NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 2 VENDOR RANKING CALL ORDER : F18 CONTRACT ID : 5865 COUNTIES : MORRILL CHEYENNE LETTING DATE : 03/14/02 DISTRICT : 5 PROJECT(S) : EACNH-385-2(110) CONTRACT DESCRIPTION : US-385, DALTON NORTH. -------------------------------------------------------------------------------------------------------------------------- VENDOR NO. BID NOTES -------------------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID -------------------------------------------------------------------------------------------------------------------------- 1 2252 PAULSEN, INC. $ 1,195,875.87 100.0000% 2 0083 WERNER CONSTRUCTION, INC. $ 1,258,766.58 105.2589% 3 0477 WESTERN ENGINEERING COMPANY, INC. $ 1,306,008.92 109.2094% 4 2853 SIMON CONTRACTORS AND SUBSIDIARIES $ 1,371,165.71 114.6578% 5 0875 BROWER CONSTRUCTION CO. $ 1,483,909.74 124.0855% 6 3385 LAFARGE CORPORATION & ITS SUBSIDIARIES $ 1,522,603.97 127.3212% NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 3 TABULATION OF BIDS CALL ORDER : F18 CONTRACT ID : 5865 COUNTIES : MORRILL CHEYENNE LETTING DATE : 03/14/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACNH-385-2(110) ==================================================================================================================================== |(1) 2252 |(2) 0083 |(3) 0477 |PAULSEN, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 GROUP 4 CULVERT AT STA. 782+70 TRIPLE 10'X8'X70' EXTEND 26' LT. & RT. | | | 0001 0030.40 LUMP| 2000.00000 2000.00| 2000.00000 2000.00| 2000.00000 2000.00 MOBILIZATION | | | 0002 4044.00 1.000 EACH| 5000.00000 5000.00| 5000.00000 5000.00| 5000.00000 5000.00 PREPARATION OF STRUCTURE AT STA. 782+70 | | | 0003 4051.01 207.000 CY | 10.00000 2070.00| 10.00000 2070.00| 10.00000 2070.00 EXCAVATION FOR BOX CULVERTS | | | 0004 4101.06 211.220 CY | 235.00000 49636.70| 235.00000 49636.70| 235.00000 49636.70 CLASS 47B-3000 OR AX-3000 CONCRETE FOR | | | BOX CULVERT | | | 0005 4151.00 21284.000 LB | 0.50000 10642.00| 0.50000 10642.00| 0.50000 10642.00 REINFORCING STEEL FOR BOX CULVERT | | | SECTION TOTALS | $ 69,348.70| $ 69,348.70| $ 69,348.70 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 GROUP 9 BITUMINOUS | | | 0006 L001.02 24.000 ACRE| 620.00000 14880.00| 605.00000 14520.00| 605.00000 14520.00 SEEDING, TYPE B | | | 0007 L032.75 54.000 TON | 82.00000 4428.00| 80.00000 4320.00| 80.00000 4320.00 MULCH | | | 0008 0002.55 849.760 STA | 5.50000 4673.68| 7.00000 5948.32| 7.00000 5948.32 OVERLAY BROKEN LINES | | | 0009 0002.60 1699.520 STA | 5.50000 9347.36| 8.00000 13596.16| 7.00000 11896.64 OVERLAY SOLID LINES | | | 0010 0030.90 LUMP| 27000.00000 27000.00| 34000.00000 34000.00| 25000.00000 25000.00 MOBILIZATION | | | 0011 1009.00 LUMP| 100.00000 100.00| 1000.00000 1000.00| 1200.00000 1200.00 GENERAL CLEARING AND GRUBBING | | | 0012 1030.00 3926.000 CY | 4.25000 16685.50| 7.50000 29445.00| 6.00000 23556.00 EARTHWORK MEASURED IN EMBANKMENT | | | 0013 1043.50 160.000 SY | 2.55000 408.00| 4.00000 640.00| 4.00000 640.00 RIPRAP FILTER FABRIC | | | 0014 1102.00 2044.000 SY | 2.35000 4803.40| 2.95000 6029.80| 4.00000 8176.00 REMOVE ASPHALT SURFACE | | | 0015 2001.00 90.000 CY | 13.65000 1228.50| 9.50000 855.00| 10.25000 922.50 GRAVEL SURFACE COURSE | | | 0016 6105.02 90.000 TON | 41.00000 3690.00| 38.00000 3420.00| 38.00000 3420.00 ROCK RIPRAP, TYPE B | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 4 TABULATION OF BIDS CALL ORDER : F18 CONTRACT ID : 5865 COUNTIES : MORRILL CHEYENNE LETTING DATE : 03/14/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACNH-385-2(110) ==================================================================================================================================== |(1) 2252 |(2) 0083 |(3) 0477 |PAULSEN, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0017 7017.00 762.500 LF | 1.60000 1220.00| 3.00000 2287.50| 3.00000 2287.50 REMOVE GUARDRAIL | | | 0018 9000.75 100.000 TON | 9.95000 995.00| 11.34000 1134.00| 15.00000 1500.00 ASPHALTIC CONCRETE FOR STATE | | | MAINTENANCE PATCHING, TYPE SPS | | | 0019 9005.00 400.000 TON | 21.80000 8720.00| 28.40000 11360.00| 24.00000 9600.00 ASPHALTIC CONCRETE FOR PATCHING, TYPE | | | SP4 | | | 0020 9005.23 8440.000 TON | 9.95000 83978.00| 11.34000 95709.60| 11.60000 97904.00 ASPHALTIC CONCRETE, TYPE SPS | | | 0021 9005.45 26260.000 TON | 18.75000 492375.00| 18.40000 483184.00| 19.15000 502879.00 ASPHALTIC CONCRETE, TYPE SP4(0.5) | | | 0022 9009.00 1681.000 SY | 1.50000 2521.50| 1.25000 2101.25| 1.50000 2521.50 PLACEMENT OF ASPHALTIC CONCRETE FOR | | | DRIVEWAYS AND INTERSECTIONS | | | 0023 9020.92 5.400 TON | 160.50000 866.70| 159.00000 858.60| 157.20000 848.88 PERFORMANCE GRADED BINDER (58-28) FOR | | | STATE MAINTENANCE PATCHING | | | 0024 9021.01 1439.640 TON | 160.50000 231062.22| 159.00000 228902.76| 157.20000 226311.41 PERFORMANCE GRADED BINDER (64-22) | | | 0025 9021.03 455.760 TON | 160.50000 73149.48| 159.00000 72465.84| 157.20000 71645.47 PERFORMANCE GRADED BINDER (58-28) | | | 0026 9053.00 34090.000 GAL | 0.81000 27612.90| 1.00000 34090.00| 1.20000 40908.00 TACK COAT | | | 0027 9110.01 40.000 HOUR| 45.00000 1800.00| 65.00000 2600.00| 55.00000 2200.00 RENTAL OF LOADER, FULLY OPERATED | | | 0028 9110.02 40.000 HOUR| 45.00000 1800.00| 60.00000 2400.00| 55.00000 2200.00 RENTAL OF MOTOR GRADER, FULLY OPERATED | | | 0029 9110.03 40.000 HOUR| 38.00000 1520.00| 50.00000 2000.00| 40.00000 1600.00 RENTAL OF DUMP TRUCK, FULLY OPERATED | | | 0030 9110.07 40.000 HOUR| 30.00000 1200.00| 45.00000 1800.00| 35.00000 1400.00 RENTAL OF SKID LOADER, FULLY OPERATED | | | 0031 9111.00 319.000 MGAL| 8.25000 2631.75| 8.00000 2552.00| 8.00000 2552.00 WATER | | | 0032 9170.00 853.767 STA | 19.50000 16648.46| 30.00000 25613.01| 60.00000 51226.02 EARTH SHOULDER CONSTRUCTION | | | 0033 9173.20 2677.000 SY | 0.65000 1740.05| 2.75000 7361.75| 1.60000 4283.20 SUBGRADE PREPARATION | | | 0034 9179.23 426.883 STA | 133.60000 57031.57| 145.00000 61898.04| 160.00000 68301.28 COLD MILLING, CLASS 3 | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 5 TABULATION OF BIDS CALL ORDER : F18 CONTRACT ID : 5865 COUNTIES : MORRILL CHEYENNE LETTING DATE : 03/14/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACNH-385-2(110) ==================================================================================================================================== |(1) 2252 |(2) 0083 |(3) 0477 |PAULSEN, INC. |WERNER CONSTRUCTION, INC. |WESTERN ENGINEERING COMPANY, LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0035 9300.50 16.170 LS | 2500.00000 2500.00| 4000.00000 4000.00| 3600.00000 3600.00 ASPHALT PAVEMENT SMOOTHNESS TESTING | | | SECTION TOTALS | $ 1,096,617.07| $ 1,156,092.63| $ 1,193,367.72 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 GROUP 10 GENERAL ITEMS | | | 0036 0001.08 550.000 BDAY| 0.50000 275.00| 0.50000 275.00| 0.50000 275.00 BARRICADE, TYPE II | | | 0037 0001.10 830.000 BDAY| 3.40000 2822.00| 3.00000 2490.00| 3.85000 3195.50 BARRICADE, TYPE III | | | 0038 0001.30 250.000 LDAY| 4.20000 1050.00| 3.00000 750.00| 3.80000 950.00 TYPE B HIGH INTENSITY WARNING LIGHT | | | 0039 0001.75 858.000 EACH| 5.60000 4804.80| 5.50000 4719.00| 6.00000 5148.00 TEMPORARY SIGN DAY | | | 0040 0001.90 7255.000 EACH| 0.66000 4788.30| 0.75000 5441.25| 0.80000 5804.00 SIGN DAY | | | 0041 0003.10 78.000 DAY | 140.00000 10920.00| 175.00000 13650.00| 140.00000 10920.00 FLAGGING | | | 0042 0010.04 1.000 EACH| 1250.00000 1250.00| 1000.00000 1000.00| 2000.00000 2000.00 FIELD OFFICE | | | 0043 0030.00 LUMP| 4000.00000 4000.00| 5000.00000 5000.00| 15000.00000 15000.00 MOBILIZATION | | | SECTION TOTALS | $ 29,910.10| $ 33,325.25| $ 43,292.50 ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 1,195,875.87| $ 1,258,766.58| $ 1,306,008.92 ==================================================================================================================================== NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 6 TABULATION OF BIDS CALL ORDER : F18 CONTRACT ID : 5865 COUNTIES : MORRILL CHEYENNE LETTING DATE : 03/14/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACNH-385-2(110) ==================================================================================================================================== |(4) 2853 |(5) 0875 |(6) 3385 |SIMON CONTRACTORS AND SUBSID|BROWER CONSTRUCTION CO. |LAFARGE CORPORATION & ITS SU LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 GROUP 4 CULVERT AT STA. 782+70 TRIPLE 10'X8'X70' EXTEND 26' LT. & RT. | | | 0001 0030.40 LUMP| 6070.00000 6070.00| 12775.00000 12775.00| 2900.00000 2900.00 MOBILIZATION | | | 0002 4044.00 1.000 EACH| 2260.00000 2260.00| 5000.00000 5000.00| 5000.00000 5000.00 PREPARATION OF STRUCTURE AT STA. 782+70 | | | 0003 4051.01 207.000 CY | 16.90000 3498.30| 10.00000 2070.00| 10.00000 2070.00 EXCAVATION FOR BOX CULVERTS | | | 0004 4101.06 211.220 CY | 279.00000 58930.38| 235.00000 49636.70| 236.00000 49847.92 CLASS 47B-3000 OR AX-3000 CONCRETE FOR | | | BOX CULVERT | | | 0005 4151.00 21284.000 LB | 0.60000 12770.40| 0.50000 10642.00| 0.50000 10642.00 REINFORCING STEEL FOR BOX CULVERT | | | SECTION TOTALS | $ 83,529.08| $ 80,123.70| $ 70,459.92 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 GROUP 9 BITUMINOUS | | | 0006 L001.02 24.000 ACRE| 319.00000 7656.00| 605.00000 14520.00| 605.00000 14520.00 SEEDING, TYPE B | | | 0007 L032.75 54.000 TON | 133.00000 7182.00| 80.00000 4320.00| 80.00000 4320.00 MULCH | | | 0008 0002.55 849.760 STA | 7.50000 6373.20| 7.00000 5948.32| 7.00000 5948.32 OVERLAY BROKEN LINES | | | 0009 0002.60 1699.520 STA | 7.50000 12746.40| 7.00000 11896.64| 7.00000 11896.64 OVERLAY SOLID LINES | | | 0010 0030.90 LUMP| 49225.00000 49225.00| 128061.76000 128061.76| 150000.00000 150000.00 MOBILIZATION | | | 0011 1009.00 LUMP| 726.00000 726.00| 3000.00000 3000.00| 4000.00000 4000.00 GENERAL CLEARING AND GRUBBING | | | 0012 1030.00 3926.000 CY | 4.80000 18844.80| 7.00000 27482.00| 8.00000 31408.00 EARTHWORK MEASURED IN EMBANKMENT | | | 0013 1043.50 160.000 SY | 4.80000 768.00| 5.00000 800.00| 4.00000 640.00 RIPRAP FILTER FABRIC | | | 0014 1102.00 2044.000 SY | 2.60000 5314.40| 2.45000 5007.80| 2.00000 4088.00 REMOVE ASPHALT SURFACE | | | 0015 2001.00 90.000 CY | 17.00000 1530.00| 20.00000 1800.00| 55.00000 4950.00 GRAVEL SURFACE COURSE | | | 0016 6105.02 90.000 TON | 26.60000 2394.00| 50.00000 4500.00| 40.00000 3600.00 ROCK RIPRAP, TYPE B | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 7 TABULATION OF BIDS CALL ORDER : F18 CONTRACT ID : 5865 COUNTIES : MORRILL CHEYENNE LETTING DATE : 03/14/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACNH-385-2(110) ==================================================================================================================================== |(4) 2853 |(5) 0875 |(6) 3385 |SIMON CONTRACTORS AND SUBSID|BROWER CONSTRUCTION CO. |LAFARGE CORPORATION & ITS SU LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0017 7017.00 762.500 LF | 2.10000 1601.25| 5.00000 3812.50| 4.00000 3050.00 REMOVE GUARDRAIL | | | 0018 9000.75 100.000 TON | 8.80000 880.00| 14.02000 1402.00| 18.00000 1800.00 ASPHALTIC CONCRETE FOR STATE | | | MAINTENANCE PATCHING, TYPE SPS | | | 0019 9005.00 400.000 TON | 26.30000 10520.00| 42.27000 16908.00| 40.00000 16000.00 ASPHALTIC CONCRETE FOR PATCHING, TYPE | | | SP4 | | | 0020 9005.23 8440.000 TON | 13.95000 117738.00| 14.02000 118328.80| 20.50000 173020.00 ASPHALTIC CONCRETE, TYPE SPS | | | 0021 9005.45 26260.000 TON | 22.50000 590850.00| 20.00000 525200.00| 22.80000 598728.00 ASPHALTIC CONCRETE, TYPE SP4(0.5) | | | 0022 9009.00 1681.000 SY | 1.90000 3193.90| 3.50000 5883.50| 3.50000 5883.50 PLACEMENT OF ASPHALTIC CONCRETE FOR | | | DRIVEWAYS AND INTERSECTIONS | | | 0023 9020.92 5.400 TON | 160.00000 864.00| 159.56000 861.62| 130.00000 702.00 PERFORMANCE GRADED BINDER (58-28) FOR | | | STATE MAINTENANCE PATCHING | | | 0024 9021.01 1439.640 TON | 160.00000 230342.40| 159.56000 229708.96| 130.00000 187153.20 PERFORMANCE GRADED BINDER (64-22) | | | 0025 9021.03 455.760 TON | 160.00000 72921.60| 159.56000 72721.07| 130.00000 59248.80 PERFORMANCE GRADED BINDER (58-28) | | | 0026 9053.00 34090.000 GAL | 0.40000 13636.00| 0.72000 24544.80| 0.55000 18749.50 TACK COAT | | | 0027 9110.01 40.000 HOUR| 45.50000 1820.00| 65.00000 2600.00| 80.00000 3200.00 RENTAL OF LOADER, FULLY OPERATED | | | 0028 9110.02 40.000 HOUR| 46.80000 1872.00| 65.00000 2600.00| 90.00000 3600.00 RENTAL OF MOTOR GRADER, FULLY OPERATED | | | 0029 9110.03 40.000 HOUR| 35.80000 1432.00| 55.00000 2200.00| 55.00000 2200.00 RENTAL OF DUMP TRUCK, FULLY OPERATED | | | 0030 9110.07 40.000 HOUR| 37.10000 1484.00| 50.00000 2000.00| 70.00000 2800.00 RENTAL OF SKID LOADER, FULLY OPERATED | | | 0031 9111.00 319.000 MGAL| 3.70000 1180.30| 9.00000 2871.00| 5.33000 1700.27 WATER | | | 0032 9170.00 853.767 STA | 18.90000 16136.20| 70.00000 59763.69| 35.00000 29881.85 EARTH SHOULDER CONSTRUCTION | | | 0033 9173.20 2677.000 SY | 0.70000 1873.90| 2.00000 5354.00| 1.00000 2677.00 SUBGRADE PREPARATION | | | 0034 9179.23 426.883 STA | 148.00000 63178.68| 160.06000 68326.89| 146.00000 62324.92 COLD MILLING, CLASS 3 | | | NEBRASKA DEPARTMENT OF ROADS DATE : 03/14/02 PAGE : 8 TABULATION OF BIDS CALL ORDER : F18 CONTRACT ID : 5865 COUNTIES : MORRILL CHEYENNE LETTING DATE : 03/14/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACNH-385-2(110) ==================================================================================================================================== |(4) 2853 |(5) 0875 |(6) 3385 |SIMON CONTRACTORS AND SUBSID|BROWER CONSTRUCTION CO. |LAFARGE CORPORATION & ITS SU LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0035 9300.50 16.170 LS | 581.00000 581.00| 3500.00000 3500.00| 9000.00000 9000.00 ASPHALT PAVEMENT SMOOTHNESS TESTING | | | SECTION TOTALS | $ 1,244,865.03| $ 1,355,923.35| $ 1,417,090.00 ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 GROUP 10 GENERAL ITEMS | | | 0036 0001.08 550.000 BDAY| 0.50000 275.00| 0.50000 275.00| 0.50000 275.00 BARRICADE, TYPE II | | | 0037 0001.10 830.000 BDAY| 3.70000 3071.00| 2.45000 2033.50| 2.45000 2033.50 BARRICADE, TYPE III | | | 0038 0001.30 250.000 LDAY| 3.70000 925.00| 2.50000 625.00| 2.50000 625.00 TYPE B HIGH INTENSITY WARNING LIGHT | | | 0039 0001.75 858.000 EACH| 3.70000 3174.60| 5.60000 4804.80| 5.60000 4804.80 TEMPORARY SIGN DAY | | | 0040 0001.90 7255.000 EACH| 0.80000 5804.00| 0.65000 4715.75| 0.65000 4715.75 SIGN DAY | | | 0041 0003.10 78.000 DAY | 309.00000 24102.00| 193.38000 15083.64| 200.00000 15600.00 FLAGGING | | | 0042 0010.04 1.000 EACH| 1120.00000 1120.00| 3000.00000 3000.00| 6000.00000 6000.00 FIELD OFFICE | | | 0043 0030.00 LUMP| 4300.00000 4300.00| 17325.00000 17325.00| 1000.00000 1000.00 MOBILIZATION | | | SECTION TOTALS | $ 42,771.60| $ 47,862.69| $ 35,054.05 ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 1,371,165.71| $ 1,483,909.74| $ 1,522,603.97 ====================================================================================================================================