Bid Tabs

Return to Bid Tabs Index



Contract Letting December 06, 2001


                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 12/06/01
                                                                                                             PAGE : 2
                                                          VENDOR RANKING

     CALL ORDER   : F11                     CONTRACT ID : 2597A                         COUNTIES : SARPY
      LETTING DATE : 12/06/01                 DISTRICT    : 2
                                                                                             PROJECT(S) : EACBR-6-7(173)
     CONTRACT DESCRIPTION :
     ON US-6, PLATTE RIVER TO N-31 BRIDGE

  --------------------------------------------------------------------------------------------------------------------------
      VENDOR NO.           BID NOTES
  --------------------------------------------------------------------------------------------------------------------------

  --------------------------------------------------------------------------------------------------------------------------
                                                                                                   TOTAL         % OVER
  RANK     VENDOR NO./NAME                                                                          BID           LOW BID
  --------------------------------------------------------------------------------------------------------------------------
   1   0049           HAWKINS CONSTRUCTION COMPANY                                           $  1,070,464.28     100.0000%
   2   2817           MCC, L.L.C.                                                            $  1,099,737.06     102.7345%
   3   2182           WBE COMPANY, INC.                                                      $  1,139,850.41     106.4818%
   4   0774           DIXON CONSTRUCTION CO.                                                 $  1,164,511.63     108.7856%
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 12/06/01
                                                                                                             PAGE : 3
                                                        TABULATION OF BIDS

     CALL ORDER   : F11                    CONTRACT ID : 2597A                        COUNTIES : SARPY
      LETTING DATE : 12/06/01  1:30 PM        DISTRICT    : 2
                                                                                       PROJECT(S) : EACBR-6-7(173)



====================================================================================================================================
                                          |(1) 0049                    |(2) 2817                    |(3) 2182
                                          |HAWKINS CONSTRUCTION COMPANY|MCC, L.L.C.                 |WBE COMPANY, INC.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001   GROUP 1 GRADING
                                          |                            |                            |
0001 L006.50                   4.200  ACRE|     345.00000       1449.00|     511.88000       2149.90|     487.50000        2047.50
  TEMPORARY SEEDING                       |                            |                            |
0002 L020.00                2745.000  SY  |       1.55000       4254.75|       1.89000       5188.05|       1.80000        4941.00
  EROSION CONTROL                         |                            |                            |
0003 L020.12                1550.000  SY  |       7.77000      12043.50|       4.20000       6510.00|       4.00000        6200.00
  EROSION CONTROL, TYPE B-2               |                            |                            |
0004 L021.06                  24.000  BALE|      17.27000        414.48|      21.00000        504.00|      20.00000         480.00
  EROSION CHECKS, TYPE HV                 |                            |                            |
0005 L022.11                 800.000  LF  |       2.88000       2304.00|       3.15000       2520.00|       3.00000        2400.00
  FABRIC SILT FENCE-LOW POROSITY          |                            |                            |
0006 0030.10                          LUMP|   10360.00000      10360.00|   20000.00000      20000.00|    6100.00000        6100.00
  MOBILIZATION                            |                            |                            |
0007 1009.00                          LUMP|   13589.00000      13589.00|   20000.00000      20000.00|    6200.00000        6200.00
  GENERAL CLEARING AND GRUBBING           |                            |                            |
0008 1010.01                9342.000  CY  |       3.55000      33164.10|       3.23000      30174.66|       2.61000       24382.62
  EXCAVATION (ESTABLISHED QUANTITY)       |                            |                            |
0009 1011.00                 240.000  MGAL|       4.61000       1106.40|       4.20000       1008.00|       1.00000         240.00
  WATER                                   |                            |                            |
0010 1012.00                   4.000  EACH|      92.00000        368.00|      84.00000        336.00|      65.00000         260.00
  RIGHT-OF-WAY MARKERS                    |                            |                            |
0011 1030.00               17310.000  CY  |       4.55000      78760.50|       4.15000      71836.50|       8.40000      145404.00
  EARTHWORK MEASURED IN EMBANKMENT        |                            |                            |
0012 1101.00                2658.000  SY  |       4.38000      11642.04|       3.99000      10605.42|       4.90000       13024.20
  REMOVE PAVEMENT                         |                            |                            |
0013 4050.01                  67.000  CY  |       5.29000        354.43|      10.50000        703.50|      12.00000         804.00
  EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,|                            |                            |
   AND HEADWALLS                          |                            |                            |
0014 4200.36                   1.000  EACH|    1531.00000       1531.00|    1680.00000       1680.00|    2120.00000        2120.00
  36" AUTOMATIC FLOOD CONTROL GATE        |                            |                            |
0015 4350.36                  56.000  LF  |      28.00000       1568.00|      31.50000       1764.00|      47.14000        2639.84
  36" CORRUGATED METAL PIPE               |                            |                            |
0016 4350.60                 410.000  LF  |      63.32000      25961.20|      61.95000      25399.50|     117.00000       47970.00
  60" CORRUGATED METAL PIPE               |                            |                            |
0017 4360.36                   1.000  EACH|     339.00000        339.00|     420.00000        420.00|     278.00000         278.00
  36" METAL FLARED-END SECTION            |                            |                            |
0018 7017.00                 550.000  LF  |       1.15000        632.50|       1.05000        577.50|       1.50000         825.00
  REMOVE GUARDRAIL                        |                            |                            |
0019 9110.01                  10.000  HOUR|      86.00000        860.00|      99.75000        997.50|      70.00000         700.00
  RENTAL OF LOADER, FULLY OPERATED        |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 12/06/01
                                                                                                             PAGE : 4
                                                        TABULATION OF BIDS

     CALL ORDER   : F11                    CONTRACT ID : 2597A                        COUNTIES : SARPY
      LETTING DATE : 12/06/01  1:30 PM        DISTRICT    : 2
                                                                                       PROJECT(S) : EACBR-6-7(173)



====================================================================================================================================
                                          |(1) 0049                    |(2) 2817                    |(3) 2182
                                          |HAWKINS CONSTRUCTION COMPANY|MCC, L.L.C.                 |WBE COMPANY, INC.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0020 9110.03                  10.000  HOUR|      86.00000        860.00|      63.00000        630.00|      65.00000         650.00
  RENTAL OF DUMP TRUCK, FULLY OPERATED    |                            |                            |
0021 9110.07                  10.000  HOUR|      86.00000        860.00|      78.75000        787.50|      40.00000         400.00
  RENTAL OF SKID LOADER, FULLY OPERATED   |                            |                            |
     SECTION TOTALS                       |             $    202,421.90|             $    203,792.03|                $    268,066.16
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0002   GROUP 3 CONCRETE PAVEMENT
                                          |                            |                            |
0022 L001.02                   0.580  ACRE|     754.29000        437.49|     745.10000        432.16|     709.62000         411.58
  SEEDING, TYPE B                         |                            |                            |
0023 L001.03                   1.200  ACRE|     461.00000        553.20|     786.45000        943.74|     749.00000         898.80
  SEEDING, TYPE C                         |                            |                            |
0024 L032.75                   4.000  TON |      86.00000        344.00|      73.50000        294.00|      70.00000         280.00
  MULCH                                   |                            |                            |
0025 0030.30                          LUMP|   26526.00000      26526.00|   45000.00000      45000.00|   17700.00000       17700.00
  MOBILIZATION                            |                            |                            |
0026 3075.42                1563.000  SY  |      25.10000      39231.30|      30.05000      46968.15|      29.00000       45327.00
  9" CONCRETE PAVEMENT, CLASS 47B-3500    |                            |                            |
0027 3075.46                2343.000  SY  |      27.25000      63846.75|      33.15000      77670.45|      32.00000       74976.00
  9" DOWELED CONCRETE PAVEMENT, CLASS     |                            |                            |
  47B-3500                                |                            |                            |
0028 3089.25                7976.000  SY  |      28.05000     223726.80|      30.56000     243746.56|      30.00000      239280.00
  TEMPORARY SURFACING 10"                 |                            |                            |
0029 8029.04                3906.000  SY  |       5.37000      20975.22|       6.01000      23475.06|       5.80000       22654.80
  AGGREGATE FOUNDATION COURSE 4"          |                            |                            |
0030 9111.00                 212.000  MGAL|       2.64000        559.68|       0.01000          2.12|       1.00000         212.00
  WATER                                   |                            |                            |
0031 9170.00                  17.640  STA |      86.37000       1523.57|      75.00000       1323.00|     150.00000        2646.00
  EARTH SHOULDER CONSTRUCTION             |                            |                            |
0032 9173.20                3906.000  SY  |       1.23000       4804.38|       2.76000      10780.56|       2.67000       10429.02
  SUBGRADE PREPARATION                    |                            |                            |
0033 9188.50                  87.000  SY  |      36.38000       3165.06|      31.55000       2744.85|      45.50000        3958.50
  SURFACING UNDER GUARDRAIL               |                            |                            |
     SECTION TOTALS                       |             $    385,693.45|             $    453,380.65|                $    418,773.70
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0003   GROUP 6 BRIDGE AT STA. 18+21.67
               1-44' & 2-33' SPANS, CONCRETE SLAB BRIDGE - CONTINUOUS TYPE
                                          |                            |                            |
0034 0030.60                          LUMP|   44830.00000      44830.00|   22000.00000      22000.00|   20000.00000       20000.00
  MOBILIZATION                            |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 12/06/01
                                                                                                             PAGE : 5
                                                        TABULATION OF BIDS

     CALL ORDER   : F11                    CONTRACT ID : 2597A                        COUNTIES : SARPY
      LETTING DATE : 12/06/01  1:30 PM        DISTRICT    : 2
                                                                                       PROJECT(S) : EACBR-6-7(173)



====================================================================================================================================
                                          |(1) 0049                    |(2) 2817                    |(3) 2182
                                          |HAWKINS CONSTRUCTION COMPANY|MCC, L.L.C.                 |WBE COMPANY, INC.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0035 1010.01                 120.000  CY  |       3.96000        475.20|       5.00000        600.00|       8.00000         960.00
  EXCAVATION (ESTABLISHED QUANTITY)       |                            |                            |
0036 1043.50                  64.000  SY  |       2.94000        188.16|       3.00000        192.00|       2.00000         128.00
  RIPRAP FILTER FABRIC                    |                            |                            |
0037 3050.15                 203.700  CY  |     149.86000      30526.48|     180.00000      36666.00|     190.00000       38703.00
  CONCRETE FOR PAVEMENT APPROACHES CLASS  |                            |                            |
  47BD-4000                               |                            |                            |
0038 3051.10               20480.000  LB  |       0.63000      12902.40|       0.60000      12288.00|       0.50000       10240.00
  EPOXY COATED REINFORCING STEEL FOR      |                            |                            |
  PAVEMENT APPROACHES                     |                            |                            |
0039 6000.10                  75.000  LS  |     627.00000        627.00|    1700.00000       1700.00|    2000.00000        2000.00
  ABUTMENT NO.1 EXCAVATION                |                            |                            |
0040 6000.11                  75.000  LS  |     627.00000        627.00|    1700.00000       1700.00|    2000.00000        2000.00
  ABUTMENT NO.2 EXCAVATION                |                            |                            |
0041 6001.50                  55.000  LS  |    4287.00000       4287.00|   10000.00000      10000.00|    4900.00000        4900.00
  BENT NO.1 EXCAVATION                    |                            |                            |
0042 6001.51                  55.000  LS  |    4486.00000       4486.00|   10000.00000      10000.00|    4900.00000        4900.00
  BENT NO.2 EXCAVATION                    |                            |                            |
0043 6010.22                 236.300  CY  |     219.08000      51768.60|     275.00000      64982.50|     287.00000       67818.10
  CLASS 47B-3000 CONCRETE FOR BRIDGE      |                            |                            |
0044 6010.26                 289.800  CY  |     355.85000     103125.33|     320.00000      92736.00|     299.00000       86650.20
  CLASS 47BD-4000 CONCRETE FOR BRIDGE     |                            |                            |
0045 6040.00                   1.000  EACH|   53308.00000      53308.00|   30000.00000      30000.00|   20000.00000       20000.00
  REMOVE STRUCTURE AT STA. 18+26.48       |                            |                            |
0046 6080.00                 800.000  LB  |       2.92000       2336.00|       1.20000        960.00|       4.06000        3248.00
  STRUCTURAL STEEL FOR SUBSTRUCTURE       |                            |                            |
0047 6104.00                 270.000  TON |       5.83000       1574.10|       6.00000       1620.00|       9.60000        2592.00
  BROKEN CONCRETE RIPRAP                  |                            |                            |
0048 6105.02                 100.800  TON |      22.86000       2304.29|      26.00000       2620.80|      20.00000        2016.00
  ROCK RIPRAP, TYPE B                     |                            |                            |
0049 6131.50               84915.000  LB  |       0.64000      54345.60|       0.60000      50949.00|       0.53000       45004.95
  EPOXY COATED REINFORCING STEEL          |                            |                            |
0050 6139.50                  49.800  SY  |      27.90000       1389.42|      29.00000       1444.20|      25.00000        1245.00
  SUBSURFACE DRAINAGE MATTING             |                            |                            |
0051 6210.12                 980.000  LF  |      13.02000      12759.60|       8.15000       7987.00|      19.60000       19208.00
  HP 10"X42# STEEL PILING                 |                            |                            |
0052 6210.14                2620.000  LF  |      15.65000      41003.00|      10.15000      26593.00|      21.80000       57116.00
  HP 12"X53# STEEL PILING                 |                            |                            |
0053 6310.00                2561.900  SF  |       9.55000      24466.15|      11.20000      28693.28|      12.00000       30742.80
  STEEL SHEET PILING                      |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 12/06/01
                                                                                                             PAGE : 6
                                                        TABULATION OF BIDS

     CALL ORDER   : F11                    CONTRACT ID : 2597A                        COUNTIES : SARPY
      LETTING DATE : 12/06/01  1:30 PM        DISTRICT    : 2
                                                                                       PROJECT(S) : EACBR-6-7(173)



====================================================================================================================================
                                          |(1) 0049                    |(2) 2817                    |(3) 2182
                                          |HAWKINS CONSTRUCTION COMPANY|MCC, L.L.C.                 |WBE COMPANY, INC.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0054 8091.00                  88.500  CY  |      11.17000        988.55|      20.00000       1770.00|      19.00000        1681.50
  GRANULAR BACKFILL                       |                            |                            |
     SECTION TOTALS                       |             $    448,317.88|             $    405,501.78|                $    421,153.55
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0004   GROUP 7 GUARDRAIL
                                          |                            |                            |
0055 0030.70                          LUMP|     288.00000        288.00|     250.00000        250.00|      90.00000          90.00
  MOBILIZATION                            |                            |                            |
0056 7011.20                 225.000  LF  |      16.12000       3627.00|      14.00000       3150.00|      15.00000        3375.00
  W-BEAM GUARDRAIL                        |                            |                            |
0057 7020.00                   4.000  EACH|    1382.00000       5528.00|    1200.00000       4800.00|    1200.00000        4800.00
  BRIDGE APPROACH SECTIONS                |                            |                            |
0058 7024.25                   1.000  EACH|    2303.00000       2303.00|    2000.00000       2000.00|    2250.00000        2250.00
  GUARDRAIL END TREATMENT, TYPE 1         |                            |                            |
0059 7024.27                   3.000  EACH|    1843.00000       5529.00|    1600.00000       4800.00|    1650.00000        4950.00
  GUARDRAIL END TREATMENT, TYPE II        |                            |                            |
     SECTION TOTALS                       |             $     17,275.00|             $     15,000.00|                $     15,465.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0005   GROUP 10 GENERAL ITEMS
                                          |                            |                            |
0060 0001.08                1960.000  BDAY|       0.50000        980.00|       0.50000        980.00|       0.50000         980.00
  BARRICADE, TYPE II                      |                            |                            |
0061 0001.10                1244.000  BDAY|       2.25000       2799.00|       1.31000       1629.64|       1.25000        1555.00
  BARRICADE, TYPE III                     |                            |                            |
0062 0001.30                 404.000  LDAY|       2.25000        909.00|       1.31000        529.24|       1.25000         505.00
  TYPE B HIGH INTENSITY WARNING LIGHT     |                            |                            |
0063 0001.90                5068.000  EACH|       0.35000       1773.80|       0.79000       4003.72|       0.75000        3801.00
  SIGN DAY                                |                            |                            |
0064 0002.30                1000.000  LF  |       0.46000        460.00|       0.53000        530.00|       0.50000         500.00
  PAVEMENT MARKING REMOVAL                |                            |                            |
0065 0002.44               12500.000  LF  |       0.09000       1125.00|       0.11000       1375.00|       0.10000        1250.00
  TEMPORARY PAVEMENT MARKING, TYPE PAINT  |                            |                            |
0066 0002.47                 800.000  LF  |       0.58000        464.00|       1.05000        840.00|       1.00000         800.00
  TEMPORARY PAVEMENT MARKING SURFACE      |                            |                            |
  PREPARATION                             |                            |                            |
0067 0003.10                  25.000  DAY |     240.85000       6021.25|     175.00000       4375.00|     160.00000        4000.00
  FLAGGING                                |                            |                            |
0068 0010.04                   1.000  EACH|    1423.00000       1423.00|    5000.00000       5000.00|    2200.00000        2200.00
  FIELD OFFICE                            |                            |                            |
0069 0020.00                1000.000  HOUR|       0.80000        800.00|       0.80000        800.00|       0.80000         800.00
  TRAINING                                |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 12/06/01
                                                                                                             PAGE : 7
                                                        TABULATION OF BIDS

     CALL ORDER   : F11                    CONTRACT ID : 2597A                        COUNTIES : SARPY
      LETTING DATE : 12/06/01  1:30 PM        DISTRICT    : 2
                                                                                       PROJECT(S) : EACBR-6-7(173)



====================================================================================================================================
                                          |(1) 0049                    |(2) 2817                    |(3) 2182
                                          |HAWKINS CONSTRUCTION COMPANY|MCC, L.L.C.                 |WBE COMPANY, INC.
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0070 0030.00                          LUMP|       1.00000          1.00|    2000.00000       2000.00|       1.00000           1.00
  MOBILIZATION                            |                            |                            |
     SECTION TOTALS                       |             $     16,756.05|             $     22,062.60|                $     16,392.00
------------------------------------------+----------------------------+----------------------------+-------------------------------
     CONTRACT TOTALS                      |             $  1,070,464.28|             $  1,099,737.06|                $  1,139,850.41
====================================================================================================================================
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 12/06/01
                                                                                                             PAGE : 8
                                                        TABULATION OF BIDS

     CALL ORDER   : F11                    CONTRACT ID : 2597A                        COUNTIES : SARPY
      LETTING DATE : 12/06/01  1:30 PM        DISTRICT    : 2
                                                                                       PROJECT(S) : EACBR-6-7(173)



====================================================================================================================================
                                          |(4) 0774                    |                            |
                                          |DIXON CONSTRUCTION CO.      |                            |
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0001   GROUP 1 GRADING
                                          |                            |                            |
0001 L006.50                   4.200  ACRE|     487.50000       2047.50|                            |
  TEMPORARY SEEDING                       |                            |                            |
0002 L020.00                2745.000  SY  |       1.80000       4941.00|                            |
  EROSION CONTROL                         |                            |                            |
0003 L020.12                1550.000  SY  |       4.00000       6200.00|                            |
  EROSION CONTROL, TYPE B-2               |                            |                            |
0004 L021.06                  24.000  BALE|      20.00000        480.00|                            |
  EROSION CHECKS, TYPE HV                 |                            |                            |
0005 L022.11                 800.000  LF  |       3.00000       2400.00|                            |
  FABRIC SILT FENCE-LOW POROSITY          |                            |                            |
0006 0030.10                          LUMP|    7800.00000       7800.00|                            |
  MOBILIZATION                            |                            |                            |
0007 1009.00                          LUMP|   13000.00000      13000.00|                            |
  GENERAL CLEARING AND GRUBBING           |                            |                            |
0008 1010.01                9342.000  CY  |       1.38000      12891.96|                            |
  EXCAVATION (ESTABLISHED QUANTITY)       |                            |                            |
0009 1011.00                 240.000  MGAL|       1.00000        240.00|                            |
  WATER                                   |                            |                            |
0010 1012.00                   4.000  EACH|     100.00000        400.00|                            |
  RIGHT-OF-WAY MARKERS                    |                            |                            |
0011 1030.00               17310.000  CY  |       3.98000      68893.80|                            |
  EARTHWORK MEASURED IN EMBANKMENT        |                            |                            |
0012 1101.00                2658.000  SY  |       3.80000      10100.40|                            |
  REMOVE PAVEMENT                         |                            |                            |
0013 4050.01                  67.000  CY  |       5.00000        335.00|                            |
  EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,|                            |                            |
   AND HEADWALLS                          |                            |                            |
0014 4200.36                   1.000  EACH|    2885.00000       2885.00|                            |
  36" AUTOMATIC FLOOD CONTROL GATE        |                            |                            |
0015 4350.36                  56.000  LF  |      27.14000       1519.84|                            |
  36" CORRUGATED METAL PIPE               |                            |                            |
0016 4350.60                 410.000  LF  |      62.54000      25641.40|                            |
  60" CORRUGATED METAL PIPE               |                            |                            |
0017 4360.36                   1.000  EACH|     322.00000        322.00|                            |
  36" METAL FLARED-END SECTION            |                            |                            |
0018 7017.00                 550.000  LF  |       1.50000        825.00|                            |
  REMOVE GUARDRAIL                        |                            |                            |
0019 9110.01                  10.000  HOUR|      95.00000        950.00|                            |
  RENTAL OF LOADER, FULLY OPERATED        |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 12/06/01
                                                                                                             PAGE : 9
                                                        TABULATION OF BIDS

     CALL ORDER   : F11                    CONTRACT ID : 2597A                        COUNTIES : SARPY
      LETTING DATE : 12/06/01  1:30 PM        DISTRICT    : 2
                                                                                       PROJECT(S) : EACBR-6-7(173)



====================================================================================================================================
                                          |(4) 0774                    |                            |
                                          |DIXON CONSTRUCTION CO.      |                            |
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0020 9110.03                  10.000  HOUR|      55.00000        550.00|                            |
  RENTAL OF DUMP TRUCK, FULLY OPERATED    |                            |                            |
0021 9110.07                  10.000  HOUR|      55.00000        550.00|                            |
  RENTAL OF SKID LOADER, FULLY OPERATED   |                            |                            |
     SECTION TOTALS                       |             $    162,972.90|                            |
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0002   GROUP 3 CONCRETE PAVEMENT
                                          |                            |                            |
0022 L001.02                   0.580  ACRE|     709.62000        411.58|                            |
  SEEDING, TYPE B                         |                            |                            |
0023 L001.03                   1.200  ACRE|     749.00000        898.80|                            |
  SEEDING, TYPE C                         |                            |                            |
0024 L032.75                   4.000  TON |      70.00000        280.00|                            |
  MULCH                                   |                            |                            |
0025 0030.30                          LUMP|   20000.00000      20000.00|                            |
  MOBILIZATION                            |                            |                            |
0026 3075.42                1563.000  SY  |      29.55000      46186.65|                            |
  9" CONCRETE PAVEMENT, CLASS 47B-3500    |                            |                            |
0027 3075.46                2343.000  SY  |      33.45000      78373.35|                            |
  9" DOWELED CONCRETE PAVEMENT, CLASS     |                            |                            |
  47B-3500                                |                            |                            |
0028 3089.25                7976.000  SY  |      28.90000     230506.40|                            |
  TEMPORARY SURFACING 10"                 |                            |                            |
0029 8029.04                3906.000  SY  |       5.85000      22850.10|                            |
  AGGREGATE FOUNDATION COURSE 4"          |                            |                            |
0030 9111.00                 212.000  MGAL|       5.50000       1166.00|                            |
  WATER                                   |                            |                            |
0031 9170.00                  17.640  STA |     200.00000       3528.00|                            |
  EARTH SHOULDER CONSTRUCTION             |                            |                            |
0032 9173.20                3906.000  SY  |       3.00000      11718.00|                            |
  SUBGRADE PREPARATION                    |                            |                            |
0033 9188.50                  87.000  SY  |      35.05000       3049.35|                            |
  SURFACING UNDER GUARDRAIL               |                            |                            |
     SECTION TOTALS                       |             $    418,968.23|                            |
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0003   GROUP 6 BRIDGE AT STA. 18+21.67
               1-44' & 2-33' SPANS, CONCRETE SLAB BRIDGE - CONTINUOUS TYPE
                                          |                            |                            |
0034 0030.60                          LUMP|   70000.00000      70000.00|                            |
  MOBILIZATION                            |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 12/06/01
                                                                                                             PAGE : 10
                                                        TABULATION OF BIDS

     CALL ORDER   : F11                    CONTRACT ID : 2597A                        COUNTIES : SARPY
      LETTING DATE : 12/06/01  1:30 PM        DISTRICT    : 2
                                                                                       PROJECT(S) : EACBR-6-7(173)



====================================================================================================================================
                                          |(4) 0774                    |                            |
                                          |DIXON CONSTRUCTION CO.      |                            |
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0035 1010.01                 120.000  CY  |      10.00000       1200.00|                            |
  EXCAVATION (ESTABLISHED QUANTITY)       |                            |                            |
0036 1043.50                  64.000  SY  |       2.00000        128.00|                            |
  RIPRAP FILTER FABRIC                    |                            |                            |
0037 3050.15                 203.700  CY  |     240.00000      48888.00|                            |
  CONCRETE FOR PAVEMENT APPROACHES CLASS  |                            |                            |
  47BD-4000                               |                            |                            |
0038 3051.10               20480.000  LB  |       0.72000      14745.60|                            |
  EPOXY COATED REINFORCING STEEL FOR      |                            |                            |
  PAVEMENT APPROACHES                     |                            |                            |
0039 6000.10                  75.000  LS  |    7500.00000       7500.00|                            |
  ABUTMENT NO.1 EXCAVATION                |                            |                            |
0040 6000.11                  75.000  LS  |    7500.00000       7500.00|                            |
  ABUTMENT NO.2 EXCAVATION                |                            |                            |
0041 6001.50                  55.000  LS  |   15000.00000      15000.00|                            |
  BENT NO.1 EXCAVATION                    |                            |                            |
0042 6001.51                  55.000  LS  |   15000.00000      15000.00|                            |
  BENT NO.2 EXCAVATION                    |                            |                            |
0043 6010.22                 236.300  CY  |     300.00000      70890.00|                            |
  CLASS 47B-3000 CONCRETE FOR BRIDGE      |                            |                            |
0044 6010.26                 289.800  CY  |     300.00000      86940.00|                            |
  CLASS 47BD-4000 CONCRETE FOR BRIDGE     |                            |                            |
0045 6040.00                   1.000  EACH|   50000.00000      50000.00|                            |
  REMOVE STRUCTURE AT STA. 18+26.48       |                            |                            |
0046 6080.00                 800.000  LB  |       5.00000       4000.00|                            |
  STRUCTURAL STEEL FOR SUBSTRUCTURE       |                            |                            |
0047 6104.00                 270.000  TON |      10.00000       2700.00|                            |
  BROKEN CONCRETE RIPRAP                  |                            |                            |
0048 6105.02                 100.800  TON |      30.00000       3024.00|                            |
  ROCK RIPRAP, TYPE B                     |                            |                            |
0049 6131.50               84915.000  LB  |       0.54000      45854.10|                            |
  EPOXY COATED REINFORCING STEEL          |                            |                            |
0050 6139.50                  49.800  SY  |      30.00000       1494.00|                            |
  SUBSURFACE DRAINAGE MATTING             |                            |                            |
0051 6210.12                 980.000  LF  |      15.00000      14700.00|                            |
  HP 10"X42# STEEL PILING                 |                            |                            |
0052 6210.14                2620.000  LF  |      18.00000      47160.00|                            |
  HP 12"X53# STEEL PILING                 |                            |                            |
0053 6310.00                2561.900  SF  |      12.00000      30742.80|                            |
  STEEL SHEET PILING                      |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 12/06/01
                                                                                                             PAGE : 11
                                                        TABULATION OF BIDS

     CALL ORDER   : F11                    CONTRACT ID : 2597A                        COUNTIES : SARPY
      LETTING DATE : 12/06/01  1:30 PM        DISTRICT    : 2
                                                                                       PROJECT(S) : EACBR-6-7(173)



====================================================================================================================================
                                          |(4) 0774                    |                            |
                                          |DIXON CONSTRUCTION CO.      |                            |
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0054 8091.00                  88.500  CY  |      40.00000       3540.00|                            |
  GRANULAR BACKFILL                       |                            |                            |
     SECTION TOTALS                       |             $    541,006.50|                            |
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0004   GROUP 7 GUARDRAIL
                                          |                            |                            |
0055 0030.70                          LUMP|    2000.00000       2000.00|                            |
  MOBILIZATION                            |                            |                            |
0056 7011.20                 225.000  LF  |      14.00000       3150.00|                            |
  W-BEAM GUARDRAIL                        |                            |                            |
0057 7020.00                   4.000  EACH|    1200.00000       4800.00|                            |
  BRIDGE APPROACH SECTIONS                |                            |                            |
0058 7024.25                   1.000  EACH|    2000.00000       2000.00|                            |
  GUARDRAIL END TREATMENT, TYPE 1         |                            |                            |
0059 7024.27                   3.000  EACH|    1600.00000       4800.00|                            |
  GUARDRAIL END TREATMENT, TYPE II        |                            |                            |
     SECTION TOTALS                       |             $     16,750.00|                            |
------------------------------------------+----------------------------+----------------------------+-------------------------------
SECTION 0005   GROUP 10 GENERAL ITEMS
                                          |                            |                            |
0060 0001.08                1960.000  BDAY|       0.50000        980.00|                            |
  BARRICADE, TYPE II                      |                            |                            |
0061 0001.10                1244.000  BDAY|       1.95000       2425.80|                            |
  BARRICADE, TYPE III                     |                            |                            |
0062 0001.30                 404.000  LDAY|       1.95000        787.80|                            |
  TYPE B HIGH INTENSITY WARNING LIGHT     |                            |                            |
0063 0001.90                5068.000  EACH|       0.30000       1520.40|                            |
  SIGN DAY                                |                            |                            |
0064 0002.30                1000.000  LF  |       0.40000        400.00|                            |
  PAVEMENT MARKING REMOVAL                |                            |                            |
0065 0002.44               12500.000  LF  |       0.08000       1000.00|                            |
  TEMPORARY PAVEMENT MARKING, TYPE PAINT  |                            |                            |
0066 0002.47                 800.000  LF  |       0.50000        400.00|                            |
  TEMPORARY PAVEMENT MARKING SURFACE      |                            |                            |
  PREPARATION                             |                            |                            |
0067 0003.10                  25.000  DAY |     200.00000       5000.00|                            |
  FLAGGING                                |                            |                            |
0068 0010.04                   1.000  EACH|    1500.00000       1500.00|                            |
  FIELD OFFICE                            |                            |                            |
0069 0020.00                1000.000  HOUR|       0.80000        800.00|                            |
  TRAINING                                |                            |                            |
                                                     NEBRASKA DEPARTMENT OF ROADS                             DATE : 12/06/01
                                                                                                             PAGE : 12
                                                        TABULATION OF BIDS

     CALL ORDER   : F11                    CONTRACT ID : 2597A                        COUNTIES : SARPY
      LETTING DATE : 12/06/01  1:30 PM        DISTRICT    : 2
                                                                                       PROJECT(S) : EACBR-6-7(173)



====================================================================================================================================
                                          |(4) 0774                    |                            |
                                          |DIXON CONSTRUCTION CO.      |                            |
LINE NO / ITEM CODE / ALT                 |                            |                            |
ITEM DESCRIPTION           QUANTITY       |  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT|  UNIT PRICE          AMOUNT
------------------------------------------+----------------------------+----------------------------+-------------------------------
0070 0030.00                          LUMP|   10000.00000      10000.00|                            |
  MOBILIZATION                            |                            |                            |
     SECTION TOTALS                       |             $     24,814.00|                            |
------------------------------------------+----------------------------+----------------------------+-------------------------------
     CONTRACT TOTALS                      |             $  1,164,511.63|                            |
====================================================================================================================================