP 1A MSE WALL | | | 0025 0030.10 LUMP| 5000.00000 5000.00| 3789.00000 3789.00| MOBILIZATION | | | 0026 4095.00 602.000 m2 | 200.00000 120400.00| 195.51000 117697.02| CONCRETE FACE PANELS | | | 0027 4095.10 113.700 m | 48.60000 5525.82| 19.99000 2272.86| CONCRETE LEVELING PADS | | | 0028 4095.20 115.900 m | 92.10000 10674.39| 157.68000 18275.11| COPING | | | 0029 4350.24 215.700 m | 36.20000 7808.34| 44.94000 9693.56| 600 mm CORRUGATED METAL PIPE | | | 0030 8024.75 2579.000 m3 | 24.00000 61896.00| 30.25000 78014.75| SELECT GRANULAR BACKFILL FOR MSE WALL | | | SECTION TOTALS | $ 211,304.55| $ 229,742.30| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 GROUP 3 CONCRETE PAVEMENT | | | 0031 L001.01 4.300 ha | 1500.00000 6450.00| 1615.00000 6944.50| SEEDING, TYPE A | | | 0032 L001.02 1.200 ha | 1000.00000 1200.00| 905.00000 1086.00| SEEDING, TYPE B | | | 0033 L006.50 4.200 ha | 850.00000 3570.00| 849.00000 3565.80| TEMPORARY SEEDING | | | 1 NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0034 L032.75 48.500 Mg | 100.00000 4850.00| 81.47000 3951.30| MULCH | | | 0035 0030.30 LUMP| 15000.00000 15000.00| 74041.00000 74041.00| MOBILIZATION | | | 0036 1020.02 71.000 EACH| 10.50000 745.50| 11.03000 783.13| DELINEATOR, TYPE II | | | 0037 1020.15 735.000 m | 10.00000 7350.00| 8.49000 6240.15| MEDIAN CHAIN DELINEATOR | | | 0038 2020.50 4246.000 m2 | 42.20000 179181.20| 44.42000 188607.32| SURFACING 250 mm | | | 0039 3008.05 230.000 EACH| 4.60000 1058.00| 3.97000 913.10| TIE BARS | | | 0040 3016.21 15.000 m2 | 37.00000 555.00| 29.35000 440.25| CONCRETE CLASS 47B-20 SIDEWALKS | | | 0041 3027.00 5.000 EACH| 2220.00000 11100.00| 1454.00000 7270.00| CONCRETE CLASS 47BD-30 MEDIAN BARRIER | | | TRANSITION SECTION | | | 0042 3075.71 3939.000 m2 | 35.20000 138652.80| 36.17000 142473.63| 305 mm CONCRETE PAVEMENT, CLASS 47B-25 | | | 0043 3075.75 11049.000 m2 | 37.70000 416547.30| 38.65000 427043.85| 305 mm DOWELED CONCRETE PAVEMENT, CLASS | | | 47B-25 | | | 0044 3075.91 824.000 m2 | 41.60000 34278.40| 41.28000 34014.72| 355 mm CONCRETE PAVEMENT, CLASS 47B-25 | | | 0045 3075.95 931.000 m2 | 43.90000 40870.90| 44.96000 41857.76| 355 mm DOWELED CONCRETE PAVEMENT, CLASS | | | 47B-25 | | | 0046 3089.25 3896.000 m2 | 44.60000 173761.60| 46.55000 181358.80| TEMPORARY SURFACING | | | 0047 4020.25 405.000 m2 | 43.00000 17415.00| 43.16000 17479.80| CONCRETE DITCH LINING 200 mm | | | 0048 4764.35 45.800 m | 25.10000 1149.58| 10.82000 495.56| 100 mm PERFORATED PIPE UNDERDRAIN | | | 0049 8029.10 15109.000 m2 | 6.40000 96697.60| 5.81000 87783.29| AGGREGATE FOUNDATION COURSE-D 100 mm | | | 0050 8029.12 1634.000 m2 | 8.70000 14215.80| 8.34000 13627.56| AGGREGATE FOUNDATION COURSE-D 150 mm | | | 0051 8060.05 15.000 EACH| 150.00000 2250.00| 48.27000 724.05| GRANULAR SUBDRAIN | | | 1 NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0052 9111.00 337.000 kL | 4.40000 1482.80| 2.06000 694.22| WATER | | | 0053 9170.00 35.738 StaM| 650.00000 23229.70| 678.90000 24262.53| EARTH SHOULDER CONSTRUCTION | | | 0054 9173.20 16743.000 m2 | 1.60000 26788.80| 1.67000 27960.81| SUBGRADE PREPARATION | | | SECTION TOTALS | $ 1,218,399.98| $ 1,293,619.13| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0004 GROUP 4 CULVERTS | | | 0055 P070.18 280.200 m | 80.40000 22528.08| 65.91000 18467.98| 450 mm CULVERT PIPE, TYPE 2,3,4,5,6,7 | | | OR 8 | | | 0056 P120.42 27.500 m | 297.50000 8181.25| 258.36000 7104.90| 1050 mm CULVERT PIPE TYPE 2 | | | 0057 P400.36 70.500 m | 219.40000 15467.70| 133.22000 9392.01| 900 mm CULVERT PIPE, TYPE 2,5,7 OR 8 | | | 0058 P700.18 279.800 m | 87.40000 24454.52| 68.55000 19180.29| 450 mm STORM SEWER PIPE, TYPE 1,7 OR 8 | | | 0059 P702.24 99.000 m | 116.00000 11484.00| 110.99000 10988.01| 600 mm STORM SEWER PIPE, TYPE 1 | | | 0060 P702.36 16.500 m | 259.10000 4275.15| 193.44000 3191.76| 900 mm STORM SEWER PIPE, TYPE 1 | | | 0061 0030.40 LUMP| 10000.00000 10000.00| 4243.00000 4243.00| MOBILIZATION | | | 0062 1119.00 5.000 EACH| 510.00000 2550.00| 170.00000 850.00| REMOVE INLET | | | 0063 4004.50 5735.000 kg | 2.90000 16631.50| 2.87000 16459.45| CAST IRON GRATE AND FRAME | | | 0064 4035.25 3.000 EACH| 320.00000 960.00| 113.00000 339.00| REMOVE AND SALVAGE FLARED-END SECTION | | | 0065 4040.00 4.000 EACH| 290.00000 1160.00| 170.00000 680.00| REMOVE HEADWALLS FROM CULVERTS | | | 0066 4043.50 64.200 m | 33.70000 2163.54| 33.10000 2125.02| REMOVE SEWER PIPE | | | 0067 4043.60 44.600 m | 61.30000 2733.98| 104.54000 4662.48| RELAYING SEWER PIPE | | | 0068 4050.01 476.000 m3 | 11.50000 5474.00| 5.09000 2422.84| EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,| | | AND HEADWALLS | | | 1 NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0069 4100.06 0.540 m3 | 1110.00000 599.40| 609.72000 329.25| CLASS 47B-20 OR AX-20 CONCRETE FOR | | | HEADWALL | | | 0070 4105.59 28.650 m3 | 760.00000 21774.00| 439.43000 12589.67| CLASS 47B-20 CONCRETE FOR INLET AND | | | JUNCTION BOX | | | 0071 4107.07 3.900 m3 | 1020.00000 3978.00| 1512.00000 5896.80| CLASS 47B-20 OR AX-20 CONCRETE FOR | | | CONCRETE COLLARS | | | 0072 4130.06 0.300 m3 | 1700.00000 510.00| 1206.37000 361.91| CLASS 47B-20 OR AX-20 CONCRETE FOR PIPE | | | CULVERT PLUG | | | 0073 4150.00 20.000 kg | 1.90000 38.00| 1.86000 37.20| REINFORCING STEEL FOR HEADWALL | | | 0074 4155.50 1029.000 kg | 1.20000 1234.80| 1.97000 2027.13| REINFORCING STEEL FOR INLET AND | | | JUNCTION BOX | | | 0075 4157.00 189.000 kg | 1.30000 245.70| 1.86000 351.54| REINFORCING STEEL FOR COLLARS | | | 0076 4310.18 10.000 EACH| 540.00000 5400.00| 243.00000 2430.00| 450 mm FLARED-END SECTION | | | 0077 4310.24 1.000 EACH| 560.00000 560.00| 424.00000 424.00| 600 mm FLARED-END SECTION | | | 0078 4310.42 1.000 EACH| 900.00000 900.00| 757.00000 757.00| 1050 mm FLARED-END SECTION | | | 0079 4461.24 3.000 EACH| 380.00000 1140.00| 424.00000 1272.00| INSTALL 600 mm CONCRETE FLARED-END | | | SECTION | | | 0080 4670.05 2.900 m3 | 100.00000 290.00| 75.00000 217.50| CULVERT SANDFILL | | | 0081 4900.24 7.000 EACH| 670.00000 4690.00| 680.00000 4760.00| AREA INLET SEDIMENT FILTER | | | SECTION TOTALS | $ 169,423.62| $ 131,560.74| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0005 GROUP 6 BRIDGE AT STA. 802+57.238 1-35.05 m & 1-39.395 m SPAN WELDED PLATE STEEL GIRDER BRIDGE | | | 0082 0020.00 500.000 HOUR| 0.80000 400.00| 0.80000 400.00| TRAINING | | | 1 NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0083 0030.60 LUMP| 35000.00000 35000.00| 61893.00000 61893.00| MOBILIZATION | | | 0084 3050.15 138.700 m3 | 240.00000 33288.00| 205.41000 28490.37| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-30 | | | 0085 3051.10 8709.000 kg | 2.00000 17418.00| 1.44000 12540.96| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0086 6000.10 119.700 LS | 1530.00000 1530.00| 2430.00000 2430.00| ABUTMENT NO.1 EXCAVATION | | | 0087 6000.11 66.000 LS | 1530.00000 1530.00| 2430.00000 2430.00| ABUTMENT NO.2 EXCAVATION | | | 0088 6000.20 119.700 LS | 2220.00000 2220.00| 2167.00000 2167.00| PIER NO.1 EXCAVATION | | | 0089 6005.35 26.800 m | 130.00000 3484.00| 130.71000 3503.03| PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0090 6005.83 5.000 EACH| 1110.00000 5550.00| 1129.00000 5645.00| FIXED BEARING | | | 0091 6010.22 150.900 m3 | 388.80000 58669.92| 318.73000 48096.36| CLASS 47B-20 CONCRETE FOR BRIDGE | | | 0092 6010.26 244.900 m3 | 378.10000 92596.69| 300.33000 73550.82| CLASS 47BD-30 CONCRETE FOR BRIDGE | | | 0093 6071.11 131920.000 LS | 265000.00000 265000.00| 273816.00000 273816.00| STEEL SUPERSTRUCTURE AT STA. 802+57.238 | | | 0094 6080.00 380.000 kg | 5.00000 1900.00| 2.14000 813.20| STRUCTURAL STEEL FOR SUBSTRUCTURE | | | 0095 6107.00 256.000 m2 | 49.10000 12569.60| 44.25000 11328.00| CONCRETE SLOPE PROTECTION | | | 0096 6131.50 37277.000 kg | 1.30000 48460.10| 1.43000 53306.11| EPOXY COATED REINFORCING STEEL | | | 0097 6139.50 62.000 m2 | 26.30000 1630.60| 20.01000 1240.62| SUBSURFACE DRAINAGE MATTING | | | 0098 6210.12 264.600 m | 66.70000 17648.82| 59.66000 15786.04| HP 250 mm X 62 kg STEEL PILING | | | 0099 6210.14 439.200 m | 76.70000 33686.64| 66.79000 29334.17| HP 310 mm X 79 kg STEEL PILING | | | 0100 6510.55 20.000 LS | 21100.00000 21100.00| 17050.00000 17050.00| TEMPORARY BRIDGE SHORING | | | 1 NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0101 6510.60 30.000 LS | 16600.00000 16600.00| 6847.00000 6847.00| BRIDGE SHORING | | | 0102 6601.15 103.800 m | 42.00000 4359.60| 44.13000 4580.69| 38 mm CONDUIT IN BRIDGE | | | 0103 6951.12 3060.000 EACH| 2.70000 8262.00| 1.69000 5171.40| SHEAR CONNECTORS | | | 0104 7011.20 7.620 m | 80.00000 609.60| 85.00000 647.70| W-BEAM GUARDRAIL | | | 0105 7020.00 1.000 EACH| 1800.00000 1800.00| 1597.00000 1597.00| BRIDGE APPROACH SECTIONS | | | 0106 7024.25 1.000 EACH| 3000.00000 3000.00| 2900.00000 2900.00| GUARDRAIL END TREATMENT, TYPE 1 | | | 0107 8091.00 190.100 m3 | 50.80000 9657.08| 16.74000 3182.27| GRANULAR BACKFILL | | | SECTION TOTALS | $ 697,970.65| $ 668,746.74| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0006 GROUP 6A BRIDGE AT STA. 508+29.77 1-48.235 m & 1-44.16 m SPAN WELDED PLATE STEEL GIRDER BRIDGE | | | 0108 0020.00 1000.000 HOUR| 0.80000 800.00| 0.80000 800.00| TRAINING | | | 0109 0030.60 LUMP| 30000.00000 30000.00| 86396.00000 86396.00| MOBILIZATION | | | 0110 3050.15 138.500 m3 | 220.00000 30470.00| 202.02000 27979.77| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-30 | | | 0111 3051.10 8930.000 kg | 1.40000 12502.00| 1.43000 12769.90| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0112 6000.10 50.000 LS | 2420.00000 2420.00| 3888.00000 3888.00| ABUTMENT NO.1 EXCAVATION | | | 0113 6000.11 60.000 LS | 2090.00000 2090.00| 3888.00000 3888.00| ABUTMENT NO.2 EXCAVATION | | | 0114 6000.20 125.000 LS | 2310.00000 2310.00| 2906.00000 2906.00| PIER NO.1 EXCAVATION | | | 0115 6005.35 28.000 m | 130.00000 3640.00| 129.37000 3622.36| PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0116 6005.83 5.000 EACH| 1410.00000 7050.00| 1508.00000 7540.00| FIXED BEARING | | | 1 NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0117 6010.22 195.500 m3 | 363.50000 71064.25| 302.49000 59136.80| CLASS 47B-20 CONCRETE FOR BRIDGE | | | 0118 6010.26 302.400 m3 | 370.00000 111888.00| 301.86000 91282.46| CLASS 47BD-30 CONCRETE FOR BRIDGE | | | 0119 6071.11 226435.000 LS | 414000.00000 414000.00| 439806.00000 439806.00| STEEL SUPERSTRUCTURE AT STA. 508+29.77 | | | 0120 6080.00 410.000 kg | 4.70000 1927.00| 2.16000 885.60| STRUCTURAL STEEL FOR SUBSTRUCTURE | | | 0121 6107.00 250.000 m2 | 49.50000 12375.00| 44.27000 11067.50| CONCRETE SLOPE PROTECTION | | | 0122 6131.50 44975.000 kg | 1.30000 58467.50| 1.43000 64314.25| EPOXY COATED REINFORCING STEEL | | | 0123 6139.50 70.000 m2 | 25.80000 1806.00| 19.73000 1381.10| SUBSURFACE DRAINAGE MATTING | | | 0124 6210.12 411.500 m | 66.70000 27447.05| 56.55000 23270.33| HP 250 mm X 62 kg STEEL PILING | | | 0125 6210.14 784.800 m | 76.70000 60194.16| 63.60000 49913.28| HP 310 mm X 79 kg STEEL PILING | | | 0126 6601.15 115.500 m | 34.00000 3927.00| 35.08000 4051.74| 38 mm CONDUIT IN BRIDGE | | | 0127 6951.12 3030.000 EACH| 2.70000 8181.00| 1.70000 5151.00| SHEAR CONNECTORS | | | 0128 8091.00 305.000 m3 | 48.60000 14823.00| 16.79000 5120.95| GRANULAR BACKFILL | | | SECTION TOTALS | $ 877,381.96| $ 905,171.04| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0007 GROUP 6B BRIDGE AT STA. 602+49.196 1-43 m & 1-34 m SPAN WELDED PLATE STEEL GIRDER BRIDGE | | | 0129 0020.00 500.000 HOUR| 0.80000 400.00| 0.80000 400.00| TRAINING | | | 0130 0030.60 LUMP| 30000.00000 30000.00| 73339.00000 73339.00| MOBILIZATION | | | 0131 3050.15 136.500 m3 | 220.00000 30030.00| 202.46000 27635.79| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-30 | | | 0132 3051.10 8624.000 kg | 1.40000 12073.60| 1.43000 12332.32| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 1 NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0133 6000.10 50.000 LS | 2170.00000 2170.00| 3499.00000 3499.00| ABUTMENT NO.1 EXCAVATION | | | 0134 6000.11 50.000 LS | 2210.00000 2210.00| 3499.00000 3499.00| ABUTMENT NO.2 EXCAVATION | | | 0135 6000.20 110.000 LS | 2310.00000 2310.00| 9579.00000 9579.00| PIER NO.1 EXCAVATION | | | 0136 6005.35 25.900 m | 130.00000 3367.00| 131.33000 3401.45| PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0137 6005.83 5.000 EACH| 1540.00000 7700.00| 1645.00000 8225.00| FIXED BEARING | | | 0138 6010.22 184.800 m3 | 362.50000 66990.00| 310.98000 57469.10| CLASS 47B-20 CONCRETE FOR BRIDGE | | | 0139 6010.26 254.000 m3 | 377.40000 95859.60| 300.64000 76362.56| CLASS 47BD-30 CONCRETE FOR BRIDGE | | | 0140 6071.11 177620.000 LS | 350000.00000 350000.00| 370436.00000 370436.00| STEEL SUPERSTRUCTURE AT STA. 602+49.196 | | | 0141 6080.00 320.000 kg | 5.80000 1856.00| 2.17000 694.40| STRUCTURAL STEEL FOR SUBSTRUCTURE | | | 0142 6107.00 448.000 m2 | 42.90000 19219.20| 44.09000 19752.32| CONCRETE SLOPE PROTECTION | | | 0143 6131.50 39260.000 kg | 1.30000 51038.00| 1.43000 56141.80| EPOXY COATED REINFORCING STEEL | | | 0144 6139.50 86.000 m2 | 25.10000 2158.60| 19.34000 1663.24| SUBSURFACE DRAINAGE MATTING | | | 0145 6210.12 263.600 m | 66.70000 17582.12| 65.71000 17321.16| HP 250 mm X 62 kg STEEL PILING | | | 0146 6210.14 547.500 m | 76.70000 41993.25| 64.96000 35565.60| HP 310 mm X 79 kg STEEL PILING | | | 0147 6601.15 105.600 m | 34.00000 3590.40| 35.08000 3704.45| 38 mm CONDUIT IN BRIDGE | | | 0148 6951.12 2745.000 EACH| 2.70000 7411.50| 1.70000 4666.50| SHEAR CONNECTORS | | | 0149 8091.00 275.000 m3 | 49.00000 13475.00| 16.77000 4611.75| GRANULAR BACKFILL | | | SECTION TOTALS | $ 761,434.27| $ 790,299.44| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0008 GROUP 8B ELECTRICAL | | | 1 NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0150 A001.16 2.000 EACH| 600.00000 1200.00| 594.00000 1188.00| PULL BOX, TYPE PB-6 | | | 0151 A010.26 10.000 EACH| 800.00000 8000.00| 883.00000 8830.00| LUMINAIRE, TYPE HML-V-1KW | | | 0152 A018.81 1.000 EACH| 4700.00000 4700.00| 4752.00000 4752.00| FOUNDATION DESIGN | | | 0153 A018.82 11.500 m3 | 225.00000 2587.50| 231.96000 2667.54| CONCRETE FOR FOUNDATION | | | 0154 A018.83 550.000 kg | 4.00000 2200.00| 3.96000 2178.00| REINFORCING STEEL | | | 0155 A018.84 6.000 EACH| 250.00000 1500.00| 264.00000 1584.00| ANCHOR BOLTS | | | 0156 A072.14 10.000 m | 20.00000 200.00| 19.00000 190.00| 50 mm CONDUIT UNDER ROADWAY | | | 0157 A074.14 9.000 m | 70.00000 630.00| 68.00000 612.00| 50 mm CONDUIT, JACKED | | | 0158 A082.12 453.000 m | 8.00000 3624.00| 8.49000 3845.97| DIRECT BURIAL CABLE, NO. 2 USE | | | 0159 A750.10 1.000 EACH| 18000.00000 18000.00| 19801.00000 19801.00| MODIFY HIGH MAST TOWER TYPE P-45.7 | | | 0160 0030.81 LUMP| 3000.00000 3000.00| 1697.00000 1697.00| MOBILIZATION | | | SECTION TOTALS | $ 45,641.50| $ 47,345.51| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0009 GROUP 8C SIGNING | | | 0161 0030.82 LUMP| 2000.00000 2000.00| 1697.00000 1697.00| MOBILIZATION | | | 0162 7308.10 4.000 EACH| 1000.00000 4000.00| 622.00000 2488.00| REMOVE SIGN | | | 0163 7312.00 1.000 EACH| 12200.00000 12200.00| 13012.00000 13012.00| OVERHEAD SIGN SUPPORT, LOCATION 1 | | | 0164 7320.00 5.000 EACH| 250.00000 1250.00| 255.00000 1275.00| INSTALL SIGN | | | 0165 7320.05 3.000 EACH| 650.00000 1950.00| 679.00000 2037.00| INSTALL OVERHEAD SIGN | | | 0166 7340.00 580.000 kg | 5.50000 3190.00| 5.66000 3282.80| STRUCTURAL STEEL FOR SIGN SUPPORTS | | | 1 NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0167 7360.24 2.000 EACH| 600.00000 1200.00| 651.00000 1302.00| 600 mm SIGN SUPPORT FOOTING | | | 0168 7390.00 2.000 EACH| 800.00000 1600.00| 849.00000 1698.00| REMOVE SIGN AND POST | | | SECTION TOTALS | $ 27,390.00| $ 26,791.80| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0010 GROUP 10 GENERAL ITEMS | | | 0169 A800.70 412.000 DAY | 6.30000 2595.60| 6.56000 2702.72| MAINTENANCE OF LIGHTING UNITS | | | 0170 0001.08 24319.000 BDAY| 0.50000 12159.50| 0.50000 12159.50| BARRICADE, TYPE II | | | 0171 0001.10 2497.000 BDAY| 3.10000 7740.70| 3.39000 8464.83| BARRICADE, TYPE III | | | 0172 0001.30 1684.000 LDAY| 3.20000 5388.80| 3.39000 5708.76| TYPE B HIGH INTENSITY WARNING LIGHT | | | 0173 0001.75 1401.000 EACH| 3.30000 4623.30| 3.39000 4749.39| TEMPORARY SIGN DAY | | | 0174 0001.90 15466.000 EACH| 2.20000 34025.20| 2.26000 34953.16| SIGN DAY | | | 0175 0002.30 75000.000 m | 0.25000 18750.00| 0.25000 18750.00| PAVEMENT MARKING REMOVAL | | | 0176 0002.44 150000.000 m | 0.10000 15000.00| 0.06000 9000.00| TEMPORARY PAVEMENT MARKING, TYPE PAINT | | | 0177 0002.47 50000.000 m | 0.15000 7500.00| 0.12000 6000.00| TEMPORARY PAVEMENT MARKING SURFACE | | | PREPARATION | | | 0178 0002.48 2000.000 EACH| 2.20000 4400.00| 2.26000 4520.00| TEMPORARY RAISED PAVEMENT MARKER | | | 0179 0002.97 112.000 DAY | 200.00000 22400.00| 198.01000 22177.12| FLASHING ARROW PANEL | | | 0180 0003.10 120.000 DAY | 180.00000 21600.00| 65.50000 7860.00| FLAGGING | | | 0181 0003.51 2325.000 m | 10.90000 25342.50| 10.67000 24807.75| INSTALL CONCRETE PROTECTION BARRIER | | | 0182 0003.56 1500.000 m | 5.40000 8100.00| 8.06000 12090.00| RELOCATE CONCRETE PROTECTION BARRIER | | | 0183 0003.57 5.000 EACH| 1050.00000 5250.00| 1075.00000 5375.00| RELOCATE INERTIAL BARRIER SYSTEM | | | 1 NEBRASKA DEPARTMENT OF ROADS DATE : 07/12/01 TABULATION OF BIDS CALL ORDER : F01 CONTRACT ID : 2834 COUNTIES : DOUGLAS LETTING DATE : 07/12/01 1:30 PM DISTRICT : 2 PROJECT(S) : EACIM-680-9(790) EACIM-680-9(793) EACIM-680-9(803) ==================================================================================================================================== |(1) 0103 |(2) 0049 | |VRANA & SON CONSTRUCTION CO.|HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0184 0003.58 7.000 EACH| 1300.00000 9100.00| 1414.00000 9898.00| INERTIAL BARRIER SYSTEM | | | 0185 0003.64 5.000 EACH| 475.00000 2375.00| 537.00000 2685.00| REPLACEMENT MODULE | | | 0186 0010.04 1.000 EACH| 2060.00000 2060.00| 2376.00000 2376.00| FIELD OFFICE | | | 0187 0030.00 LUMP| 5000.00000 5000.00| 21586.00000 21586.00| MOBILIZATION | | | SECTION TOTALS | $ 213,410.60| $ 215,863.23| ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 5,026,696.99| $ 5,091,275.59| ====================================================================================================================================