Contract Letting February 07, 2002 |
NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 2 VENDOR RANKING CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) CONTRACT DESCRIPTION : ON N-2 BETWEEN ANSELMO AND MERNA. -------------------------------------------------------------------------------------------------------------------------- VENDOR NO. BID NOTES -------------------------------------------------------------------------------------------------------------------------- 0574 THE TOTAL AMOUNT OF WORK WHICH WILL BE ACCEPTED IN THIS 0574 LETTING IS LIMITED TO $10,000,000. -------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID -------------------------------------------------------------------------------------------------------------------------- 1 0574 CONSTRUCTORS, INC. $ 3,986,213.77 100.0000% 2 0083 WERNER CONSTRUCTION, INC. $ 3,996,385.20 100.2551% 3 0477 WESTERN ENGINEERING COMPANY, INC. $ 4,034,386.01 101.2084% 4 2252 PAULSEN, INC. $ 4,143,761.05 103.9523% 5 2853 SIMON CONTRACTORS AND SUBSIDIARIES $ 4,518,225.51 113.3462% NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 3 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(1) 0574 |(2) 0083 |(3) 0477 |CONSTRUCTORS, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 GROUP 1 GRADING | | | 0001 L022.11 5431.000 m | 6.25000 33943.75| 9.00000 48879.00| 9.00000 48879.00 FABRIC SILT FENCE-LOW POROSITY | | | 0002 0030.10 LUMP| 4100.00000 4100.00| 4000.00000 4000.00| 21000.00000 21000.00 MOBILIZATION | | | 0003 1009.00 LUMP| 1025.00000 1025.00| 1000.00000 1000.00| 1100.00000 1100.00 GENERAL CLEARING AND GRUBBING | | | 0004 1011.00 11690.000 kL | 2.70000 31563.00| 2.64000 30861.60| 2.75000 32147.50 WATER | | | 0005 1030.00 111349.000 m3 | 3.55000 395288.95| 3.46000 385267.54| 3.80000 423126.20 EARTHWORK MEASURED IN EMBANKMENT | | | 0006 1101.00 416.000 m2 | 8.20000 3411.20| 8.00000 3328.00| 8.00000 3328.00 REMOVE PAVEMENT | | | 0007 1102.00 3657.000 m2 | 8.20000 29987.40| 8.00000 29256.00| 6.00000 21942.00 REMOVE ASPHALT SURFACE | | | 0008 1106.00 2491.000 m2 | 8.20000 20426.20| 8.00000 19928.00| 6.00000 14946.00 REMOVE DRIVEWAY | | | 0009 1108.00 576.000 m | 20.50000 11808.00| 20.00000 11520.00| 15.00000 8640.00 REMOVE COMBINATION CURB AND GUTTER | | | 0010 1701.24 237.100 m | 76.90000 18232.99| 75.00000 17782.50| 75.00000 17782.50 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3, | | | 4,5,6,7 OR 8 | | | 0011 1701.30 10.500 m | 92.25000 968.63| 90.00000 945.00| 90.00000 945.00 750 mm DRIVEWAY CULVERT PIPE, TYPE 2,3, | | | 4,5,6,7 OR 8 | | | 0012 1701.36 48.000 m | 102.50000 4920.00| 100.00000 4800.00| 100.00000 4800.00 900 mm DRIVEWAY CULVERT PIPE, TYPE 2,3, | | | 4,5,6,7 OR 8 | | | 0013 1703.48 16.000 m | 123.00000 1968.00| 120.00000 1920.00| 120.00000 1920.00 1200 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,| | | 4 OR 5 | | | 0014 4040.00 1.000 EACH| 410.00000 410.00| 400.00000 400.00| 400.00000 400.00 REMOVE HEADWALLS FROM CULVERTS | | | SECTION TOTALS | $ 558,053.12| $ 559,887.64| $ 600,956.20 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 GROUP 4 CULVERTS | | | 0015 P300.24 49.600 m | 53.30000 2643.68| 52.00000 2579.20| 52.00000 2579.20 600 mm CULVERT PIPE, TYPE 3,4 OR 5 | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 4 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(1) 0574 |(2) 0083 |(3) 0477 |CONSTRUCTORS, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0016 P300.30 23.300 m | 72.80000 1696.24| 71.00000 1654.30| 71.00000 1654.30 750 mm CULVERT PIPE, TYPE 3,4 OR 5 | | | 0017 P300.36 14.200 m | 86.00000 1221.20| 84.00000 1192.80| 84.00000 1192.80 900 mm CULVERT PIPE, TYPE 3,4 OR 5 | | | 0018 P300.48 73.800 m | 132.25000 9760.05| 129.00000 9520.20| 129.00000 9520.20 1200 mm CULVERT PIPE, TYPE 3,4 OR 5 | | | 0019 P300.60 9.400 m | 187.60000 1763.44| 183.00000 1720.20| 183.00000 1720.20 1500 mm CULVERT PIPE, TYPE 3,4 OR 5 | | | 0020 P372.30 14.500 m | 109.70000 1590.65| 107.00000 1551.50| 107.00000 1551.50 750 mm ROUND EQUIVALENT CULVERT PIPE, | | | TYPE 2,4 OR 5 | | | 0021 P500.24 69.900 m | 72.80000 5088.72| 71.00000 4962.90| 71.00000 4962.90 600 mm CULVERT PIPE, TYPE 2,4,5,7 OR 8 | | | 0022 P500.36 47.000 m | 118.00000 5546.00| 115.00000 5405.00| 115.00000 5405.00 900 mm CULVERT PIPE, TYPE 2,4,5,7 OR 8 | | | 0023 0030.40 LUMP| 6420.00000 6420.00| 6260.00000 6260.00| 6300.00000 6300.00 MOBILIZATION | | | 0024 1119.00 1.000 EACH| 153.80000 153.80| 150.00000 150.00| 150.00000 150.00 REMOVE INLET | | | 0025 4035.00 47.000 EACH| 51.25000 2408.75| 50.00000 2350.00| 50.00000 2350.00 REMOVE FLARED-END SECTION | | | 0026 4040.00 6.000 EACH| 143.50000 861.00| 140.00000 840.00| 140.00000 840.00 REMOVE HEADWALLS FROM CULVERTS | | | 0027 4043.00 131.300 m | 15.40000 2022.02| 15.00000 1969.50| 15.00000 1969.50 REMOVE CULVERT PIPE | | | 0028 4044.00 1.000 EACH| 1025.00000 1025.00| 1000.00000 1000.00| 1000.00000 1000.00 PREPARATION OF STRUCTURE AT STA. | | | 33+79.30 | | | 0029 4044.01 1.000 EACH| 1025.00000 1025.00| 1000.00000 1000.00| 1000.00000 1000.00 PREPARATION OF STRUCTURE AT STA. | | | 50+22.30 | | | 0030 4044.02 1.000 EACH| 717.70000 717.70| 700.00000 700.00| 700.00000 700.00 PREPARATION OF STRUCTURE AT STA. 75+23 | | | 0031 4044.03 1.000 EACH| 666.00000 666.00| 650.00000 650.00| 650.00000 650.00 PREPARATION OF STRUCTURE AT STA. | | | 89+71.20 | | | 0032 4044.04 1.000 EACH| 666.00000 666.00| 650.00000 650.00| 650.00000 650.00 PREPARATION OF STRUCTURE AT STA. | | | 102+33.60 | | | 0033 4044.05 1.000 EACH| 666.00000 666.00| 650.00000 650.00| 650.00000 650.00 PREPARATION OF STRUCTURE AT STA. | | | 120+72.30 | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 5 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(1) 0574 |(2) 0083 |(3) 0477 |CONSTRUCTORS, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0034 4044.06 1.000 EACH| 615.00000 615.00| 600.00000 600.00| 600.00000 600.00 PREPARATION OF STRUCTURE AT STA. | | | 129+66.90 | | | 0035 4050.01 563.000 m3 | 8.20000 4616.60| 8.00000 4504.00| 8.00000 4504.00 EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,| | | AND HEADWALLS | | | 0036 4051.01 121.000 m3 | 9.20000 1113.20| 9.00000 1089.00| 9.00000 1089.00 EXCAVATION FOR BOX CULVERTS | | | 0037 4101.06 90.275 m3 | 358.80000 32390.67| 350.00000 31596.25| 350.00000 31596.25 CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | 0038 4151.00 5002.000 kg | 1.55000 7753.10| 1.50000 7503.00| 1.50000 7503.00 REINFORCING STEEL FOR BOX CULVERT | | | 0039 4310.24 26.000 EACH| 175.00000 4550.00| 170.00000 4420.00| 170.00000 4420.00 600 mm FLARED-END SECTION | | | 0040 4310.30 6.000 EACH| 251.00000 1506.00| 245.00000 1470.00| 245.00000 1470.00 750 mm FLARED-END SECTION | | | 0041 4310.36 10.000 EACH| 333.00000 3330.00| 325.00000 3250.00| 325.00000 3250.00 900 mm FLARED-END SECTION | | | 0042 4310.48 10.000 EACH| 718.00000 7180.00| 700.00000 7000.00| 700.00000 7000.00 1200 mm FLARED-END SECTION | | | 0043 4310.60 2.000 EACH| 1130.00000 2260.00| 1100.00000 2200.00| 1100.00000 2200.00 1500 mm FLARED-END SECTION | | | 0044 4320.30 2.000 EACH| 287.00000 574.00| 280.00000 560.00| 280.00000 560.00 750 mm ROUND EQUIVALENT FLARED-END | | | SECTION | | | SECTION TOTALS | $ 111,829.82| $ 108,997.85| $ 109,037.85 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 GROUP 4A CULVERT AT STA. 83+97.40 TWIN 3.0m X 1.8m X 15.2m CONCRETE BOX CULVERT | | | 0045 0030.40 LUMP| 2000.00000 2000.00| 1930.00000 1930.00| 1930.00000 1930.00 MOBILIZATION | | | 0046 4044.07 1.000 EACH| 1850.00000 1850.00| 1800.00000 1800.00| 1800.00000 1800.00 PREPARATION OF STRUCTURE AT STA. | | | 83+97.40 | | | 0047 4051.01 41.000 m3 | 9.25000 379.25| 9.00000 369.00| 9.00000 369.00 EXCAVATION FOR BOX CULVERTS | | | 0048 4101.06 46.000 m3 | 340.00000 15640.00| 330.00000 15180.00| 330.00000 15180.00 CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 6 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(1) 0574 |(2) 0083 |(3) 0477 |CONSTRUCTORS, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0049 4151.00 2683.000 kg | 1.55000 4158.65| 1.50000 4024.50| 1.50000 4024.50 REINFORCING STEEL FOR BOX CULVERT | | | SECTION TOTALS | $ 24,027.90| $ 23,303.50| $ 23,303.50 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0004 GROUP 4B CULVERT AT STA. 145+54.00 TWIN 3.0m X 2.4m X 18.5m CONCRETE BOX CULVERT | | | 0050 0030.40 LUMP| 2000.00000 2000.00| 1930.00000 1930.00| 1930.00000 1930.00 MOBILIZATION | | | 0051 4044.07 1.000 EACH| 2565.00000 2565.00| 2500.00000 2500.00| 2500.00000 2500.00 PREPARATION OF STRUCTURE AT STA. | | | 145+54.00 | | | 0052 4051.01 67.000 m3 | 9.25000 619.75| 9.00000 603.00| 9.00000 603.00 EXCAVATION FOR BOX CULVERTS | | | 0053 4101.06 53.200 m3 | 340.00000 18088.00| 330.00000 17556.00| 330.00000 17556.00 CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | 0054 4151.00 3053.000 kg | 1.55000 4732.15| 1.50000 4579.50| 1.50000 4579.50 REINFORCING STEEL FOR BOX CULVERT | | | SECTION TOTALS | $ 28,004.90| $ 27,168.50| $ 27,168.50 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0005 GROUP 4C CULVERT AT STA. 171+56.40 TWIN 3.6m X 1.5m X 15.8m CONCRETE BOX CULVERT | | | 0055 0030.40 LUMP| 2000.00000 2000.00| 1930.00000 1930.00| 1930.00000 1930.00 MOBILIZATION | | | 0056 4044.07 1.000 EACH| 2100.00000 2100.00| 1990.00000 1990.00| 1990.00000 1990.00 PREPARATION OF STRUCTURE AT STA. | | | 171+56.40 | | | 0057 4051.01 60.000 m3 | 9.25000 555.00| 9.00000 540.00| 9.00000 540.00 EXCAVATION FOR BOX CULVERTS | | | 0058 4101.06 53.000 m3 | 340.00000 18020.00| 330.00000 17490.00| 330.00000 17490.00 CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | 0059 4151.00 3442.000 kg | 1.55000 5335.10| 1.50000 5163.00| 1.50000 5163.00 REINFORCING STEEL FOR BOX CULVERT | | | SECTION TOTALS | $ 28,010.10| $ 27,113.00| $ 27,113.00 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0006 GROUP 5 SEEDING | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 7 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(1) 0574 |(2) 0083 |(3) 0477 |CONSTRUCTORS, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0060 L001.01 14.600 ha | 1230.00000 17958.00| 1200.00000 17520.00| 1200.00000 17520.00 SEEDING, TYPE A | | | 0061 L001.02 14.000 ha | 975.00000 13650.00| 950.00000 13300.00| 950.00000 13300.00 SEEDING, TYPE B | | | 0062 L032.75 143.000 Mg | 72.00000 10296.00| 90.00000 12870.00| 90.00000 12870.00 MULCH | | | 0063 0030.50 LUMP| 1100.00000 1100.00| 5000.00000 5000.00| 5000.00000 5000.00 MOBILIZATION | | | SECTION TOTALS | $ 43,004.00| $ 48,690.00| $ 48,690.00 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0007 GROUP 7 GUARDRAIL | | | 0064 0030.70 LUMP| 500.00000 500.00| 500.00000 500.00| 200.00000 200.00 MOBILIZATION | | | 0065 7015.00 700.000 m | 20.50000 14350.00| 20.00000 14000.00| 20.00000 14000.00 CABLE GUARDRAIL | | | 0066 7023.00 2.000 EACH| 1250.00000 2500.00| 1200.00000 2400.00| 1200.00000 2400.00 TERMINAL ANCHORAGE SECTIONS | | | 0067 7024.00 1.000 EACH| 2500.00000 2500.00| 2400.00000 2400.00| 2400.00000 2400.00 INTERMEDIATE ANCHORAGE SECTIONS | | | SECTION TOTALS | $ 19,850.00| $ 19,300.00| $ 19,000.00 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0008 GROUP 8B ELECTRICAL | | | 0068 A001.12 1.000 EACH| 410.00000 410.00| 400.00000 400.00| 400.00000 400.00 PULL BOX, TYPE PB-5 | | | 0069 A009.14 2.000 EACH| 1850.00000 3700.00| 1800.00000 3600.00| 1800.00000 3600.00 STREET LIGHTING UNIT, TYPE | | | SL-BT-12.2-3.7-0.25 | | | 0070 A020.10 1.000 EACH| 1400.00000 1400.00| 1350.00000 1350.00| 1350.00000 1350.00 LIGHTING CONTROL CENTER, TYPE D | | | 0071 A070.10 96.000 m | 7.70000 739.20| 7.50000 720.00| 7.50000 720.00 38 mm CONDUIT IN TRENCH | | | 0072 A072.10 25.000 m | 10.25000 256.25| 10.00000 250.00| 10.00000 250.00 38 mm CONDUIT UNDER ROADWAY | | | 0073 A080.22 121.000 m | 1.85000 223.85| 1.80000 217.80| 1.80000 217.80 STREET LIGHTING CABLE, NO. 6 BARE | | | 0074 A080.24 242.000 m | 2.05000 496.10| 2.00000 484.00| 2.00000 484.00 STREET LIGHTING CABLE, NO. 6 USE | | | 0075 0030.81 LUMP| 2100.00000 2100.00| 2047.00000 2047.00| 2100.00000 2100.00 MOBILIZATION | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 8 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(1) 0574 |(2) 0083 |(3) 0477 |CONSTRUCTORS, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION TOTALS | $ 9,325.40| $ 9,068.80| $ 9,121.80 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0009 GROUP 9 BITUMINOUS | | | 0076 0002.55 592.680 StaM| 21.50000 12742.62| 23.00000 13631.64| 21.00000 12446.28 OVERLAY BROKEN LINES | | | 0077 0002.60 1185.360 StaM| 21.50000 25485.24| 26.00000 30819.36| 21.00000 24892.56 OVERLAY SOLID LINES | | | 0078 0030.90 LUMP| 117500.00000 117500.00| 49000.00000 49000.00| 35000.00000 35000.00 MOBILIZATION | | | 0079 1020.02 74.000 EACH| 8.20000 606.80| 11.00000 814.00| 12.00000 888.00 DELINEATOR, TYPE II | | | 0080 1020.03 23.000 EACH| 8.20000 188.60| 11.75000 270.25| 18.00000 414.00 DELINEATOR, TYPE III | | | 0081 1020.20 8.000 EACH| 25.60000 204.80| 18.00000 144.00| 20.00000 160.00 INSTALL CHEVRONS | | | 0082 2001.00 230.000 m3 | 18.40000 4232.00| 13.75000 3162.50| 18.00000 4140.00 GRAVEL SURFACE COURSE | | | 0083 2021.00 3.000 EACH| 51.25000 153.75| 50.00000 150.00| 50.00000 150.00 MAILBOX POST | | | 0084 3012.04 128.000 m | 76.35000 9772.80| 74.50000 9536.00| 74.50000 9536.00 CONCRETE 47B-25 MEDIAN CURB | | | 0085 3013.15 63.800 m | 77.35000 4934.93| 75.45000 4813.71| 75.45000 4813.71 CONCRETE CLASS 47B-25 BARRIER CURB | | | 0086 3014.11 494.000 m | 70.65000 34901.10| 68.90000 34036.60| 68.90000 34036.60 COMBINATION CONCRETE CLASS 47B-25 CURB | | | AND GUTTER | | | 0087 3017.39 265.000 m2 | 40.00000 10600.00| 38.95000 10321.75| 39.00000 10335.00 CONCRETE CLASS 47B-20 MEDIAN SURFACING | | | 0088 3019.24 1.000 EACH| 666.45000 666.45| 650.00000 650.00| 650.00000 650.00 CONCRETE CLASS 47B-25 ISLAND NOSE | | | 0089 3020.24 226.000 m2 | 37.65000 8508.90| 36.70000 8294.20| 36.70000 8294.20 CONCRETE CLASS 47B-25 DRIVEWAY | | | 0090 3075.32 503.000 m2 | 40.65000 20446.95| 39.65000 19943.95| 39.65000 19943.95 205 mm CONCRETE PAVEMENT, CLASS 47B-25 | | | 0091 4003.00 265.000 kg | 1.55000 410.75| 4.00000 1060.00| 6.00000 1590.00 CAST IRON COVER, FRAME, AND FLANGE | | | 0092 4015.00 2.000 EACH| 310.00000 620.00| 450.00000 900.00| 1000.00000 2000.00 ADJUST MANHOLE TO GRADE | | | 0093 7502.04 800.000 m | 6.40000 5120.00| 6.90000 5520.00| 6.67000 5336.00 100 mm WHITE PREFORMED PAVEMENT MARKING,| | | TYPE 4 | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 9 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(1) 0574 |(2) 0083 |(3) 0477 |CONSTRUCTORS, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0094 7503.04 1100.000 m | 6.40000 7040.00| 7.05000 7755.00| 6.92000 7612.00 100 mm YELLOW PREFORMED PAVEMENT | | | MARKING, TYPE 4 | | | 0095 7508.04 75.000 m | 19.25000 1443.75| 17.70000 1327.50| 20.00000 1500.00 300 mm WHITE PREFORMED PAVEMENT MARKING,| | | TYPE 4 | | | 0096 7509.04 650.000 m | 19.25000 12512.50| 17.80000 11570.00| 21.00000 13650.00 300 mm YELLOW PREFORMED PAVEMENT | | | MARKING, TYPE 4 | | | 0097 7512.04 42.000 m | 38.45000 1614.90| 31.00000 1302.00| 40.00000 1680.00 600 mm WHITE PREFORMED PAVEMENT MARKING,| | | TYPE 4 | | | 0098 8111.00 366.816 StaM| 306.20000 112319.06| 250.00000 91704.00| 170.00000 62358.72 SHOULDER SUBGRADE PREPARATION | | | 0099 9000.73 500.000 Mg | 11.85000 5925.00| 13.68000 6840.00| 13.00000 6500.00 ASPHALTIC CONCRETE FOR STATE | | | MAINTENANCE PATCHING, TYPE SPS | | | 0100 9005.00 250.000 Mg | 46.00000 11500.00| 32.82000 8205.00| 28.00000 7000.00 ASPHALTIC CONCRETE FOR PATCHING, TYPE | | | SP4 | | | 0101 9005.23 36350.000 Mg | 13.40000 487090.00| 13.68000 497268.00| 13.50000 490725.00 ASPHALTIC CONCRETE, TYPE SPS | | | 0102 9005.45 50910.000 Mg | 22.60000 1150566.00| 22.82000 1161766.20| 24.15000 1229476.50 ASPHALTIC CONCRETE, TYPE SP4(12.5) | | | 0103 9009.00 11096.000 m2 | 2.85000 31623.60| 3.50000 38836.00| 3.00000 33288.00 PLACEMENT OF ASPHALTIC CONCRETE FOR | | | DRIVEWAYS AND INTERSECTIONS | | | 0104 9020.92 27.000 Mg | 158.00000 4266.00| 159.00000 4293.00| 157.40000 4249.80 PERFORMANCE GRADED BINDER (58-28) FOR | | | STATE MAINTENANCE PATCHING | | | 0105 9021.01 2762.640 Mg | 158.00000 436497.12| 159.00000 439259.76| 157.40000 434839.54 PERFORMANCE GRADED BINDER (64-22) | | | 0106 9021.03 1962.900 Mg | 158.00000 310138.20| 159.00000 312101.10| 157.40000 308960.46 PERFORMANCE GRADED BINDER (58-28) | | | 0107 9034.00 11096.000 m2 | 1.15000 12760.40| 2.50000 27740.00| 2.00000 22192.00 PREPARATION OF INTERSECTIONS AND | | | DRIVEWAYS | | | 0108 9053.00 166050.000 L | 0.19000 31549.50| 0.26000 43173.00| 0.29000 48154.50 TACK COAT | | | 0109 9111.00 2300.000 kL | 2.45000 5635.00| 3.25000 7475.00| 3.25000 7475.00 WATER | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 10 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(1) 0574 |(2) 0083 |(3) 0477 |CONSTRUCTORS, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0110 9140.00 6.273 StaM| 164.00000 1028.77| 160.00000 1003.68| 160.00000 1003.68 JOINT SEALING - ASPHALT TO CONCRETE | | | 0111 9170.00 28.298 StaM| 154.00000 4357.89| 185.00000 5235.13| 185.00000 5235.13 EARTH SHOULDER CONSTRUCTION | | | 0112 9173.20 1004.000 m2 | 3.65000 3664.60| 2.50000 2510.00| 3.00000 3012.00 SUBGRADE PREPARATION | | | 0113 9179.23 212.317 StaM| 457.20000 97071.33| 475.00000 100850.58| 425.00000 90234.73 COLD MILLING, CLASS 3 | | | 0114 9188.50 1260.000 m2 | 14.70000 18522.00| 25.00000 31500.00| 20.50000 25830.00 SURFACING UNDER GUARDRAIL | | | 0115 9300.50 19.770 LS | 5000.00000 5000.00| 6000.00000 6000.00| 5500.00000 5500.00 ASPHALT PAVEMENT SMOOTHNESS TESTING | | | SECTION TOTALS | $ 3,009,221.31| $ 3,000,782.91| $ 2,985,103.36 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0010 GROUP 10 GENERAL ITEMS | | | 0116 0001.08 22000.000 BDAY| 0.50000 11000.00| 0.50000 11000.00| 0.50000 11000.00 BARRICADE, TYPE II | | | 0117 0001.10 1952.000 BDAY| 2.05000 4001.60| 2.50000 4880.00| 4.00000 7808.00 BARRICADE, TYPE III | | | 0118 0001.30 976.000 LDAY| 2.30000 2244.80| 2.50000 2440.00| 4.00000 3904.00 TYPE B HIGH INTENSITY WARNING LIGHT | | | 0119 0001.75 2295.000 EACH| 5.10000 11704.50| 5.00000 11475.00| 5.00000 11475.00 TEMPORARY SIGN DAY | | | 0120 0001.90 30256.000 EACH| 0.22000 6656.32| 0.50000 15128.00| 0.80000 24204.80 SIGN DAY | | | 0121 0003.10 200.000 DAY | 180.00000 36000.00| 175.00000 35000.00| 200.00000 40000.00 FLAGGING | | | 0122 0003.20 50.000 DAY | 235.00000 11750.00| 275.00000 13750.00| 300.00000 15000.00 FURNISHING AND OPERATING PILOT VEHICLE | | | 0123 0010.04 1.000 EACH| 3750.00000 3750.00| 1500.00000 1500.00| 1500.00000 1500.00 FIELD OFFICE | | | 0124 0030.10 LUMP| 1500.00000 1500.00| 10000.00000 10000.00| 10000.00000 10000.00 MOBILIZATION | | | 0125 1017.00 19.750 LS | 35000.00000 35000.00| 33000.00000 33000.00| 33000.00000 33000.00 CONSTRUCTION STAKING AND SURVEYING | | | 0126 9110.01 200.000 HOUR| 54.00000 10800.00| 55.00000 11000.00| 50.00000 10000.00 RENTAL OF LOADER, FULLY OPERATED | | | 0127 9110.02 60.000 HOUR| 68.00000 4080.00| 65.00000 3900.00| 50.00000 3000.00 RENTAL OF MOTOR GRADER, FULLY OPERATED | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 11 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(1) 0574 |(2) 0083 |(3) 0477 |CONSTRUCTORS, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0128 9110.03 200.000 HOUR| 47.00000 9400.00| 50.00000 10000.00| 35.00000 7000.00 RENTAL OF DUMP TRUCK, FULLY OPERATED | | | 0129 9110.07 200.000 HOUR| 35.00000 7000.00| 45.00000 9000.00| 35.00000 7000.00 RENTAL OF SKID LOADER, FULLY OPERATED | | | SECTION TOTALS | $ 154,887.22| $ 172,073.00| $ 184,891.80 ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 3,986,213.77| $ 3,996,385.20| $ 4,034,386.01 ==================================================================================================================================== NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 12 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(4) 2252 |(5) 2853 | |PAULSEN, INC. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 GROUP 1 GRADING | | | 0001 L022.11 5431.000 m | 9.10000 49422.10| 8.18000 44425.58| FABRIC SILT FENCE-LOW POROSITY | | | 0002 0030.10 LUMP| 10000.00000 10000.00| 4580.67000 4580.67| MOBILIZATION | | | 0003 1009.00 LUMP| 2500.00000 2500.00| 1145.17000 1145.17| GENERAL CLEARING AND GRUBBING | | | 0004 1011.00 11690.000 kL | 2.55000 29809.50| 3.02000 35303.80| WATER | | | 0005 1030.00 111349.000 m3 | 4.15000 462098.35| 3.96000 440942.04| EARTHWORK MEASURED IN EMBANKMENT | | | 0006 1101.00 416.000 m2 | 5.15000 2142.40| 9.16000 3810.56| REMOVE PAVEMENT | | | 0007 1102.00 3657.000 m2 | 3.50000 12799.50| 9.16000 33498.12| REMOVE ASPHALT SURFACE | | | 0008 1106.00 2491.000 m2 | 3.90000 9714.90| 9.16000 22817.56| REMOVE DRIVEWAY | | | 0009 1108.00 576.000 m | 8.55000 4924.80| 22.90000 13190.40| REMOVE COMBINATION CURB AND GUTTER | | | 0010 1701.24 237.100 m | 52.65000 12483.32| 85.89000 20364.52| 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3, | | | 4,5,6,7 OR 8 | | | 0011 1701.30 10.500 m | 69.00000 724.50| 103.06000 1082.13| 750 mm DRIVEWAY CULVERT PIPE, TYPE 2,3, | | | 4,5,6,7 OR 8 | | | 0012 1701.36 48.000 m | 79.00000 3792.00| 114.52000 5496.96| 900 mm DRIVEWAY CULVERT PIPE, TYPE 2,3, | | | 4,5,6,7 OR 8 | | | 0013 1703.48 16.000 m | 120.00000 1920.00| 137.42000 2198.72| 1200 mm DRIVEWAY CULVERT PIPE, TYPE 2,3,| | | 4 OR 5 | | | 0014 4040.00 1.000 EACH| 335.00000 335.00| 458.07000 458.07| REMOVE HEADWALLS FROM CULVERTS | | | SECTION TOTALS | $ 602,666.37| $ 629,314.30| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 GROUP 4 CULVERTS | | | 0015 P300.24 49.600 m | 52.00000 2579.20| 79.52000 3944.19| 600 mm CULVERT PIPE, TYPE 3,4 OR 5 | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 13 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(4) 2252 |(5) 2853 | |PAULSEN, INC. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0016 P300.30 23.300 m | 71.00000 1654.30| 100.73000 2347.01| 750 mm CULVERT PIPE, TYPE 3,4 OR 5 | | | 0017 P300.36 14.200 m | 84.00000 1192.80| 114.60000 1627.32| 900 mm CULVERT PIPE, TYPE 3,4 OR 5 | | | 0018 P300.48 73.800 m | 129.00000 9520.20| 175.74000 12969.61| 1200 mm CULVERT PIPE, TYPE 3,4 OR 5 | | | 0019 P300.60 9.400 m | 183.00000 1720.20| 255.83000 2404.80| 1500 mm CULVERT PIPE, TYPE 3,4 OR 5 | | | 0020 P372.30 14.500 m | 107.00000 1551.50| 135.58000 1965.91| 750 mm ROUND EQUIVALENT CULVERT PIPE, | | | TYPE 2,4 OR 5 | | | 0021 P500.24 69.900 m | 71.00000 4962.90| 84.82000 5928.92| 600 mm CULVERT PIPE, TYPE 2,4,5,7 OR 8 | | | 0022 P500.36 47.000 m | 115.00000 5405.00| 146.53000 6886.91| 900 mm CULVERT PIPE, TYPE 2,4,5,7 OR 8 | | | 0023 0030.40 LUMP| 6260.00000 6260.00| 5639.95000 5639.95| MOBILIZATION | | | 0024 1119.00 1.000 EACH| 150.00000 150.00| 225.60000 225.60| REMOVE INLET | | | 0025 4035.00 47.000 EACH| 50.00000 2350.00| 169.20000 7952.40| REMOVE FLARED-END SECTION | | | 0026 4040.00 6.000 EACH| 140.00000 840.00| 146.64000 879.84| REMOVE HEADWALLS FROM CULVERTS | | | 0027 4043.00 131.300 m | 15.00000 1969.50| 33.84000 4443.19| REMOVE CULVERT PIPE | | | 0028 4044.00 1.000 EACH| 1000.00000 1000.00| 1353.59000 1353.59| PREPARATION OF STRUCTURE AT STA. | | | 33+79.30 | | | 0029 4044.01 1.000 EACH| 1000.00000 1000.00| 2808.70000 2808.70| PREPARATION OF STRUCTURE AT STA. | | | 50+22.30 | | | 0030 4044.02 1.000 EACH| 700.00000 700.00| 789.59000 789.59| PREPARATION OF STRUCTURE AT STA. 75+23 | | | 0031 4044.03 1.000 EACH| 650.00000 650.00| 789.59000 789.59| PREPARATION OF STRUCTURE AT STA. | | | 89+71.20 | | | 0032 4044.04 1.000 EACH| 650.00000 650.00| 789.59000 789.59| PREPARATION OF STRUCTURE AT STA. | | | 102+33.60 | | | 0033 4044.05 1.000 EACH| 650.00000 650.00| 789.59000 789.59| PREPARATION OF STRUCTURE AT STA. | | | 120+72.30 | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 14 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(4) 2252 |(5) 2853 | |PAULSEN, INC. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0034 4044.06 1.000 EACH| 600.00000 600.00| 789.59000 789.59| PREPARATION OF STRUCTURE AT STA. | | | 129+66.90 | | | 0035 4050.01 563.000 m3 | 8.00000 4504.00| 11.28000 6350.64| EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,| | | AND HEADWALLS | | | 0036 4051.01 121.000 m3 | 9.00000 1089.00| 23.69000 2866.49| EXCAVATION FOR BOX CULVERTS | | | 0037 4101.06 90.275 m3 | 350.00000 31596.25| 415.12000 37474.96| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | 0038 4151.00 5002.000 kg | 1.50000 7503.00| 1.13000 5652.26| REINFORCING STEEL FOR BOX CULVERT | | | 0039 4310.24 26.000 EACH| 170.00000 4420.00| 200.78000 5220.28| 600 mm FLARED-END SECTION | | | 0040 4310.30 6.000 EACH| 245.00000 1470.00| 302.30000 1813.80| 750 mm FLARED-END SECTION | | | 0041 4310.36 10.000 EACH| 325.00000 3250.00| 444.43000 4444.30| 900 mm FLARED-END SECTION | | | 0042 4310.48 10.000 EACH| 700.00000 7000.00| 1084.00000 10840.00| 1200 mm FLARED-END SECTION | | | 0043 4310.60 2.000 EACH| 1100.00000 2200.00| 1822.84000 3645.68| 1500 mm FLARED-END SECTION | | | 0044 4320.30 2.000 EACH| 280.00000 560.00| 324.86000 649.72| 750 mm ROUND EQUIVALENT FLARED-END | | | SECTION | | | SECTION TOTALS | $ 108,997.85| $ 144,284.02| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 GROUP 4A CULVERT AT STA. 83+97.40 TWIN 3.0m X 1.8m X 15.2m CONCRETE BOX CULVERT | | | 0045 0030.40 LUMP| 1930.00000 1930.00| 3383.97000 3383.97| MOBILIZATION | | | 0046 4044.07 1.000 EACH| 1800.00000 1800.00| 3383.97000 3383.97| PREPARATION OF STRUCTURE AT STA. | | | 83+97.40 | | | 0047 4051.01 41.000 m3 | 9.00000 369.00| 23.69000 971.29| EXCAVATION FOR BOX CULVERTS | | | 0048 4101.06 46.000 m3 | 330.00000 15180.00| 415.10000 19094.60| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 15 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(4) 2252 |(5) 2853 | |PAULSEN, INC. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0049 4151.00 2683.000 kg | 1.50000 4024.50| 1.69000 4534.27| REINFORCING STEEL FOR BOX CULVERT | | | SECTION TOTALS | $ 23,303.50| $ 31,368.10| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0004 GROUP 4B CULVERT AT STA. 145+54.00 TWIN 3.0m X 2.4m X 18.5m CONCRETE BOX CULVERT | | | 0050 0030.40 LUMP| 1930.00000 1930.00| 3383.97000 3383.97| MOBILIZATION | | | 0051 4044.07 1.000 EACH| 2500.00000 2500.00| 3383.97000 3383.97| PREPARATION OF STRUCTURE AT STA. | | | 145+54.00 | | | 0052 4051.01 67.000 m3 | 9.00000 603.00| 23.69000 1587.23| EXCAVATION FOR BOX CULVERTS | | | 0053 4101.06 53.200 m3 | 330.00000 17556.00| 415.10000 22083.32| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | 0054 4151.00 3053.000 kg | 1.50000 4579.50| 1.69000 5159.57| REINFORCING STEEL FOR BOX CULVERT | | | SECTION TOTALS | $ 27,168.50| $ 35,598.06| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0005 GROUP 4C CULVERT AT STA. 171+56.40 TWIN 3.6m X 1.5m X 15.8m CONCRETE BOX CULVERT | | | 0055 0030.40 LUMP| 1930.00000 1930.00| 3383.97000 3383.97| MOBILIZATION | | | 0056 4044.07 1.000 EACH| 1990.00000 1990.00| 3383.97000 3383.97| PREPARATION OF STRUCTURE AT STA. | | | 171+56.40 | | | 0057 4051.01 60.000 m3 | 9.00000 540.00| 23.69000 1421.40| EXCAVATION FOR BOX CULVERTS | | | 0058 4101.06 53.000 m3 | 330.00000 17490.00| 415.10000 22000.30| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | 0059 4151.00 3442.000 kg | 1.50000 5163.00| 1.69000 5816.98| REINFORCING STEEL FOR BOX CULVERT | | | SECTION TOTALS | $ 27,113.00| $ 36,006.62| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0006 GROUP 5 SEEDING | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 16 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(4) 2252 |(5) 2853 | |PAULSEN, INC. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0060 L001.01 14.600 ha | 1200.00000 17520.00| 1353.59000 19762.41| SEEDING, TYPE A | | | 0061 L001.02 14.000 ha | 950.00000 13300.00| 1071.59000 15002.26| SEEDING, TYPE B | | | 0062 L032.75 143.000 Mg | 70.00000 10010.00| 78.96000 11291.28| MULCH | | | 0063 0030.50 LUMP| 1000.00000 1000.00| 1127.99000 1127.99| MOBILIZATION | | | SECTION TOTALS | $ 41,830.00| $ 47,183.94| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0007 GROUP 7 GUARDRAIL | | | 0064 0030.70 LUMP| 200.00000 200.00| 225.60000 225.60| MOBILIZATION | | | 0065 7015.00 700.000 m | 20.00000 14000.00| 22.56000 15792.00| CABLE GUARDRAIL | | | 0066 7023.00 2.000 EACH| 1200.00000 2400.00| 1353.59000 2707.18| TERMINAL ANCHORAGE SECTIONS | | | 0067 7024.00 1.000 EACH| 2400.00000 2400.00| 2707.18000 2707.18| INTERMEDIATE ANCHORAGE SECTIONS | | | SECTION TOTALS | $ 19,000.00| $ 21,431.96| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0008 GROUP 8B ELECTRICAL | | | 0068 A001.12 1.000 EACH| 400.00000 400.00| 451.20000 451.20| PULL BOX, TYPE PB-5 | | | 0069 A009.14 2.000 EACH| 1800.00000 3600.00| 2030.39000 4060.78| STREET LIGHTING UNIT, TYPE | | | SL-BT-12.2-3.7-0.25 | | | 0070 A020.10 1.000 EACH| 1350.00000 1350.00| 1522.79000 1522.79| LIGHTING CONTROL CENTER, TYPE D | | | 0071 A070.10 96.000 m | 7.50000 720.00| 8.46000 812.16| 38 mm CONDUIT IN TRENCH | | | 0072 A072.10 25.000 m | 10.00000 250.00| 11.28000 282.00| 38 mm CONDUIT UNDER ROADWAY | | | 0073 A080.22 121.000 m | 1.80000 217.80| 2.03000 245.63| STREET LIGHTING CABLE, NO. 6 BARE | | | 0074 A080.24 242.000 m | 2.00000 484.00| 2.26000 546.92| STREET LIGHTING CABLE, NO. 6 USE | | | 0075 0030.81 LUMP| 2047.00000 2047.00| 2309.00000 2309.00| MOBILIZATION | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 17 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(4) 2252 |(5) 2853 | |PAULSEN, INC. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION TOTALS | $ 9,068.80| $ 10,230.48| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0009 GROUP 9 BITUMINOUS | | | 0076 0002.55 592.680 StaM| 19.95000 11823.97| 22.00000 13038.96| OVERLAY BROKEN LINES | | | 0077 0002.60 1185.360 StaM| 19.55000 23173.79| 22.00000 26077.92| OVERLAY SOLID LINES | | | 0078 0030.90 LUMP| 41000.00000 41000.00| 128500.00000 128500.00| MOBILIZATION | | | 0079 1020.02 74.000 EACH| 16.40000 1213.60| 23.35000 1727.90| DELINEATOR, TYPE II | | | 0080 1020.03 23.000 EACH| 16.40000 377.20| 23.35000 537.05| DELINEATOR, TYPE III | | | 0081 1020.20 8.000 EACH| 24.10000 192.80| 30.12000 240.96| INSTALL CHEVRONS | | | 0082 2001.00 230.000 m3 | 18.10000 4163.00| 24.30000 5589.00| GRAVEL SURFACE COURSE | | | 0083 2021.00 3.000 EACH| 50.00000 150.00| 56.40000 169.20| MAILBOX POST | | | 0084 3012.04 128.000 m | 81.60000 10444.80| 84.04000 10757.12| CONCRETE 47B-25 MEDIAN CURB | | | 0085 3013.15 63.800 m | 82.60000 5269.88| 85.11000 5430.02| CONCRETE CLASS 47B-25 BARRIER CURB | | | 0086 3014.11 494.000 m | 75.45000 37272.30| 77.72000 38393.68| COMBINATION CONCRETE CLASS 47B-25 CURB | | | AND GUTTER | | | 0087 3017.39 265.000 m2 | 42.65000 11302.25| 43.94000 11644.10| CONCRETE CLASS 47B-20 MEDIAN SURFACING | | | 0088 3019.24 1.000 EACH| 710.00000 710.00| 733.19000 733.19| CONCRETE CLASS 47B-25 ISLAND NOSE | | | 0089 3020.24 226.000 m2 | 40.20000 9085.20| 41.40000 9356.40| CONCRETE CLASS 47B-25 DRIVEWAY | | | 0090 3075.32 503.000 m2 | 43.40000 21830.20| 44.72000 22494.16| 205 mm CONCRETE PAVEMENT, CLASS 47B-25 | | | 0091 4003.00 265.000 kg | 5.65000 1497.25| 3.00000 795.00| CAST IRON COVER, FRAME, AND FLANGE | | | 0092 4015.00 2.000 EACH| 500.00000 1000.00| 479.40000 958.80| ADJUST MANHOLE TO GRADE | | | 0093 7502.04 800.000 m | 7.70000 6160.00| 7.52000 6016.00| 100 mm WHITE PREFORMED PAVEMENT MARKING,| | | TYPE 4 | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 18 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(4) 2252 |(5) 2853 | |PAULSEN, INC. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0094 7503.04 1100.000 m | 8.00000 8800.00| 7.81000 8591.00| 100 mm YELLOW PREFORMED PAVEMENT | | | MARKING, TYPE 4 | | | 0095 7508.04 75.000 m | 24.10000 1807.50| 22.56000 1692.00| 300 mm WHITE PREFORMED PAVEMENT MARKING,| | | TYPE 4 | | | 0096 7509.04 650.000 m | 25.20000 16380.00| 23.69000 15398.50| 300 mm YELLOW PREFORMED PAVEMENT | | | MARKING, TYPE 4 | | | 0097 7512.04 42.000 m | 48.20000 2024.40| 45.12000 1895.04| 600 mm WHITE PREFORMED PAVEMENT MARKING,| | | TYPE 4 | | | 0098 8111.00 366.816 StaM| 188.65000 69199.84| 148.22000 54369.47| SHOULDER SUBGRADE PREPARATION | | | 0099 9000.73 500.000 Mg | 13.02000 6510.00| 17.22000 8610.00| ASPHALTIC CONCRETE FOR STATE | | | MAINTENANCE PATCHING, TYPE SPS | | | 0100 9005.00 250.000 Mg | 30.25000 7562.50| 37.53000 9382.50| ASPHALTIC CONCRETE FOR PATCHING, TYPE | | | SP4 | | | 0101 9005.23 36350.000 Mg | 13.02000 473277.00| 15.47000 562334.50| ASPHALTIC CONCRETE, TYPE SPS | | | 0102 9005.45 50910.000 Mg | 25.25000 1285477.50| 28.50000 1450935.00| ASPHALTIC CONCRETE, TYPE SP4(12.5) | | | 0103 9009.00 11096.000 m2 | 2.10000 23301.60| 5.14000 57033.44| PLACEMENT OF ASPHALTIC CONCRETE FOR | | | DRIVEWAYS AND INTERSECTIONS | | | 0104 9020.92 27.000 Mg | 172.40000 4654.80| 160.00000 4320.00| PERFORMANCE GRADED BINDER (58-28) FOR | | | STATE MAINTENANCE PATCHING | | | 0105 9021.01 2762.640 Mg | 172.40000 476279.14| 160.00000 442022.40| PERFORMANCE GRADED BINDER (64-22) | | | 0106 9021.03 1962.900 Mg | 172.40000 338403.96| 160.00000 314064.00| PERFORMANCE GRADED BINDER (58-28) | | | 0107 9034.00 11096.000 m2 | 2.45000 27185.20| 1.59000 17642.64| PREPARATION OF INTERSECTIONS AND | | | DRIVEWAYS | | | 0108 9053.00 166050.000 L | 0.22000 36531.00| 0.12000 19926.00| TACK COAT | | | 0109 9111.00 2300.000 kL | 2.55000 5865.00| 2.73000 6279.00| WATER | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 19 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(4) 2252 |(5) 2853 | |PAULSEN, INC. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0110 9140.00 6.273 StaM| 175.25000 1099.34| 261.39000 1639.70| JOINT SEALING - ASPHALT TO CONCRETE | | | 0111 9170.00 28.298 StaM| 136.60000 3865.51| 228.87000 6476.56| EARTH SHOULDER CONSTRUCTION | | | 0112 9173.20 1004.000 m2 | 2.50000 2510.00| 2.41000 2419.64| SUBGRADE PREPARATION | | | 0113 9179.23 212.317 StaM| 456.00000 96816.55| 470.36000 99865.42| COLD MILLING, CLASS 3 | | | 0114 9188.50 1260.000 m2 | 23.90000 30114.00| 12.59000 15863.40| SURFACING UNDER GUARDRAIL | | | 0115 9300.50 19.770 LS | 4300.00000 4300.00| 1815.41000 1815.41| ASPHALT PAVEMENT SMOOTHNESS TESTING | | | SECTION TOTALS | $ 3,108,631.08| $ 3,385,035.08| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0010 GROUP 10 GENERAL ITEMS | | | 0116 0001.08 22000.000 BDAY| 0.50000 11000.00| 0.50000 11000.00| BARRICADE, TYPE II | | | 0117 0001.10 1952.000 BDAY| 3.65000 7124.80| 2.26000 4411.52| BARRICADE, TYPE III | | | 0118 0001.30 976.000 LDAY| 4.55000 4440.80| 1.13000 1102.88| TYPE B HIGH INTENSITY WARNING LIGHT | | | 0119 0001.75 2295.000 EACH| 6.45000 14802.75| 4.51000 10350.45| TEMPORARY SIGN DAY | | | 0120 0001.90 30256.000 EACH| 0.60000 18153.60| 0.68000 20574.08| SIGN DAY | | | 0121 0003.10 200.000 DAY | 168.40000 33680.00| 187.99000 37598.00| FLAGGING | | | 0122 0003.20 50.000 DAY | 276.50000 13825.00| 241.24000 12062.00| FURNISHING AND OPERATING PILOT VEHICLE | | | 0123 0010.04 1.000 EACH| 2750.00000 2750.00| 2255.98000 2255.98| FIELD OFFICE | | | 0124 0030.10 LUMP| 4700.00000 4700.00| 5639.95000 5639.95| MOBILIZATION | | | 0125 1017.00 19.750 LS | 36965.00000 36965.00| 37223.69000 37223.69| CONSTRUCTION STAKING AND SURVEYING | | | 0126 9110.01 200.000 HOUR| 49.00000 9800.00| 65.64000 13128.00| RENTAL OF LOADER, FULLY OPERATED | | | 0127 9110.02 60.000 HOUR| 49.00000 2940.00| 59.24000 3554.40| RENTAL OF MOTOR GRADER, FULLY OPERATED | | | NEBRASKA DEPARTMENT OF ROADS DATE : 02/08/02 PAGE : 20 TABULATION OF BIDS CALL ORDER : F27 CONTRACT ID : 6937 COUNTIES : CUSTER LETTING DATE : 02/07/02 1:30 PM DISTRICT : 6 PROJECT(S) : EACNH-2-3(116) ==================================================================================================================================== |(4) 2252 |(5) 2853 | |PAULSEN, INC. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0128 9110.03 200.000 HOUR| 44.00000 8800.00| 47.44000 9488.00| RENTAL OF DUMP TRUCK, FULLY OPERATED | | | 0129 9110.07 200.000 HOUR| 35.00000 7000.00| 46.92000 9384.00| RENTAL OF SKID LOADER, FULLY OPERATED | | | SECTION TOTALS | $ 175,981.95| $ 177,772.95| ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 4,143,761.05| $ 4,518,225.51| ====================================================================================================================================