Contract Letting March 14, 2002 |
NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 2 VENDOR RANKING CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) CONTRACT DESCRIPTION : US-30, BLAIR TO KENNARD. -------------------------------------------------------------------------------------------------------------------------- VENDOR NO. BID NOTES -------------------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID -------------------------------------------------------------------------------------------------------------------------- 1 1661 U.S. ASPHALT CO. $ 4,044,412.71 100.0000% 2 0049 HAWKINS CONSTRUCTION COMPANY $ 4,219,052.30 104.3180% NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 3 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 GROUP 1 GRADING | | | 0001 L006.00 4.000 ha | 172.65000 690.60| 229.00000 916.00| COVER CROP SEEDING | | | 0002 L020.00 2197.000 m2 | 1.57000 3449.29| 1.84000 4042.48| EROSION CONTROL | | | 0003 L020.01 450.000 m2 | 4.93000 2218.50| 5.73000 2578.50| EROSION CONTROL, TYPE A | | | 0004 L020.08 3786.000 m2 | 4.82000 18248.52| 5.73000 21693.78| EROSION CONTROL, TYPE AA | | | 0005 L021.01 35.000 BALE| 15.23000 533.05| 14.91000 521.85| EROSION CHECKS, TYPE A | | | 0006 L021.21 224.000 BALE| 15.23000 3411.52| 14.91000 3339.84| EROSION CHECKS, TYPE AA | | | 0007 L022.11 565.000 m | 2.54000 1435.10| 7.52000 4248.80| FABRIC SILT FENCE-LOW POROSITY | | | 0008 L022.75 255.000 m | 22.34000 5696.70| 17.20000 4386.00| TEMPORARY SILT CHECK | | | 0009 0030.10 LUMP| 9952.79000 9952.79| 11239.00000 11239.00| MOBILIZATION | | | 0010 1009.00 LUMP| 4874.84000 4874.84| 5505.00000 5505.00| GENERAL CLEARING AND GRUBBING | | | 0011 1010.00 21044.000 m3 | 3.05000 64184.20| 3.44000 72391.36| EXCAVATION | | | 0012 1011.00 440.000 kL | 2.03000 893.20| 2.29000 1007.60| WATER | | | 0013 1043.50 36.000 m2 | 5.08000 182.88| 5.73000 206.28| RIPRAP FILTER FABRIC | | | 0014 1090.00 1.000 EACH| 1523.39000 1523.39| 1720.00000 1720.00| ABANDON WELLS | | | 0015 1101.00 1408.100 m2 | 4.27000 6012.59| 5.52000 7772.71| REMOVE PAVEMENT | | | 0016 1102.00 4663.400 m2 | 3.55000 16555.07| 4.08000 19026.67| REMOVE ASPHALT SURFACE | | | 0017 1109.00 410.000 m | 9.14000 3747.40| 18.41000 7548.10| REMOVE CURB | | | 0018 1122.01 501.000 m2 | 4.98000 2494.98| 5.62000 2815.62| REMOVE CONCRETE MEDIAN SURFACING | | | 0019 1122.30 2.000 EACH| 203.12000 406.24| 229.00000 458.00| REMOVE ISLAND NOSE | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 4 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0020 1124.00 1.000 EACH| 507.80000 507.80| 573.00000 573.00| REMOVE BUILDING AT STA. 400+75 RT. | | | 0021 1124.01 1.000 EACH| 507.80000 507.80| 573.00000 573.00| REMOVE BUILDING AT STA. 401+00 RT. | | | 0022 1124.02 1.000 EACH| 507.80000 507.80| 573.00000 573.00| REMOVE BUILDING AT STA. 401+10 RT. | | | 0023 1125.00 1.000 EACH| 3046.77000 3046.77| 3441.00000 3441.00| CLEAR TRACT AT STA. 400+25 TO STA. | | | 401+25 RT. | | | 0024 1701.30 48.000 m | 91.40000 4387.20| 103.22000 4954.56| 750 mm DRIVEWAY CULVERT PIPE, TYPE 2,3, | | | 4,5,6,7 OR 8 | | | 0025 1701.36 27.000 m | 101.56000 2742.12| 114.69000 3096.63| 900 mm DRIVEWAY CULVERT PIPE, TYPE 2,3, | | | 4,5,6,7 OR 8 | | | 0026 1705.42 16.000 m | 152.34000 2437.44| 172.03000 2752.48| 1050 mm ROUND EQUIVALENT DRIVEWAY | | | CULVERT PIPE, TYPE 2,3,4 OR 5 | | | 0027 6040.00 1.000 EACH| 1015.59000 1015.59| 1147.00000 1147.00| REMOVE STRUCTURE AT STA. 47+15.21 RT. | | | 0028 6040.01 1.000 EACH| 1015.59000 1015.59| 1147.00000 1147.00| REMOVE STRUCTURE AT STA. 51+92.29 RT. | | | 0029 6040.02 1.000 EACH| 1015.59000 1015.59| 1147.00000 1147.00| REMOVE STRUCTURE AT STA. 54+18.65 RT. | | | 0030 6105.02 50.000 Mg | 15.23000 761.50| 33.26000 1663.00| ROCK RIPRAP, TYPE B | | | 0031 7017.00 1492.110 m | 3.33000 4968.73| 3.76000 5610.33| REMOVE GUARDRAIL | | | SECTION TOTALS | $ 169,424.79| $ 198,095.59| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 GROUP 4 CULVERTS | | | 0032 P120.24 7.500 m | 194.99000 1462.43| 155.00000 1162.50| 600 mm CULVERT PIPE, TYPE 2 | | | 0033 P120.30 14.000 m | 215.31000 3014.34| 178.05000 2492.70| 750 mm CULVERT PIPE, TYPE 2 | | | 0034 P120.36 6.000 m | 306.71000 1840.26| 272.00000 1632.00| 900 mm CULVERT PIPE, TYPE 2 | | | 0035 P120.48 11.500 m | 385.92000 4438.08| 348.65000 4009.48| 1200 mm CULVERT PIPE, TYPE 2 | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 5 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0036 P310.54 19.000 m | 431.63000 8200.97| 284.54000 5406.26| 1350 mm CULVERT PIPE, TYPE 2,4 OR 5 | | | 0037 P500.24 12.000 m | 203.12000 2437.44| 139.46000 1673.52| 600 mm CULVERT PIPE, TYPE 2,4,5,7 OR 8 | | | 0038 P500.36 29.200 m | 324.99000 9489.71| 211.83000 6185.44| 900 mm CULVERT PIPE, TYPE 2,4,5,7 OR 8 | | | 0039 0030.40 LUMP| 18788.43000 18788.43| 6308.00000 6308.00| MOBILIZATION | | | 0040 4035.00 6.000 EACH| 106.64000 639.84| 161.00000 966.00| REMOVE FLARED-END SECTION | | | 0041 4040.00 4.000 EACH| 168.59000 674.36| 229.00000 916.00| REMOVE HEADWALLS FROM CULVERTS | | | 0042 4044.00 1.000 EACH| 1809.78000 1809.78| 2753.00000 2753.00| PREPARATION OF STRUCTURE AT STA. 80+80 | | | 0043 4045.00 1.000 EACH| 3046.77000 3046.77| 4582.00000 4582.00| REMOVE STRUCTURE AT STA. 500+17.7 | | | 0044 4050.01 648.000 m3 | 10.16000 6583.68| 10.32000 6687.36| EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,| | | AND HEADWALLS | | | 0045 4051.01 125.000 m3 | 12.69000 1586.25| 25.23000 3153.75| EXCAVATION FOR BOX CULVERTS | | | 0046 4100.06 2.200 m3 | 868.33000 1910.33| 522.00000 1148.40| CLASS 47B-20 OR AX-20 CONCRETE FOR | | | HEADWALL | | | 0047 4101.06 75.390 m3 | 487.48000 36751.12| 436.96000 32942.41| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | 0048 4107.07 5.150 m3 | 812.47000 4184.22| 275.00000 1416.25| CLASS 47B-20 OR AX-20 CONCRETE FOR | | | CONCRETE COLLARS | | | 0049 4150.00 192.000 kg | 2.89000 554.88| 2.47000 474.24| REINFORCING STEEL FOR HEADWALL | | | 0050 4151.00 4425.000 kg | 1.73000 7655.25| 1.36000 6018.00| REINFORCING STEEL FOR BOX CULVERT | | | 0051 4157.00 214.000 kg | 2.64000 564.96| 1.72000 368.08| REINFORCING STEEL FOR COLLARS | | | 0052 4310.24 5.000 EACH| 563.65000 2818.25| 407.00000 2035.00| 600 mm FLARED-END SECTION | | | 0053 4310.30 1.000 EACH| 873.41000 873.41| 447.00000 447.00| 750 mm FLARED-END SECTION | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 6 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0054 4310.36 4.000 EACH| 822.63000 3290.52| 556.00000 2224.00| 900 mm FLARED-END SECTION | | | 0055 4310.54 2.000 EACH| 1487.84000 2975.68| 1475.00000 2950.00| 1350 mm FLARED-END SECTION | | | SECTION TOTALS | $ 125,590.96| $ 97,951.39| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 GROUP 4A CONCRETE BOX CULVERT AT STA. 70+29 TRIPLE 3.3m x 3.9m x 33.5m CONCRETE BOX CULVERT | | | 0056 0030.40 LUMP| 20311.81000 20311.81| 25734.00000 25734.00| MOBILIZATION | | | 0057 1102.00 994.000 m2 | 2.43000 2415.42| 9.94000 9880.36| REMOVE ASPHALT SURFACE | | | 0058 2020.50 327.000 m2 | 67.02000 21915.54| 31.91000 10434.57| SURFACING | | | 0059 4045.00 1.000 EACH| 27360.01000 27360.01| 30897.00000 30897.00| REMOVE STRUCTURE AT STA. 70+29 | | | 0060 4051.01 250.000 m3 | 20.31000 5077.50| 22.94000 5735.00| EXCAVATION FOR BOX CULVERTS | | | 0061 4054.65 LUMP| 76169.30000 76169.30| 86016.00000 86016.00| TEMPORARY SHORING | | | 0062 4101.06 389.050 m3 | 340.22000 132362.59| 384.21000 149476.90| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | 0063 4151.00 24694.000 kg | 1.32000 32596.08| 1.49000 36794.06| REINFORCING STEEL FOR BOX CULVERT | | | 0064 9009.75 623.000 m2 | 34.73000 21636.79| 31.66000 19724.18| TEMPORARY SURFACING | | | SECTION TOTALS | $ 339,845.04| $ 374,692.07| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0004 GROUP 4B CONCRETE BOX CULVERT AT STA. 500+28 TWIN 3.0m x 1.5m x 28.0m CONCRETE BOX CULVERT | | | 0065 0030.40 LUMP| 4062.36000 4062.36| 4588.00000 4588.00| MOBILIZATION | | | 0066 4051.01 1460.000 m3 | 12.19000 17797.40| 13.76000 20089.60| EXCAVATION FOR BOX CULVERTS | | | 0067 4101.06 127.600 m3 | 330.07000 42116.93| 372.74000 47561.62| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 7 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0068 4151.00 7959.000 kg | 1.42000 11301.78| 1.61000 12813.99| REINFORCING STEEL FOR BOX CULVERT | | | SECTION TOTALS | $ 75,278.47| $ 85,053.21| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0005 GROUP 6 BRIDGE AT STA. 22+73.609 24.384M SIMPLE SPAN PRESTRESS GIRD BR(TYPE III)WIDEN& REDECK | | | 0069 0020.00 500.000 HOUR| 0.80000 400.00| 0.80000 400.00| TRAINING | | | 0070 0030.60 LUMP| 40742.45000 40742.45| 38003.00000 38003.00| MOBILIZATION | | | 0071 1010.01 1430.000 m3 | 4.81000 6878.30| 4.49000 6420.70| EXCAVATION (ESTABLISHED QUANTITY) | | | 0072 1043.50 1029.000 m2 | 1.61000 1656.69| 1.50000 1543.50| RIPRAP FILTER FABRIC | | | 0073 3050.15 141.300 m3 | 228.92000 32346.40| 212.69000 30053.10| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-30 | | | 0074 3051.10 9233.000 kg | 1.53000 14126.49| 1.41000 13018.53| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0075 6000.10 113.000 LS | 2179.46000 2179.46| 2032.00000 2032.00| ABUTMENT NO.1 EXCAVATION | | | 0076 6000.11 113.000 LS | 2179.46000 2179.46| 2032.00000 2032.00| ABUTMENT NO.2 EXCAVATION | | | 0077 6005.60 16.000 EACH| 216.90000 3470.40| 200.16000 3202.56| ELASTOMERIC BEARING | | | 0078 6010.22 46.700 m3 | 365.41000 17064.65| 339.98000 15877.07| CLASS 47B-20 CONCRETE FOR BRIDGE | | | 0079 6010.26 101.900 m3 | 423.76000 43181.14| 394.39000 40188.34| CLASS 47BD-30 CONCRETE FOR BRIDGE | | | 0080 6011.11 17.800 LS | 42011.94000 42011.94| 38743.00000 38743.00| PRECAST/PRESTRESSED CONCRETE | | | SUPERSTRUCTURE AT STA. 22+73.609 | | | 0081 6030.00 1.000 EACH| 111350.38000 111350.38| 103954.00000 103954.00| PREPARATION OF BRIDGE AT STA. 22+73.609 | | | 0082 6081.00 31.000 kg | 12.45000 385.95| 11.57000 358.67| STRUCTURAL STEEL FOR SUPERSTRUCTURE | | | 0083 6105.02 988.000 Mg | 23.39000 23109.32| 21.61000 21350.68| ROCK RIPRAP, TYPE B | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 8 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0084 6131.50 14133.000 kg | 1.54000 21764.82| 1.42000 20068.86| EPOXY COATED REINFORCING STEEL | | | 0085 6139.50 50.600 m2 | 25.69000 1299.91| 23.85000 1206.81| SUBSURFACE DRAINAGE MATTING | | | 0086 6210.50 468.600 m | 72.00000 33739.20| 66.62000 31218.13| PIPE PILING | | | 0087 6510.55 24.640 LS | 3096.54000 3096.54| 2872.00000 2872.00| TEMPORARY BRIDGE SHORING | | | 0088 6616.65 12.000 EACH| 445.75000 5349.00| 413.93000 4967.16| BEARING DEVICE REPLACEMENT | | | 0089 8091.00 155.300 m3 | 17.64000 2739.49| 16.26000 2525.18| GRANULAR BACKFILL | | | SECTION TOTALS | $ 409,071.99| $ 380,035.29| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0006 GROUP 6A BRIDGE AT STA. 35+42.651 42.672M 3 SPAN PRESTRESS GIRDER BR (TYPE II) WIDEN & REDECK | | | 0090 0020.00 500.000 HOUR| 0.80000 400.00| 0.80000 400.00| TRAINING | | | 0091 0030.60 LUMP| 48957.57000 48957.57| 45489.00000 45489.00| MOBILIZATION | | | 0092 1010.01 2365.000 m3 | 4.81000 11375.65| 4.49000 10618.85| EXCAVATION (ESTABLISHED QUANTITY) | | | 0093 1043.50 1102.000 m2 | 1.61000 1774.22| 1.50000 1653.00| RIPRAP FILTER FABRIC | | | 0094 3050.15 141.600 m3 | 229.43000 32487.29| 213.15000 30182.04| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-30 | | | 0095 3051.10 9303.000 kg | 1.53000 14233.59| 1.41000 13117.23| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0096 6000.10 113.000 LS | 1922.51000 1922.51| 1793.00000 1793.00| ABUTMENT NO.1 EXCAVATION | | | 0097 6000.11 113.000 LS | 1922.51000 1922.51| 1793.00000 1793.00| ABUTMENT NO.2 EXCAVATION | | | 0098 6000.20 61.000 LS | 9618.66000 9618.66| 8969.00000 8969.00| PIER NO.1 EXCAVATION | | | 0099 6000.21 45.000 LS | 5836.60000 5836.60| 5444.00000 5444.00| PIER NO.2 EXCAVATION | | | 0100 6005.35 29.800 m | 128.32000 3823.94| 118.52000 3531.90| PRECOMPRESSED POLYURETHANE FOAM JOINT | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 9 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0101 6005.60 22.000 EACH| 122.97000 2705.34| 113.57000 2498.54| ELASTOMERIC BEARING | | | 0102 6010.22 100.200 m3 | 423.27000 42411.65| 393.75000 39453.75| CLASS 47B-20 CONCRETE FOR BRIDGE | | | 0103 6010.26 162.900 m3 | 428.22000 69757.04| 398.55000 64923.80| CLASS 47BD-30 CONCRETE FOR BRIDGE | | | 0104 6011.11 20.300 LS | 34089.32000 34089.32| 31441.00000 31441.00| PRECAST/PRESTRESSED CONCRETE | | | SUPERSTRUCTURE AT STA. 35+42.651 | | | 0105 6030.00 1.000 EACH| 84786.59000 84786.59| 79344.00000 79344.00| PREPARATION OF BRIDGE AT STA. 35+42.651 | | | 0106 6080.00 564.000 kg | 5.66000 3192.24| 5.24000 2955.36| STRUCTURAL STEEL FOR SUBSTRUCTURE | | | 0107 6081.00 94.000 kg | 12.47000 1172.18| 11.60000 1090.40| STRUCTURAL STEEL FOR SUPERSTRUCTURE | | | 0108 6105.02 1058.000 Mg | 23.39000 24746.62| 21.61000 22863.38| ROCK RIPRAP, TYPE B | | | 0109 6131.50 24171.000 kg | 1.53000 36981.63| 1.42000 34322.82| EPOXY COATED REINFORCING STEEL | | | 0110 6139.50 48.600 m2 | 23.82000 1157.65| 22.12000 1075.03| SUBSURFACE DRAINAGE MATTING | | | 0111 6200.00 594.000 m | 80.75000 47965.50| 74.69000 44365.86| CONCRETE PILING | | | 0112 6510.55 25.560 LS | 3178.80000 3178.80| 2949.00000 2949.00| TEMPORARY BRIDGE SHORING | | | 0113 6616.65 10.000 EACH| 483.42000 4834.20| 448.00000 4480.00| BEARING DEVICE REPLACEMENT | | | 0114 8091.00 137.800 m3 | 17.64000 2430.79| 16.26000 2240.63| GRANULAR BACKFILL | | | SECTION TOTALS | $ 491,762.09| $ 456,994.59| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0007 GROUP 6B BRIDGE AT STA. 43+91.371 42.672M 3 SPAN PRESTRESS GIRDER BR TYPE II WIDEN & REDECK | | | 0115 0020.00 500.000 HOUR| 0.80000 400.00| 0.80000 400.00| TRAINING | | | 0116 0030.60 LUMP| 49530.36000 49530.36| 46407.00000 46407.00| MOBILIZATION | | | 0117 1010.01 2385.000 m3 | 4.81000 11471.85| 4.49000 10708.65| EXCAVATION (ESTABLISHED QUANTITY) | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 10 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0118 1043.50 1230.000 m2 | 1.61000 1980.30| 1.50000 1845.00| RIPRAP FILTER FABRIC | | | 0119 3050.15 141.500 m3 | 229.59000 32486.99| 213.30000 30181.95| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-30 | | | 0120 3051.10 9303.000 kg | 1.53000 14233.59| 1.41000 13117.23| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0121 6000.10 115.000 LS | 1966.18000 1966.18| 1832.00000 1832.00| ABUTMENT NO.1 EXCAVATION | | | 0122 6000.11 115.000 LS | 1966.18000 1966.18| 1832.00000 1832.00| ABUTMENT NO.2 EXCAVATION | | | 0123 6000.60 15.000 LS | 4014.63000 4014.63| 3749.00000 3749.00| PIER NO.1 EXCAVATION | | | 0124 6000.61 20.000 LS | 10201.61000 10201.61| 9516.00000 9516.00| PIER NO.2 EXCAVATION | | | 0125 6005.35 29.800 m | 128.32000 3823.94| 118.52000 3531.90| PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0126 6005.60 22.000 EACH| 122.97000 2705.34| 113.57000 2498.54| ELASTOMERIC BEARING | | | 0127 6010.22 109.800 m3 | 431.41000 47368.82| 401.32000 44064.94| CLASS 47B-20 CONCRETE FOR BRIDGE | | | 0128 6010.26 169.500 m3 | 477.71000 80971.85| 444.78000 75390.21| CLASS 47BD-30 CONCRETE FOR BRIDGE | | | 0129 6011.11 20.300 LS | 34089.32000 34089.32| 31441.00000 31441.00| PRECAST/PRESTRESSED CONCRETE | | | SUPERSTRUCTURE AT STA. 43+91.371 | | | 0130 6030.00 1.000 EACH| 78969.29000 78969.29| 73501.00000 73501.00| PREPARATION OF BRIDGE AT STA. 43+91.371 | | | 0131 6080.00 652.000 kg | 5.66000 3690.32| 5.24000 3416.48| STRUCTURAL STEEL FOR SUBSTRUCTURE | | | 0132 6081.00 94.000 kg | 12.47000 1172.18| 11.60000 1090.40| STRUCTURAL STEEL FOR SUPERSTRUCTURE | | | 0133 6105.02 1017.000 Mg | 23.39000 23787.63| 21.61000 21977.37| ROCK RIPRAP, TYPE B | | | 0134 6105.03 164.000 Mg | 25.82000 4234.48| 23.85000 3911.40| ROCK RIPRAP, TYPE C | | | 0135 6131.50 24501.000 kg | 1.53000 37486.53| 1.42000 34791.42| EPOXY COATED REINFORCING STEEL | | | 0136 6139.50 49.600 m2 | 24.20000 1200.32| 22.48000 1115.01| SUBSURFACE DRAINAGE MATTING | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 11 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0137 6200.00 561.000 m | 80.76000 45306.36| 74.70000 41906.70| CONCRETE PILING | | | 0138 6510.55 8.000 LS | 3178.80000 3178.80| 2949.00000 2949.00| TEMPORARY BRIDGE SHORING | | | 0139 6616.65 10.000 EACH| 483.42000 4834.20| 448.00000 4480.00| BEARING DEVICE REPLACEMENT | | | 0140 8091.00 140.100 m3 | 17.66000 2474.17| 16.28000 2280.83| GRANULAR BACKFILL | | | SECTION TOTALS | $ 503,545.24| $ 467,935.03| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0008 GROUP 6C BRIDGE AT STA. 61+83.515 33.528M 3 SPAN PRESTRESSED GIRDER BR TYPE II WIDEN & REDECK | | | 0141 0020.00 500.000 HOUR| 0.80000 400.00| 0.80000 400.00| TRAINING | | | 0142 0030.60 LUMP| 44120.31000 44120.31| 41463.00000 41463.00| MOBILIZATION | | | 0143 1010.01 1340.000 m3 | 4.81000 6445.40| 4.49000 6016.60| EXCAVATION (ESTABLISHED QUANTITY) | | | 0144 1043.50 718.000 m2 | 1.61000 1155.98| 1.50000 1077.00| RIPRAP FILTER FABRIC | | | 0145 3050.15 141.400 m3 | 229.31000 32424.43| 213.05000 30125.27| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-30 | | | 0146 3051.10 9265.000 kg | 1.53000 14175.45| 1.41000 13063.65| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0147 6000.10 113.700 LS | 1966.18000 1966.18| 1832.00000 1832.00| ABUTMENT NO.1 EXCAVATION | | | 0148 6000.11 113.700 LS | 1966.18000 1966.18| 1832.00000 1832.00| ABUTMENT NO.2 EXCAVATION | | | 0149 6000.60 47.200 LS | 8507.60000 8507.60| 7934.00000 7934.00| PIER NO.1 EXCAVATION | | | 0150 6000.61 85.400 LS | 8507.60000 8507.60| 7934.00000 7934.00| PIER NO.2 EXCAVATION | | | 0151 6005.35 28.990 m | 131.36000 3808.13| 121.32000 3517.07| PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0152 6005.60 22.000 EACH| 122.97000 2705.34| 113.57000 2498.54| ELASTOMERIC BEARING | | | 0153 6010.22 131.000 m3 | 403.05000 52799.55| 374.89000 49110.59| CLASS 47B-20 CONCRETE FOR BRIDGE | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 12 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0154 6010.26 132.800 m3 | 478.12000 63494.34| 445.15000 59115.92| CLASS 47BD-30 CONCRETE FOR BRIDGE | | | 0155 6011.11 16.000 LS | 25442.58000 25442.58| 23466.00000 23466.00| PRECAST/PRESTRESSED CONCRETE | | | SUPERSTRUCTURE AT STA. 61+83.515 | | | 0156 6030.00 1.000 EACH| 68645.81000 68645.81| 63759.00000 63759.00| PREPARATION OF BRIDGE AT STA. 61+83.515 | | | 0157 6105.02 620.000 Mg | 23.41000 14514.20| 21.63000 13410.60| ROCK RIPRAP, TYPE B | | | 0158 6105.03 68.000 Mg | 25.81000 1755.08| 23.84000 1621.12| ROCK RIPRAP, TYPE C | | | 0159 6131.50 21773.000 kg | 1.53000 33312.69| 1.42000 30917.66| EPOXY COATED REINFORCING STEEL | | | 0160 6139.50 47.000 m2 | 24.23000 1138.81| 22.51000 1057.97| SUBSURFACE DRAINAGE MATTING | | | 0161 6210.50 753.000 m | 71.63000 53937.39| 66.28000 49908.84| PIPE PILING | | | 0162 6510.55 8.000 LS | 1119.18000 1119.18| 1037.00000 1037.00| TEMPORARY BRIDGE SHORING | | | 0163 6616.65 10.000 EACH| 483.42000 4834.20| 448.00000 4480.00| BEARING DEVICE REPLACEMENT | | | 0164 8091.00 140.500 m3 | 19.63000 2758.02| 18.10000 2543.05| GRANULAR BACKFILL | | | SECTION TOTALS | $ 449,934.45| $ 418,120.88| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0009 GROUP 7 GUARDRAIL | | | 0165 0030.70 LUMP| 712.53000 712.53| 805.00000 805.00| MOBILIZATION | | | 0166 7001.50 4.000 EACH| 355.46000 1421.84| 401.00000 1604.00| CULVERT MOUNTED GUARDRAIL POST | | | 0167 7011.20 474.360 m | 34.33000 16284.78| 38.76000 18386.19| W-BEAM GUARDRAIL | | | 0168 7015.00 425.000 m | 18.28000 7769.00| 20.64000 8772.00| CABLE GUARDRAIL | | | 0169 7019.50 1.000 EACH| 19804.02000 19804.02| 22364.00000 22364.00| IMPACT ATTENUATOR | | | 0170 7020.00 15.000 EACH| 1167.93000 17518.95| 1318.92000 19783.80| BRIDGE APPROACH SECTIONS | | | 0171 7023.00 4.000 EACH| 1066.37000 4265.48| 1204.00000 4816.00| TERMINAL ANCHORAGE SECTIONS | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 13 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0172 7024.27 25.000 EACH| 1447.22000 36180.50| 1634.31000 40857.75| GUARDRAIL END TREATMENT, TYPE II | | | SECTION TOTALS | $ 103,957.10| $ 117,388.74| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0010 GROUP 8B ELECTRICAL | | | 0173 A001.12 2.000 EACH| 406.24000 812.48| 344.00000 688.00| PULL BOX, TYPE PB-5 | | | 0174 A009.16 4.000 EACH| 1828.06000 7312.24| 2285.00000 9140.00| STREET LIGHTING UNIT, TYPE | | | SL-BT-12.2-3.7-0.20 | | | 0175 A020.10 1.000 EACH| 1371.05000 1371.05| 1376.00000 1376.00| LIGHTING CONTROL CENTER, TYPE D | | | 0176 A070.10 146.000 m | 12.19000 1779.74| 6.88000 1004.48| 38 mm CONDUIT IN TRENCH | | | 0177 A074.12 42.000 m | 55.86000 2346.12| 51.61000 2167.62| 38 mm CONDUIT, JACKED | | | 0178 A080.22 188.000 m | 1.83000 344.04| 1.72000 323.36| STREET LIGHTING CABLE, NO. 6 BARE | | | 0179 A080.24 376.000 m | 2.03000 763.28| 3.44000 1293.44| STREET LIGHTING CABLE, NO. 6 USE | | | 0180 0030.81 LUMP| 2088.05000 2088.05| 1474.00000 1474.00| MOBILIZATION | | | SECTION TOTALS | $ 16,817.00| $ 17,466.90| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0011 GROUP 9 BITUMINOUS | | | 0181 L001.01 3.000 ha | 1638.15000 4914.45| 1938.00000 5814.00| SEEDING, TYPE A | | | 0182 L001.02 1.000 ha | 1259.33000 1259.33| 1536.00000 1536.00| SEEDING, TYPE B | | | 0183 L032.75 18.000 Mg | 76.17000 1371.06| 91.75000 1651.50| MULCH | | | 0184 0002.55 289.860 StaM| 22.85000 6623.30| 25.80000 7478.39| OVERLAY BROKEN LINES | | | 0185 0002.60 579.720 StaM| 22.85000 13246.60| 25.80000 14956.78| OVERLAY SOLID LINES | | | 0186 0030.90 LUMP| 46001.70000 46001.70| 131212.00000 131212.00| MOBILIZATION | | | 0187 2001.03 56.000 Mg | 22.39000 1253.84| 15.99000 895.44| GRAVEL SURFACE COURSE | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 14 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0188 2021.00 8.000 EACH| 50.78000 406.24| 57.00000 456.00| MAILBOX POST | | | 0189 3040.12 50.100 m2 | 108.87000 5454.39| 122.95000 6159.80| CONCRETE PAVEMENT REPAIR, TYPE B, FULL | | | DEPTH | | | 0190 3040.13 114.300 m2 | 98.00000 11201.40| 110.67000 12649.58| CONCRETE PAVEMENT REPAIR, TYPE C, FULL | | | DEPTH | | | 0191 3221.05 413.900 m2 | 108.87000 45061.29| 122.95000 50889.01| CONCRETE PAVEMENT, CLASS PR-25 JOINT | | | REPAIR | | | 0192 9000.75 100.000 Mg | 17.42000 1742.00| 14.34000 1434.00| ASPHALTIC CONCRETE FOR STATE | | | MAINTENANCE PATCHING, TYPE SPS | | | 0193 9005.00 300.000 Mg | 40.67000 12201.00| 44.73000 13419.00| ASPHALTIC CONCRETE FOR PATCHING, TYPE | | | SP4(12.5) | | | 0194 9005.23 7490.000 Mg | 18.50000 138565.00| 18.35000 137441.50| ASPHALTIC CONCRETE, TYPE SPS | | | 0195 9005.45 19950.000 Mg | 23.96000 478002.00| 28.67000 571966.50| ASPHALTIC CONCRETE, TYPE SP4(12.5) | | | 0196 9009.00 3910.000 m2 | 2.04000 7976.40| 4.99000 19510.90| PLACEMENT OF ASPHALTIC CONCRETE FOR | | | DRIVEWAYS AND INTERSECTIONS | | | 0197 9020.92 5.400 Mg | 176.43000 952.72| 204.00000 1101.60| PERFORMANCE GRADED BINDER (58-28) FOR | | | STATE MAINTENANCE PATCHING | | | 0198 9021.01 1093.500 Mg | 176.43000 192926.21| 204.15000 223238.03| PERFORMANCE GRADED BINDER (64-22) | | | 0199 9021.03 404.460 Mg | 176.43000 71358.88| 204.15000 82570.51| PERFORMANCE GRADED BINDER (58-28) | | | 0200 9034.00 614.000 m2 | 1.90000 1166.60| 2.06000 1264.84| PREPARATION OF INTERSECTIONS AND | | | DRIVEWAYS | | | 0201 9053.00 93760.000 L | 0.20000 18752.00| 0.21000 19689.60| TACK COAT | | | 0202 9111.00 614.000 kL | 2.15000 1320.10| 3.04000 1866.56| WATER | | | 0203 9170.00 181.870 StaM| 125.19000 22768.31| 217.91000 39631.29| EARTH SHOULDER CONSTRUCTION | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 15 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0204 9173.00 5.680 StaM| 1129.60000 6416.13| 986.00000 5600.48| SUBGRADE PREPARATION | | | 0205 9173.20 508.000 m2 | 2.43000 1234.44| 4.11000 2087.88| SUBGRADE PREPARATION | | | 0206 9179.23 93.721 StaM| 511.86000 47972.03| 584.07000 54739.62| COLD MILLING, CLASS 3 | | | 0207 9188.50 2908.000 m2 | 16.57000 48185.56| 11.47000 33354.76| SURFACING UNDER GUARDRAIL | | | 0208 9300.50 9.500 LS | 2031.18000 2031.18| 2523.00000 2523.00| ASPHALT PAVEMENT SMOOTHNESS TESTING | | | SECTION TOTALS | $ 1,190,364.16| $ 1,445,138.57| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0012 GROUP 10 GENERAL ITEMS | | | 0209 0001.08 7100.000 BDAY| 0.50000 3550.00| 0.50000 3550.00| BARRICADE, TYPE II | | | 0210 0001.10 5918.000 BDAY| 1.37000 8107.66| 1.55000 9172.90| BARRICADE, TYPE III | | | 0211 0001.30 2354.000 LDAY| 1.78000 4190.12| 2.01000 4731.54| TYPE B HIGH INTENSITY WARNING LIGHT | | | 0212 0001.75 400.000 EACH| 10.16000 4064.00| 11.47000 4588.00| TEMPORARY SIGN DAY | | | 0213 0001.90 38204.000 EACH| 0.25000 9551.00| 0.29000 11079.16| SIGN DAY | | | 0214 0002.30 700.000 m | 2.03000 1421.00| 2.29000 1603.00| PAVEMENT MARKING REMOVAL | | | 0215 0002.44 10000.000 m | 0.51000 5100.00| 0.57000 5700.00| TEMPORARY PAVEMENT MARKING, TYPE PAINT | | | 0216 0002.47 700.000 m | 5.08000 3556.00| 5.73000 4011.00| TEMPORARY PAVEMENT MARKING SURFACE | | | PREPARATION | | | 0217 0003.10 80.000 DAY | 176.94000 14155.20| 252.32000 20185.60| FLAGGING | | | 0218 0003.20 22.000 DAY | 277.76000 6110.72| 321.13000 7064.86| FURNISHING AND OPERATING PILOT VEHICLE | | | 0219 0003.51 374.000 m | 39.78000 14877.72| 15.44000 5774.56| INSTALL CONCRETE PROTECTION BARRIER | | | 0220 0003.56 1026.000 m | 6.66000 6833.16| 13.12000 13461.12| RELOCATE CONCRETE PROTECTION BARRIER | | | 0221 0003.75 4.000 EACH| 13786.64000 55146.56| 12042.00000 48168.00| TEMPORARY TRAFFIC SIGNAL | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 16 TABULATION OF BIDS CALL ORDER : F07 CONTRACT ID : 2794X COUNTIES : WASHINGTON LETTING DATE : 03/14/02 1:30 PM DISTRICT : 2 PROJECT(S) : EACNH-BH-30-7(115) ==================================================================================================================================== |(1) 1661 |(2) 0049 | |U.S. ASPHALT CO. |HAWKINS CONSTRUCTION COMPANY| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0222 0010.04 1.000 EACH| 2538.98000 2538.98| 3097.00000 3097.00| FIELD OFFICE | | | 0223 0030.00 LUMP| 21164.60000 21164.60| 4001.00000 4001.00| MOBILIZATION | | | 0224 9110.01 40.000 HOUR| 69.29000 2771.60| 114.69000 4587.60| RENTAL OF LOADER, FULLY OPERATED | | | 0225 9110.02 30.000 HOUR| 58.85000 1765.50| 114.69000 3440.70| RENTAL OF MOTOR GRADER, FULLY OPERATED | | | 0226 9110.03 40.000 HOUR| 53.80000 2152.00| 74.55000 2982.00| RENTAL OF DUMP TRUCK, FULLY OPERATED | | | 0227 9110.07 40.000 HOUR| 44.14000 1765.60| 74.55000 2982.00| RENTAL OF SKID LOADER, FULLY OPERATED | | | SECTION TOTALS | $ 168,821.42| $ 160,180.04| ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 4,044,412.71| $ 4,219,052.30| ====================================================================================================================================