Contract Letting December 06, 2001 |
NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 2 VENDOR RANKING CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) CONTRACT DESCRIPTION : N-50, TECUMSEH SOUTH. -------------------------------------------------------------------------------------------------------------------------- VENDOR NO. BID NOTES -------------------------------------------------------------------------------------------------------------------------- 0137 THE NUMBER OF GROUP 6 CONTRACTS WHICH WILL BE 0137 ACCEPTED IN THIS LETTING IS LIMITED TO ONE. 1742 THE NUMBER OF GROUP 6 CONTRACTS WHICH WILL BE 1742 ACCEPTED IN THIS LETTING IS LIMITED TO ONE. -------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID -------------------------------------------------------------------------------------------------------------------------- 1 0810 ELK HORN CONSTRUCTION CO. $ 1,275,346.76 100.0000% 2 0880 CHRISTENSEN BROS., INC. $ 1,290,017.45 101.1503% 3 1742 HERBST CONSTRUCTION, INC. $ 1,300,740.50 101.9911% 4 0137 JUDDS BROS. CONSTRUCTION CO. $ 1,363,033.15 106.8754% 5 0774 DIXON CONSTRUCTION CO. $ 1,389,418.33 108.9443% NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 3 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(1) 0810 |(2) 0880 |(3) 1742 |ELK HORN CONSTRUCTION CO. |CHRISTENSEN BROS., INC. |HERBST CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 GROUP 1 GRADING | | | 0001 L006.50 2.500 ACRE| 3000.00000 7500.00| 2000.00000 5000.00| 1973.00000 4932.50 TEMPORARY SEEDING | | | 0002 L020.00 4650.000 SY | 1.60000 7440.00| 1.65000 7672.50| 1.60000 7440.00 EROSION CONTROL | | | 0003 L020.01 195.000 SY | 6.00000 1170.00| 8.50000 1657.50| 8.00000 1560.00 EROSION CONTROL, TYPE A | | | 0004 L020.09 78.000 SY | 12.00000 936.00| 15.20000 1185.60| 15.00000 1170.00 EROSION CONTROL, TYPE AAA | | | 0005 L021.01 24.000 BALE| 28.00000 672.00| 21.00000 504.00| 20.00000 480.00 EROSION CHECKS, TYPE A | | | 0006 L022.11 1011.000 LF | 2.75000 2780.25| 3.10000 3134.10| 3.00000 3033.00 FABRIC SILT FENCE-LOW POROSITY | | | 0007 L022.75 413.000 LF | 5.00000 2065.00| 7.20000 2973.60| 7.00000 2891.00 TEMPORARY SILT CHECK | | | 0008 0030.10 LUMP| 6300.00000 6300.00| 8000.00000 8000.00| 17300.00000 17300.00 MOBILIZATION | | | 0009 1000.00 4.000 EACH| 350.00000 1400.00| 160.00000 640.00| 350.00000 1400.00 LARGE TREE REMOVAL | | | 0010 1009.00 LUMP| 10800.00000 10800.00| 6500.00000 6500.00| 9800.00000 9800.00 GENERAL CLEARING AND GRUBBING | | | 0011 1010.01 6839.000 CY | 2.22000 15182.58| 2.10000 14361.90| 2.98000 20380.22 EXCAVATION (ESTABLISHED QUANTITY) | | | 0012 1011.00 41.400 MGAL| 16.00000 662.40| 11.00000 455.40| 6.00000 248.40 WATER | | | 0013 1012.00 12.000 EACH| 60.00000 720.00| 125.00000 1500.00| 70.00000 840.00 RIGHT-OF-WAY MARKERS | | | 0014 1030.00 8287.000 CY | 6.46000 53534.02| 1.65000 13673.55| 4.98000 41269.26 EARTHWORK MEASURED IN EMBANKMENT | | | 0015 1043.50 100.000 SY | 2.00000 200.00| 2.60000 260.00| 2.50000 250.00 RIPRAP FILTER FABRIC | | | 0016 1101.00 613.000 SY | 2.09000 1281.17| 6.00000 3678.00| 5.90000 3616.70 REMOVE PAVEMENT | | | 0017 1102.00 5942.000 SY | 2.11000 12537.62| 3.00000 17826.00| 3.00000 17826.00 REMOVE ASPHALT SURFACE | | | 0018 1300.24 44.000 LF | 18.00000 792.00| 16.00000 704.00| 19.00000 836.00 24" DRIVEWAY CULVERT PIPE | | | 0019 1300.36 92.000 LF | 25.00000 2300.00| 28.00000 2576.00| 26.00000 2392.00 36" DRIVEWAY CULVERT PIPE | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 4 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(1) 0810 |(2) 0880 |(3) 1742 |ELK HORN CONSTRUCTION CO. |CHRISTENSEN BROS., INC. |HERBST CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0020 4050.01 510.000 CY | 8.50000 4335.00| 6.00000 3060.00| 5.80000 2958.00 EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,| | | AND HEADWALLS | | | 0021 4100.06 1.300 CY | 500.00000 650.00| 1000.00000 1300.00| 1000.00000 1300.00 CLASS 47B-3000 OR AX-3000 CONCRETE FOR | | | HEADWALL | | | 0022 4150.00 212.000 LB | 1.00000 212.00| 2.00000 424.00| 2.00000 424.00 REINFORCING STEEL FOR HEADWALL | | | 0023 4350.54 66.000 LF | 75.00000 4950.00| 60.00000 3960.00| 55.00000 3630.00 54" CORRUGATED METAL PIPE | | | 0024 4350.72 800.000 LF | 88.00000 70400.00| 92.00000 73600.00| 72.00000 57600.00 72" CORRUGATED METAL PIPE | | | 0025 6105.02 82.000 TON | 24.00000 1968.00| 28.00000 2296.00| 27.75000 2275.50 ROCK RIPRAP, TYPE B | | | 0026 7017.00 725.000 LF | 2.50000 1812.50| 2.50000 1812.50| 1.00000 725.00 REMOVE GUARDRAIL | | | 0027 9110.01 10.000 HOUR| 120.00000 1200.00| 65.00000 650.00| 90.00000 900.00 RENTAL OF LOADER, FULLY OPERATED | | | 0028 9110.03 10.000 HOUR| 52.00000 520.00| 45.00000 450.00| 60.00000 600.00 RENTAL OF DUMP TRUCK, FULLY OPERATED | | | 0029 9110.07 10.000 HOUR| 55.00000 550.00| 45.00000 450.00| 75.00000 750.00 RENTAL OF SKID LOADER, FULLY OPERATED | | | SECTION TOTALS | $ 214,870.54| $ 180,304.65| $ 208,827.58 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 GROUP 6 BRIDGE AT STA. 39+81.63 ALT AA1 ONE 100'-0" SPAN PRESTRESSED CONCRETE GIRDER BRIDGE | | | 0030 0030.60 LUMP| | | 30000.00000 30000.00 MOBILIZATION | | | 0031 1010.01 770.000 CY | | | 3.00000 2310.00 EXCAVATION (ESTABLISHED QUANTITY) | | | 0032 1043.50 492.000 SY | | | 2.25000 1107.00 RIPRAP FILTER FABRIC | | | 0033 3050.15 176.200 CY | | | 240.00000 42288.00 CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-4000 | | | 0034 3051.10 18750.000 LB | | | 1.10000 20625.00 EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0035 6000.10 95.000 LS | | | 4000.00000 4000.00 ABUTMENT NO.1 EXCAVATION | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 5 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(1) 0810 |(2) 0880 |(3) 1742 |ELK HORN CONSTRUCTION CO. |CHRISTENSEN BROS., INC. |HERBST CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0036 6000.11 95.000 LS | | | 4500.00000 4500.00 ABUTMENT NO.2 EXCAVATION | | | 0037 6005.35 90.100 LF | | | 100.00000 9010.00 PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0038 6005.78 5.000 EACH| | | 600.00000 3000.00 EXPANSION BEARING, TFE TYPE | | | 0039 6005.83 5.000 EACH| | | 300.00000 1500.00 FIXED BEARING | | | 0040 6010.22 88.900 CY | | | 350.00000 31115.00 CLASS 47B-3000 CONCRETE FOR BRIDGE | | | 0041 6010.26 165.800 CY | | | 400.00000 66320.00 CLASS 47BD-4000 CONCRETE FOR BRIDGE | | | 0042 6011.11 89.500 LS | | | 83000.00000 83000.00 PRECAST/PRESTRESSED CONCRETE | | | SUPERSTRUCTURE AT STA. 39+81.63 | | | 0043 6040.00 1.000 EACH| | | 15000.00000 15000.00 REMOVE STRUCTURE AT STA. 39+81.63 | | | 0044 6095.00 4.000 EACH| | | 600.00000 2400.00 STEEL DIAPHRAGM | | | 0045 6104.00 215.000 TON | | | 16.00000 3440.00 BROKEN CONCRETE RIPRAP | | | 0046 6105.01 23.000 TON | | | 28.00000 644.00 ROCK RIPRAP, TYPE A | | | 0047 6105.02 195.000 TON | | | 26.00000 5070.00 ROCK RIPRAP, TYPE B | | | 0048 6131.50 31125.000 LB | | | 0.65000 20231.25 EPOXY COATED REINFORCING STEEL | | | 0049 6139.50 74.000 SY | | | 27.00000 1998.00 SUBSURFACE DRAINAGE MATTING | | | 0050 6210.12 925.000 LF | | | 19.00000 17575.00 HP 10"X42# STEEL PILING | | | 0051 6210.14 875.000 LF | | | 19.00000 16625.00 HP 12"X53# STEEL PILING | | | 0052 6310.00 3047.500 SF | | | 12.00000 36570.00 STEEL SHEET PILING | | | 0053 8091.00 170.000 CY | | | 27.50000 4675.00 GRANULAR BACKFILL | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 6 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(1) 0810 |(2) 0880 |(3) 1742 |ELK HORN CONSTRUCTION CO. |CHRISTENSEN BROS., INC. |HERBST CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION TOTALS | $ | $ | $ 423,003.25 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 GROUP 6A BRIDGE AT STA. 39+81.63 ALT AA2 ONE 100'-0" SPAN ROLLED BEAM STEEL GIRDER BRIDGE | | | 0054 0030.60 LUMP| 39000.00000 39000.00| 40000.00000 40000.00| MOBILIZATION | | | 0055 1010.01 770.000 CY | 2.50000 1925.00| 5.00000 3850.00| EXCAVATION (ESTABLISHED QUANTITY) | | | 0056 1043.50 512.000 SY | 2.00000 1024.00| 2.00000 1024.00| RIPRAP FILTER FABRIC | | | 0057 3050.15 176.700 CY | 180.00000 31806.00| 180.00000 31806.00| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-4000 | | | 0058 3051.10 18750.000 LB | 0.55000 10312.50| 0.50000 9375.00| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0059 6000.10 95.000 LS | 4000.00000 4000.00| 7000.00000 7000.00| ABUTMENT NO.1 EXCAVATION | | | 0060 6000.11 95.000 LS | 4000.00000 4000.00| 7000.00000 7000.00| ABUTMENT NO.2 EXCAVATION | | | 0061 6005.35 90.100 LF | 40.00000 3604.00| 80.00000 7208.00| PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0062 6005.78 5.000 EACH| 600.00000 3000.00| 1200.00000 6000.00| EXPANSION BEARING, TFE TYPE | | | 0063 6005.83 5.000 EACH| 700.00000 3500.00| 1200.00000 6000.00| FIXED BEARING | | | 0064 6010.22 87.500 CY | 400.00000 35000.00| 320.00000 28000.00| CLASS 47B-3000 CONCRETE FOR BRIDGE | | | 0065 6010.26 150.900 CY | 400.00000 60360.00| 280.00000 42252.00| CLASS 47BD-4000 CONCRETE FOR BRIDGE | | | 0066 6040.00 1.000 EACH| 15000.00000 15000.00| 28000.00000 28000.00| REMOVE STRUCTURE AT STA. 39+81.63 | | | 0067 6071.12 170495.000 LS | 89000.00000 89000.00| 90000.00000 90000.00| STEEL SUPERSTRUCTURE AT STA. 39+81.63 | | | 0068 6104.00 230.000 TON | 17.00000 3910.00| 15.00000 3450.00| BROKEN CONCRETE RIPRAP | | | 0069 6105.01 20.000 TON | 25.00000 500.00| 30.00000 600.00| ROCK RIPRAP, TYPE A | | | 0070 6105.02 180.000 TON | 25.00000 4500.00| 30.00000 5400.00| ROCK RIPRAP, TYPE B | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 7 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(1) 0810 |(2) 0880 |(3) 1742 |ELK HORN CONSTRUCTION CO. |CHRISTENSEN BROS., INC. |HERBST CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0071 6131.50 31015.000 LB | 0.55000 17058.25| 0.60000 18609.00| EPOXY COATED REINFORCING STEEL | | | 0072 6139.50 75.000 SY | 40.00000 3000.00| 40.00000 3000.00| SUBSURFACE DRAINAGE MATTING | | | 0073 6210.12 925.000 LF | 17.00000 15725.00| 18.00000 16650.00| HP 10"X42# STEEL PILING | | | 0074 6210.14 875.000 LF | 19.00000 16625.00| 20.00000 17500.00| HP 12"X53# STEEL PILING | | | 0075 6310.00 3047.600 SF | 11.50000 35047.40| 14.00000 42666.40| STEEL SHEET PILING | | | 0076 6951.12 1140.000 EACH| 4.00000 4560.00| 2.00000 2280.00| SHEAR CONNECTORS | | | 0077 8091.00 160.000 CY | 20.00000 3200.00| 30.00000 4800.00| GRANULAR BACKFILL | | | SECTION TOTALS | $ 405,657.15| $ 422,470.40| $ ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0004 GROUP 6B BRIDGE AT STA. 72+52.30 ALT BB1 ONE 105'-0" SPAN PRESTRESSED CONCRETE GIRDER BRIDGE | | | 0078 0030.60 LUMP| | | 30000.00000 30000.00 MOBILIZATION | | | 0079 1010.01 1470.000 CY | | | 3.00000 4410.00 EXCAVATION (ESTABLISHED QUANTITY) | | | 0080 1043.50 570.000 SY | | | 2.25000 1282.50 RIPRAP FILTER FABRIC | | | 0081 3050.15 176.700 CY | | | 240.00000 42408.00 CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-4000 | | | 0082 3051.10 18690.000 LB | | | 1.10000 20559.00 EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0083 6000.10 125.000 LS | | | 4000.00000 4000.00 ABUTMENT NO.1 EXCAVATION | | | 0084 6000.11 125.000 LS | | | 4500.00000 4500.00 ABUTMENT NO.2 EXCAVATION | | | 0085 6005.35 86.000 LF | | | 100.00000 8600.00 PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0086 6005.78 5.000 EACH| | | 600.00000 3000.00 EXPANSION BEARING, TFE TYPE | | | 0087 6005.83 5.000 EACH| | | 300.00000 1500.00 FIXED BEARING | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 8 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(1) 0810 |(2) 0880 |(3) 1742 |ELK HORN CONSTRUCTION CO. |CHRISTENSEN BROS., INC. |HERBST CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0088 6010.22 87.500 CY | | | 350.00000 30625.00 CLASS 47B-3000 CONCRETE FOR BRIDGE | | | 0089 6010.26 169.400 CY | | | 400.00000 67760.00 CLASS 47BD-4000 CONCRETE FOR BRIDGE | | | 0090 6011.11 102.100 LS | | | 83000.00000 83000.00 PRECAST/PRESTRESSED CONCRETE | | | SUPERSTRUCTURE AT STA. 72+52.30 | | | 0091 6040.00 1.000 EACH| | | 15000.00000 15000.00 REMOVE STRUCTURE AT STA. 72+56.23 | | | 0092 6095.00 4.000 EACH| | | 600.00000 2400.00 STEEL DIAPHRAGM | | | 0093 6104.00 153.000 TON | | | 16.00000 2448.00 BROKEN CONCRETE RIPRAP | | | 0094 6105.01 25.000 TON | | | 28.00000 700.00 ROCK RIPRAP, TYPE A | | | 0095 6105.02 290.000 TON | | | 26.00000 7540.00 ROCK RIPRAP, TYPE B | | | 0096 6131.50 31870.000 LB | | | 0.65000 20715.50 EPOXY COATED REINFORCING STEEL | | | 0097 6139.50 72.000 SY | | | 27.00000 1944.00 SUBSURFACE DRAINAGE MATTING | | | 0098 6210.12 750.000 LF | | | 19.00000 14250.00 HP 10"X42# STEEL PILING | | | 0099 6210.14 1100.000 LF | | | 19.00000 20900.00 HP 12"X53# STEEL PILING | | | 0100 6310.00 2974.600 SF | | | 12.00000 35695.20 STEEL SHEET PILING | | | 0101 8091.00 230.000 CY | | | 27.50000 6325.00 GRANULAR BACKFILL | | | SECTION TOTALS | $ | $ | $ 429,562.20 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0005 GROUP 6C BRIDGE AT STA. 72+52.30 ALT BB2 ONE 105'-0" SPAN ROLLED BEAM STEEL GIRDER BRIDGE | | | 0102 0030.60 LUMP| 39000.00000 39000.00| 40000.00000 40000.00| MOBILIZATION | | | 0103 1010.01 1470.000 CY | 2.50000 3675.00| 5.00000 7350.00| EXCAVATION (ESTABLISHED QUANTITY) | | | 0104 1043.50 570.000 SY | 2.00000 1140.00| 2.00000 1140.00| RIPRAP FILTER FABRIC | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 9 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(1) 0810 |(2) 0880 |(3) 1742 |ELK HORN CONSTRUCTION CO. |CHRISTENSEN BROS., INC. |HERBST CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0105 3050.15 176.700 CY | 180.00000 31806.00| 180.00000 31806.00| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-4000 | | | 0106 3051.10 18690.000 LB | 0.55000 10279.50| 0.50000 9345.00| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0107 6000.10 100.000 LS | 4000.00000 4000.00| 7000.00000 7000.00| ABUTMENT NO.1 EXCAVATION | | | 0108 6000.11 100.000 LS | 4000.00000 4000.00| 7000.00000 7000.00| ABUTMENT NO.2 EXCAVATION | | | 0109 6005.35 86.000 LF | 40.00000 3440.00| 80.00000 6880.00| PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0110 6005.78 5.000 EACH| 600.00000 3000.00| 1000.00000 5000.00| EXPANSION BEARING, TFE TYPE | | | 0111 6005.83 5.000 EACH| 700.00000 3500.00| 1000.00000 5000.00| FIXED BEARING | | | 0112 6010.22 84.000 CY | 400.00000 33600.00| 320.00000 26880.00| CLASS 47B-3000 CONCRETE FOR BRIDGE | | | 0113 6010.26 156.500 CY | 400.00000 62600.00| 280.00000 43820.00| CLASS 47BD-4000 CONCRETE FOR BRIDGE | | | 0114 6040.00 1.000 EACH| 15000.00000 15000.00| 30000.00000 30000.00| REMOVE STRUCTURE AT STA. 72+56.23 | | | 0115 6071.12 198790.000 LS | 87000.00000 87000.00| 97000.00000 97000.00| STEEL SUPERSTRUCTURE AT STA. 72+52.30 | | | 0116 6104.00 153.000 TON | 17.00000 2601.00| 15.00000 2295.00| BROKEN CONCRETE RIPRAP | | | 0117 6105.01 25.000 TON | 25.00000 625.00| 30.00000 750.00| ROCK RIPRAP, TYPE A | | | 0118 6105.02 290.000 TON | 25.00000 7250.00| 30.00000 8700.00| ROCK RIPRAP, TYPE B | | | 0119 6131.50 31320.000 LB | 0.55000 17226.00| 0.60000 18792.00| EPOXY COATED REINFORCING STEEL | | | 0120 6139.50 62.000 SY | 40.00000 2480.00| 40.00000 2480.00| SUBSURFACE DRAINAGE MATTING | | | 0121 6210.12 750.000 LF | 17.00000 12750.00| 18.00000 13500.00| HP 10"X42# STEEL PILING | | | 0122 6210.14 990.000 LF | 19.00000 18810.00| 20.00000 19800.00| HP 12"X53# STEEL PILING | | | 0123 6310.00 2974.600 SF | 11.50000 34207.90| 14.00000 41644.40| STEEL SHEET PILING | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 10 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(1) 0810 |(2) 0880 |(3) 1742 |ELK HORN CONSTRUCTION CO. |CHRISTENSEN BROS., INC. |HERBST CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0124 6951.12 960.000 EACH| 4.00000 3840.00| 2.00000 1920.00| SHEAR CONNECTORS | | | 0125 8091.00 185.000 CY | 20.00000 3700.00| 30.00000 5550.00| GRANULAR BACKFILL | | | SECTION TOTALS | $ 405,530.40| $ 433,652.40| $ ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0006 GROUP 7 GUARDRAIL | | | 0126 0030.70 LUMP| 2000.00000 2000.00| 2000.00000 2000.00| 1400.00000 1400.00 MOBILIZATION | | | 0127 7011.20 287.500 LF | 15.00000 4312.50| 15.00000 4312.50| 13.00000 3737.50 W-BEAM GUARDRAIL | | | 0128 7020.00 8.000 EACH| 1600.00000 12800.00| 1650.00000 13200.00| 1100.00000 8800.00 BRIDGE APPROACH SECTIONS | | | 0129 7024.27 8.000 EACH| 1600.00000 12800.00| 1650.00000 13200.00| 1600.00000 12800.00 GUARDRAIL END TREATMENT, TYPE II | | | SECTION TOTALS | $ 31,912.50| $ 32,712.50| $ 26,737.50 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0007 GROUP 9 BITUMINOUS | | | 0130 L001.01 2.500 ACRE| 3000.00000 7500.00| 800.00000 2000.00| 789.00000 1972.50 SEEDING, TYPE A | | | 0131 L032.75 5.600 TON | 80.00000 448.00| 75.00000 420.00| 70.00000 392.00 MULCH | | | 0132 0030.90 LUMP| 2066.00000 2066.00| 7000.00000 7000.00| 10000.00000 10000.00 MOBILIZATION | | | 0133 9005.25 2630.000 TON | 34.00000 89420.00| 31.00000 81530.00| 30.00000 78900.00 ASPHALTIC CONCRETE, TYPE SP1(0.5) | | | 0134 9021.01 142.020 TON | 135.74000 19277.79| 185.00000 26273.70| 180.00000 25563.60 PERFORMANCE GRADED BINDER (64-22) | | | 0135 9053.00 600.000 GAL | 1.72000 1032.00| 1.30000 780.00| 1.25000 750.00 TACK COAT | | | 0136 9111.00 29.000 MGAL| 10.00000 290.00| 26.00000 754.00| 7.53000 218.37 WATER | | | 0137 9170.00 44.120 STA | 65.00000 2867.80| 105.00000 4632.60| 100.00000 4412.00 EARTH SHOULDER CONSTRUCTION | | | 0138 9173.20 5942.000 SY | 1.79000 10636.18| 1.70000 10101.40| 1.65000 9804.30 SUBGRADE PREPARATION | | | 0139 9188.50 1250.000 SY | 25.39000 31737.50| 21.00000 26250.00| 20.00000 25000.00 SURFACING UNDER GUARDRAIL | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 11 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(1) 0810 |(2) 0880 |(3) 1742 |ELK HORN CONSTRUCTION CO. |CHRISTENSEN BROS., INC. |HERBST CONSTRUCTION, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION TOTALS | $ 165,275.27| $ 159,741.70| $ 157,012.77 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0008 GROUP 10 GENERAL ITEMS | | | 0140 0001.08 4950.000 BDAY| 0.50000 2475.00| 0.50000 2475.00| 0.50000 2475.00 BARRICADE, TYPE II | | | 0141 0001.10 2816.000 BDAY| 1.25000 3520.00| 1.30000 3660.80| 1.50000 4224.00 BARRICADE, TYPE III | | | 0142 0001.30 418.000 LDAY| 0.95000 397.10| 1.00000 418.00| 1.00000 418.00 TYPE B HIGH INTENSITY WARNING LIGHT | | | 0143 0001.90 7964.000 EACH| 0.45000 3583.80| 0.50000 3982.00| 0.55000 4380.20 SIGN DAY | | | 0144 0002.30 2000.000 LF | 0.40000 800.00| 0.45000 900.00| 0.40000 800.00 PAVEMENT MARKING REMOVAL | | | 0145 0002.39 15500.000 LF | 0.95000 14725.00| 1.00000 15500.00| 1.00000 15500.00 TEMPORARY PAVEMENT MARKING, TYPE II | | | 0146 0002.47 1000.000 LF | 0.80000 800.00| 0.90000 900.00| 1.00000 1000.00 TEMPORARY PAVEMENT MARKING SURFACE | | | PREPARATION | | | 0147 0003.10 25.000 DAY | 180.00000 4500.00| 180.00000 4500.00| 200.00000 5000.00 FLAGGING | | | 0148 0010.04 1.000 EACH| 1500.00000 1500.00| 3000.00000 3000.00| 1000.00000 1000.00 FIELD OFFICE | | | 0149 0020.00 1000.000 HOUR| 0.80000 800.00| 0.80000 800.00| 0.80000 800.00 TRAINING | | | 0150 0030.10 LUMP| 3000.00000 3000.00| 2000.00000 2000.00| 4000.00000 4000.00 MOBILIZATION | | | 0151 1017.50 LUMP| 16000.00000 16000.00| 23000.00000 23000.00| 16000.00000 16000.00 CONSTRUCTION STAKING AND SURVEYING | | | SECTION TOTALS | $ 52,100.90| $ 61,135.80| $ 55,597.20 ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 1,275,346.76| $ 1,290,017.45| $ 1,300,740.50 ==================================================================================================================================== NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 12 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(4) 0137 |(5) 0774 | |JUDDS BROS. CONSTRUCTION CO.|DIXON CONSTRUCTION CO. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 GROUP 1 GRADING | | | 0001 L006.50 2.500 ACRE| 1973.00000 4932.50| 1973.00000 4932.50| TEMPORARY SEEDING | | | 0002 L020.00 4650.000 SY | 1.60000 7440.00| 1.60000 7440.00| EROSION CONTROL | | | 0003 L020.01 195.000 SY | 8.00000 1560.00| 8.00000 1560.00| EROSION CONTROL, TYPE A | | | 0004 L020.09 78.000 SY | 15.00000 1170.00| 15.00000 1170.00| EROSION CONTROL, TYPE AAA | | | 0005 L021.01 24.000 BALE| 20.00000 480.00| 20.00000 480.00| EROSION CHECKS, TYPE A | | | 0006 L022.11 1011.000 LF | 3.00000 3033.00| 3.00000 3033.00| FABRIC SILT FENCE-LOW POROSITY | | | 0007 L022.75 413.000 LF | 7.00000 2891.00| 7.00000 2891.00| TEMPORARY SILT CHECK | | | 0008 0030.10 LUMP| 15000.00000 15000.00| 10800.00000 10800.00| MOBILIZATION | | | 0009 1000.00 4.000 EACH| 350.00000 1400.00| 350.00000 1400.00| LARGE TREE REMOVAL | | | 0010 1009.00 LUMP| 10800.00000 10800.00| 9800.00000 9800.00| GENERAL CLEARING AND GRUBBING | | | 0011 1010.01 6839.000 CY | 2.25000 15387.75| 2.98000 20380.22| EXCAVATION (ESTABLISHED QUANTITY) | | | 0012 1011.00 41.400 MGAL| 16.00000 662.40| 6.00000 248.40| WATER | | | 0013 1012.00 12.000 EACH| 70.00000 840.00| 70.00000 840.00| RIGHT-OF-WAY MARKERS | | | 0014 1030.00 8287.000 CY | 6.50000 53865.50| 4.98000 41269.26| EARTHWORK MEASURED IN EMBANKMENT | | | 0015 1043.50 100.000 SY | 2.50000 250.00| 2.50000 250.00| RIPRAP FILTER FABRIC | | | 0016 1101.00 613.000 SY | 2.10000 1287.30| 5.90000 3616.70| REMOVE PAVEMENT | | | 0017 1102.00 5942.000 SY | 2.20000 13072.40| 5.00000 29710.00| REMOVE ASPHALT SURFACE | | | 0018 1300.24 44.000 LF | 20.00000 880.00| 19.00000 836.00| 24" DRIVEWAY CULVERT PIPE | | | 0019 1300.36 92.000 LF | 27.00000 2484.00| 26.00000 2392.00| 36" DRIVEWAY CULVERT PIPE | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 13 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(4) 0137 |(5) 0774 | |JUDDS BROS. CONSTRUCTION CO.|DIXON CONSTRUCTION CO. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0020 4050.01 510.000 CY | 5.00000 2550.00| 5.80000 2958.00| EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,| | | AND HEADWALLS | | | 0021 4100.06 1.300 CY | 1000.00000 1300.00| 1000.00000 1300.00| CLASS 47B-3000 OR AX-3000 CONCRETE FOR | | | HEADWALL | | | 0022 4150.00 212.000 LB | 2.00000 424.00| 2.00000 424.00| REINFORCING STEEL FOR HEADWALL | | | 0023 4350.54 66.000 LF | 57.00000 3762.00| 55.00000 3630.00| 54" CORRUGATED METAL PIPE | | | 0024 4350.72 800.000 LF | 75.00000 60000.00| 72.00000 57600.00| 72" CORRUGATED METAL PIPE | | | 0025 6105.02 82.000 TON | 30.00000 2460.00| 30.00000 2460.00| ROCK RIPRAP, TYPE B | | | 0026 7017.00 725.000 LF | 1.00000 725.00| 1.00000 725.00| REMOVE GUARDRAIL | | | 0027 9110.01 10.000 HOUR| 120.00000 1200.00| 90.00000 900.00| RENTAL OF LOADER, FULLY OPERATED | | | 0028 9110.03 10.000 HOUR| 52.00000 520.00| 60.00000 600.00| RENTAL OF DUMP TRUCK, FULLY OPERATED | | | 0029 9110.07 10.000 HOUR| 55.00000 550.00| 75.00000 750.00| RENTAL OF SKID LOADER, FULLY OPERATED | | | SECTION TOTALS | $ 210,926.85| $ 214,396.08| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 GROUP 6 BRIDGE AT STA. 39+81.63 ALT AA1 ONE 100'-0" SPAN PRESTRESSED CONCRETE GIRDER BRIDGE | | | 0030 0030.60 LUMP| | 50000.00000 50000.00| MOBILIZATION | | | 0031 1010.01 770.000 CY | | 3.00000 2310.00| EXCAVATION (ESTABLISHED QUANTITY) | | | 0032 1043.50 492.000 SY | | 2.25000 1107.00| RIPRAP FILTER FABRIC | | | 0033 3050.15 176.200 CY | | 240.00000 42288.00| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-4000 | | | 0034 3051.10 18750.000 LB | | 1.10000 20625.00| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0035 6000.10 95.000 LS | | 10000.00000 10000.00| ABUTMENT NO.1 EXCAVATION | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 14 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(4) 0137 |(5) 0774 | |JUDDS BROS. CONSTRUCTION CO.|DIXON CONSTRUCTION CO. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0036 6000.11 95.000 LS | | 10000.00000 10000.00| ABUTMENT NO.2 EXCAVATION | | | 0037 6005.35 90.100 LF | | 100.00000 9010.00| PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0038 6005.78 5.000 EACH| | 1000.00000 5000.00| EXPANSION BEARING, TFE TYPE | | | 0039 6005.83 5.000 EACH| | 700.00000 3500.00| FIXED BEARING | | | 0040 6010.22 88.900 CY | | 350.00000 31115.00| CLASS 47B-3000 CONCRETE FOR BRIDGE | | | 0041 6010.26 165.800 CY | | 400.00000 66320.00| CLASS 47BD-4000 CONCRETE FOR BRIDGE | | | 0042 6011.11 89.500 LS | | 83000.00000 83000.00| PRECAST/PRESTRESSED CONCRETE | | | SUPERSTRUCTURE AT STA. 39+81.63 | | | 0043 6040.00 1.000 EACH| | 25000.00000 25000.00| REMOVE STRUCTURE AT STA. 39+81.63 | | | 0044 6095.00 4.000 EACH| | 600.00000 2400.00| STEEL DIAPHRAGM | | | 0045 6104.00 215.000 TON | | 16.00000 3440.00| BROKEN CONCRETE RIPRAP | | | 0046 6105.01 23.000 TON | | 28.00000 644.00| ROCK RIPRAP, TYPE A | | | 0047 6105.02 195.000 TON | | 26.00000 5070.00| ROCK RIPRAP, TYPE B | | | 0048 6131.50 31125.000 LB | | 0.65000 20231.25| EPOXY COATED REINFORCING STEEL | | | 0049 6139.50 74.000 SY | | 27.00000 1998.00| SUBSURFACE DRAINAGE MATTING | | | 0050 6210.12 925.000 LF | | 19.00000 17575.00| HP 10"X42# STEEL PILING | | | 0051 6210.14 875.000 LF | | 19.00000 16625.00| HP 12"X53# STEEL PILING | | | 0052 6310.00 3047.500 SF | | 12.00000 36570.00| STEEL SHEET PILING | | | 0053 8091.00 170.000 CY | | 27.50000 4675.00| GRANULAR BACKFILL | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 15 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(4) 0137 |(5) 0774 | |JUDDS BROS. CONSTRUCTION CO.|DIXON CONSTRUCTION CO. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION TOTALS | $ | $ 468,503.25| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 GROUP 6A BRIDGE AT STA. 39+81.63 ALT AA2 ONE 100'-0" SPAN ROLLED BEAM STEEL GIRDER BRIDGE | | | 0054 0030.60 LUMP| 16500.00000 16500.00| | MOBILIZATION | | | 0055 1010.01 770.000 CY | 14.00000 10780.00| | EXCAVATION (ESTABLISHED QUANTITY) | | | 0056 1043.50 512.000 SY | 1.50000 768.00| | RIPRAP FILTER FABRIC | | | 0057 3050.15 176.700 CY | 240.00000 42408.00| | CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-4000 | | | 0058 3051.10 18750.000 LB | 1.80000 33750.00| | EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0059 6000.10 95.000 LS | 5000.00000 5000.00| | ABUTMENT NO.1 EXCAVATION | | | 0060 6000.11 95.000 LS | 5000.00000 5000.00| | ABUTMENT NO.2 EXCAVATION | | | 0061 6005.35 90.100 LF | 50.00000 4505.00| | PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0062 6005.78 5.000 EACH| 700.00000 3500.00| | EXPANSION BEARING, TFE TYPE | | | 0063 6005.83 5.000 EACH| 750.00000 3750.00| | FIXED BEARING | | | 0064 6010.22 87.500 CY | 545.00000 47687.50| | CLASS 47B-3000 CONCRETE FOR BRIDGE | | | 0065 6010.26 150.900 CY | 625.00000 94312.50| | CLASS 47BD-4000 CONCRETE FOR BRIDGE | | | 0066 6040.00 1.000 EACH| 6000.00000 6000.00| | REMOVE STRUCTURE AT STA. 39+81.63 | | | 0067 6071.12 170495.000 LS | 82000.00000 82000.00| | STEEL SUPERSTRUCTURE AT STA. 39+81.63 | | | 0068 6104.00 230.000 TON | 12.00000 2760.00| | BROKEN CONCRETE RIPRAP | | | 0069 6105.01 20.000 TON | 40.00000 800.00| | ROCK RIPRAP, TYPE A | | | 0070 6105.02 180.000 TON | 40.00000 7200.00| | ROCK RIPRAP, TYPE B | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 16 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(4) 0137 |(5) 0774 | |JUDDS BROS. CONSTRUCTION CO.|DIXON CONSTRUCTION CO. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0071 6131.50 31015.000 LB | 0.60000 18609.00| | EPOXY COATED REINFORCING STEEL | | | 0072 6139.50 75.000 SY | 20.00000 1500.00| | SUBSURFACE DRAINAGE MATTING | | | 0073 6210.12 925.000 LF | 15.00000 13875.00| | HP 10"X42# STEEL PILING | | | 0074 6210.14 875.000 LF | 17.00000 14875.00| | HP 12"X53# STEEL PILING | | | 0075 6310.00 3047.600 SF | 11.00000 33523.60| | STEEL SHEET PILING | | | 0076 6951.12 1140.000 EACH| 2.00000 2280.00| | SHEAR CONNECTORS | | | 0077 8091.00 160.000 CY | 32.00000 5120.00| | GRANULAR BACKFILL | | | SECTION TOTALS | $ 456,503.60| $ | ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0004 GROUP 6B BRIDGE AT STA. 72+52.30 ALT BB1 ONE 105'-0" SPAN PRESTRESSED CONCRETE GIRDER BRIDGE | | | 0078 0030.60 LUMP| | 50000.00000 50000.00| MOBILIZATION | | | 0079 1010.01 1470.000 CY | | 5.00000 7350.00| EXCAVATION (ESTABLISHED QUANTITY) | | | 0080 1043.50 570.000 SY | | 2.00000 1140.00| RIPRAP FILTER FABRIC | | | 0081 3050.15 176.700 CY | | 240.00000 42408.00| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-4000 | | | 0082 3051.10 18690.000 LB | | 0.60000 11214.00| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0083 6000.10 125.000 LS | | 10000.00000 10000.00| ABUTMENT NO.1 EXCAVATION | | | 0084 6000.11 125.000 LS | | 10000.00000 10000.00| ABUTMENT NO.2 EXCAVATION | | | 0085 6005.35 86.000 LF | | 100.00000 8600.00| PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0086 6005.78 5.000 EACH| | 1000.00000 5000.00| EXPANSION BEARING, TFE TYPE | | | 0087 6005.83 5.000 EACH| | 700.00000 3500.00| FIXED BEARING | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 17 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(4) 0137 |(5) 0774 | |JUDDS BROS. CONSTRUCTION CO.|DIXON CONSTRUCTION CO. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0088 6010.22 87.500 CY | | 350.00000 30625.00| CLASS 47B-3000 CONCRETE FOR BRIDGE | | | 0089 6010.26 169.400 CY | | 400.00000 67760.00| CLASS 47BD-4000 CONCRETE FOR BRIDGE | | | 0090 6011.11 102.100 LS | | 83000.00000 83000.00| PRECAST/PRESTRESSED CONCRETE | | | SUPERSTRUCTURE AT STA. 72+52.30 | | | 0091 6040.00 1.000 EACH| | 25000.00000 25000.00| REMOVE STRUCTURE AT STA. 72+56.23 | | | 0092 6095.00 4.000 EACH| | 700.00000 2800.00| STEEL DIAPHRAGM | | | 0093 6104.00 153.000 TON | | 15.00000 2295.00| BROKEN CONCRETE RIPRAP | | | 0094 6105.01 25.000 TON | | 26.50000 662.50| ROCK RIPRAP, TYPE A | | | 0095 6105.02 290.000 TON | | 25.75000 7467.50| ROCK RIPRAP, TYPE B | | | 0096 6131.50 31870.000 LB | | 0.60000 19122.00| EPOXY COATED REINFORCING STEEL | | | 0097 6139.50 72.000 SY | | 30.00000 2160.00| SUBSURFACE DRAINAGE MATTING | | | 0098 6210.12 750.000 LF | | 15.00000 11250.00| HP 10"X42# STEEL PILING | | | 0099 6210.14 1100.000 LF | | 17.00000 18700.00| HP 12"X53# STEEL PILING | | | 0100 6310.00 2974.600 SF | | 12.00000 35695.20| STEEL SHEET PILING | | | 0101 8091.00 230.000 CY | | 30.00000 6900.00| GRANULAR BACKFILL | | | SECTION TOTALS | $ | $ 462,649.20| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0005 GROUP 6C BRIDGE AT STA. 72+52.30 ALT BB2 ONE 105'-0" SPAN ROLLED BEAM STEEL GIRDER BRIDGE | | | 0102 0030.60 LUMP| 14750.00000 14750.00| | MOBILIZATION | | | 0103 1010.01 1470.000 CY | 10.00000 14700.00| | EXCAVATION (ESTABLISHED QUANTITY) | | | 0104 1043.50 570.000 SY | 1.50000 855.00| | RIPRAP FILTER FABRIC | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 18 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(4) 0137 |(5) 0774 | |JUDDS BROS. CONSTRUCTION CO.|DIXON CONSTRUCTION CO. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0105 3050.15 176.700 CY | 240.00000 42408.00| | CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-4000 | | | 0106 3051.10 18690.000 LB | 1.80000 33642.00| | EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0107 6000.10 100.000 LS | 5000.00000 5000.00| | ABUTMENT NO.1 EXCAVATION | | | 0108 6000.11 100.000 LS | 5000.00000 5000.00| | ABUTMENT NO.2 EXCAVATION | | | 0109 6005.35 86.000 LF | 50.00000 4300.00| | PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0110 6005.78 5.000 EACH| 700.00000 3500.00| | EXPANSION BEARING, TFE TYPE | | | 0111 6005.83 5.000 EACH| 725.00000 3625.00| | FIXED BEARING | | | 0112 6010.22 84.000 CY | 520.00000 43680.00| | CLASS 47B-3000 CONCRETE FOR BRIDGE | | | 0113 6010.26 156.500 CY | 575.00000 89987.50| | CLASS 47BD-4000 CONCRETE FOR BRIDGE | | | 0114 6040.00 1.000 EACH| 6000.00000 6000.00| | REMOVE STRUCTURE AT STA. 72+56.23 | | | 0115 6071.12 198790.000 LS | 92000.00000 92000.00| | STEEL SUPERSTRUCTURE AT STA. 72+52.30 | | | 0116 6104.00 153.000 TON | 10.00000 1530.00| | BROKEN CONCRETE RIPRAP | | | 0117 6105.01 25.000 TON | 32.00000 800.00| | ROCK RIPRAP, TYPE A | | | 0118 6105.02 290.000 TON | 31.50000 9135.00| | ROCK RIPRAP, TYPE B | | | 0119 6131.50 31320.000 LB | 0.60000 18792.00| | EPOXY COATED REINFORCING STEEL | | | 0120 6139.50 62.000 SY | 22.00000 1364.00| | SUBSURFACE DRAINAGE MATTING | | | 0121 6210.12 750.000 LF | 16.00000 12000.00| | HP 10"X42# STEEL PILING | | | 0122 6210.14 990.000 LF | 17.00000 16830.00| | HP 12"X53# STEEL PILING | | | 0123 6310.00 2974.600 SF | 11.00000 32720.60| | STEEL SHEET PILING | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 19 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(4) 0137 |(5) 0774 | |JUDDS BROS. CONSTRUCTION CO.|DIXON CONSTRUCTION CO. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0124 6951.12 960.000 EACH| 2.00000 1920.00| | SHEAR CONNECTORS | | | 0125 8091.00 185.000 CY | 21.00000 3885.00| | GRANULAR BACKFILL | | | SECTION TOTALS | $ 458,424.10| $ | ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0006 GROUP 7 GUARDRAIL | | | 0126 0030.70 LUMP| 1950.00000 1950.00| 2000.00000 2000.00| MOBILIZATION | | | 0127 7011.20 287.500 LF | 13.00000 3737.50| 13.00000 3737.50| W-BEAM GUARDRAIL | | | 0128 7020.00 8.000 EACH| 1100.00000 8800.00| 1100.00000 8800.00| BRIDGE APPROACH SECTIONS | | | 0129 7024.27 8.000 EACH| 1600.00000 12800.00| 1600.00000 12800.00| GUARDRAIL END TREATMENT, TYPE II | | | SECTION TOTALS | $ 27,287.50| $ 27,337.50| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0007 GROUP 9 BITUMINOUS | | | 0130 L001.01 2.500 ACRE| 789.00000 1972.50| 789.00000 1972.50| SEEDING, TYPE A | | | 0131 L032.75 5.600 TON | 70.00000 392.00| 70.00000 392.00| MULCH | | | 0132 0030.90 LUMP| 12000.00000 12000.00| 10000.00000 10000.00| MOBILIZATION | | | 0133 9005.25 2630.000 TON | 30.00000 78900.00| 30.00000 78900.00| ASPHALTIC CONCRETE, TYPE SP1(0.5) | | | 0134 9021.01 142.020 TON | 180.00000 25563.60| 180.00000 25563.60| PERFORMANCE GRADED BINDER (64-22) | | | 0135 9053.00 600.000 GAL | 1.25000 750.00| 1.25000 750.00| TACK COAT | | | 0136 9111.00 29.000 MGAL| 10.00000 290.00| 25.00000 725.00| WATER | | | 0137 9170.00 44.120 STA | 65.00000 2867.80| 200.00000 8824.00| EARTH SHOULDER CONSTRUCTION | | | 0138 9173.20 5942.000 SY | 1.65000 9804.30| 1.65000 9804.30| SUBGRADE PREPARATION | | | 0139 9188.50 1250.000 SY | 20.00000 25000.00| 20.00000 25000.00| SURFACING UNDER GUARDRAIL | | | NEBRASKA DEPARTMENT OF ROADS DATE : 12/06/01 PAGE : 20 TABULATION OF BIDS CALL ORDER : F06 CONTRACT ID : 1208 COUNTIES : JOHNSON LETTING DATE : 12/06/01 1:30 PM DISTRICT : 1 PROJECT(S) : EACSTPD-50-1(111) ==================================================================================================================================== |(4) 0137 |(5) 0774 | |JUDDS BROS. CONSTRUCTION CO.|DIXON CONSTRUCTION CO. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION TOTALS | $ 157,540.20| $ 161,931.40| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0008 GROUP 10 GENERAL ITEMS | | | 0140 0001.08 4950.000 BDAY| 0.50000 2475.00| 0.50000 2475.00| BARRICADE, TYPE II | | | 0141 0001.10 2816.000 BDAY| 1.25000 3520.00| 1.25000 3520.00| BARRICADE, TYPE III | | | 0142 0001.30 418.000 LDAY| 0.95000 397.10| 0.95000 397.10| TYPE B HIGH INTENSITY WARNING LIGHT | | | 0143 0001.90 7964.000 EACH| 0.45000 3583.80| 0.45000 3583.80| SIGN DAY | | | 0144 0002.30 2000.000 LF | 0.40000 800.00| 0.40000 800.00| PAVEMENT MARKING REMOVAL | | | 0145 0002.39 15500.000 LF | 0.95000 14725.00| 0.95000 14725.00| TEMPORARY PAVEMENT MARKING, TYPE II | | | 0146 0002.47 1000.000 LF | 0.80000 800.00| 0.80000 800.00| TEMPORARY PAVEMENT MARKING SURFACE | | | PREPARATION | | | 0147 0003.10 25.000 DAY | 150.00000 3750.00| 200.00000 5000.00| FLAGGING | | | 0148 0010.04 1.000 EACH| 2500.00000 2500.00| 1500.00000 1500.00| FIELD OFFICE | | | 0149 0020.00 1000.000 HOUR| 0.80000 800.00| 0.80000 800.00| TRAINING | | | 0150 0030.10 LUMP| 4000.00000 4000.00| 1000.00000 1000.00| MOBILIZATION | | | 0151 1017.50 LUMP| 15000.00000 15000.00| 20000.00000 20000.00| CONSTRUCTION STAKING AND SURVEYING | | | SECTION TOTALS | $ 52,350.90| $ 54,600.90| ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 1,363,033.15| $ 1,389,418.33| ====================================================================================================================================