Contract Letting August 01, 2002 |
NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 2 VENDOR RANKING CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) CONTRACT DESCRIPTION : S-87-4(1010) ON N-250 NIOBRARA RIVER SOUTH OF RUSHVILLE, S-250-4(1002) N-87 NORTH OF RUSHVILLE AND N-250 RUSH CREEK SOUTH OF RUSHVILLE. -------------------------------------------------------------------------------------------------------------------------- VENDOR NO. BID NOTES -------------------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------- TOTAL % OVER RANK VENDOR NO./NAME BID LOW BID -------------------------------------------------------------------------------------------------------------------------- 1 2283 PERRETT CONSTRUCTION LTD. $ 2,690,897.69 100.0000% 2 2853 SIMON CONTRACTORS AND SUBSIDIARIES $ 2,862,704.96 106.3847% NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 3 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0001 GROUP 1 GRADING | | | 0001 L020.00 433.500 m2 | 1.75000 758.63| 1.93400 838.39| EROSION CONTROL | | | 0002 L020.01 4544.000 m2 | 7.00000 31808.00| 7.83100 35584.06| EROSION CONTROL, TYPE A | | | 0003 L020.08 501.000 m2 | 9.00000 4509.00| 7.94700 3981.45| EROSION CONTROL, TYPE AA | | | 0004 L020.09 176.000 m2 | 14.00000 2464.00| 16.70100 2939.38| EROSION CONTROL, TYPE AAA | | | 0005 L020.20 6310.000 m2 | 0.60000 3786.00| 0.59800 3773.38| SLOPE PROTECTION NETTING | | | 0006 L021.01 18.000 BALE| 30.00000 540.00| 25.30000 455.40| EROSION CHECKS, TYPE A | | | 0007 L021.11 324.000 BALE| 35.00000 11340.00| 28.17500 9128.70| EROSION CHECKS, TYPE ST-A | | | 0008 L022.25 1532.000 m | 11.00000 16852.00| 17.07700 26161.96| FABRIC SILT FENCE, TYPE COIR FIBER | | | 0009 P375.48 66.000 m | 225.00000 14850.00| 183.37300 12102.62| 1200 mm ROUND EQUIVALENT CULVERT PIPE, | | | TYPE 3,4 OR 5 | | | 0010 0030.10 LUMP| 30000.00000 30000.00| 24265.00000 24265.00| MOBILIZATION | | | 0011 1000.00 52.000 EACH| 225.00000 11700.00| 115.00000 5980.00| LARGE TREE REMOVAL | | | 0012 1009.00 LUMP| 7500.00000 7500.00| 5750.00000 5750.00| GENERAL CLEARING AND GRUBBING | | | 0013 1010.00 70622.000 m3 | 1.70000 120057.40| 2.17300 153461.61| EXCAVATION | | | 0014 1010.01 1542.000 m3 | 3.69000 5689.98| 4.60000 7093.20| EXCAVATION (ESTABLISHED QUANTITY) | | | 0015 1011.00 5688.000 kL | 0.01000 56.88| 1.15000 6541.20| WATER | | | 0016 1012.00 18.000 EACH| 100.00000 1800.00| 63.25000 1138.50| RIGHT-OF-WAY MARKERS | | | 0017 1030.00 11820.000 m3 | 3.30000 39006.00| 7.47500 88354.50| EARTHWORK MEASURED IN EMBANKMENT | | | 0018 1040.00 57275.000 m2 | 0.40000 22910.00| 0.56400 32303.10| SLOPE PROTECTION | | | NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 4 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0019 1040.05 2788.000 m2 | 0.30000 836.40| 0.86300 2406.04| TEMPORARY SLOPE PROTECTION | | | 0020 1040.06 69.600 Mg | 120.00000 8352.00| 138.00000 9604.80| SLOPE PROTECTION MULCH | | | 0021 1041.00 77515.000 m2 | 0.55000 42633.25| 0.36800 28525.52| SALVAGING AND PLACING TOPSOIL | | | 0022 1101.00 462.700 m2 | 6.00000 2776.20| 3.16100 1462.59| REMOVE PAVEMENT | | | 0023 1701.18 12.000 m | 30.75000 369.00| 50.98300 611.80| 450 mm DRIVEWAY CULVERT PIPE, TYPE 2,3, | | | 4,5,6,7 OR 8 | | | 0024 1701.24 129.000 m | 41.20000 5314.80| 66.70000 8604.30| 600 mm DRIVEWAY CULVERT PIPE, TYPE 2,3, | | | 4,5,6,7 OR 8 | | | 0025 2001.00 924.000 m3 | 41.00000 37884.00| 29.90000 27627.60| GRAVEL SURFACE COURSE | | | 0026 2009.10 17.847 StaM| 310.00000 5532.57| 632.44500 11287.25| GRAVEL EMBEDMENT | | | 0027 7017.00 215.800 m | 12.00000 2589.60| 5.75000 1240.85| REMOVE GUARDRAIL | | | SECTION TOTALS | $ 431,915.71| $ 511,223.20| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0002 GROUP 4 CULVERTS | | | 0028 P070.24 50.200 m | 88.00000 4417.60| 101.20900 5080.69| 600 mm CULVERT PIPE, TYPE 2,3,4,5,6,7 | | | OR 8 | | | 0029 P300.36 18.800 m | 115.00000 2162.00| 132.25000 2486.30| 900 mm CULVERT PIPE, TYPE 3,4 OR 5 | | | 0030 P406.48 36.800 m | 277.00000 10193.60| 318.56300 11723.12| 1200 mm CULVERT PIPE, TYPE 2,3,4 OR 5 | | | 0031 0030.40 LUMP| 15000.00000 15000.00| 10350.00000 10350.00| MOBILIZATION | | | 0032 4040.00 2.000 EACH| 100.00000 200.00| 115.00000 230.00| REMOVE HEADWALLS FROM CULVERTS | | | 0033 4044.00 1.000 EACH| 2000.00000 2000.00| 2300.00000 2300.00| PREPARATION OF STRUCTURE AT STA. | | | 118+62.5 | | | NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 5 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0034 4050.01 189.000 m3 | 15.00000 2835.00| 17.25000 3260.25| EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS,| | | AND HEADWALLS | | | 0035 4051.01 45.000 m3 | 18.00000 810.00| 20.70000 931.50| EXCAVATION FOR BOX CULVERTS | | | 0036 4101.06 37.700 m3 | 480.00000 18096.00| 552.00000 20810.40| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | 0037 4151.00 2074.000 kg | 0.70000 1451.80| 0.80500 1669.57| REINFORCING STEEL FOR BOX CULVERT | | | 0038 4310.36 2.000 EACH| 460.00000 920.00| 529.00000 1058.00| 900 mm FLARED-END SECTION | | | SECTION TOTALS | $ 58,086.00| $ 59,899.83| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0003 GROUP 4A CULVERT AT STA. 11+60 TWIN 3.05 M X 3.05 M CONCRETE BOX CULVERT | | | 0039 0030.40 LUMP| 19000.00000 19000.00| 17135.00000 17135.00| MOBILIZATION | | | 0040 4051.01 1166.000 m3 | 15.00000 17490.00| 17.25000 20113.50| EXCAVATION FOR BOX CULVERTS | | | 0041 4054.65 LUMP| 8000.00000 8000.00| 13742.50000 13742.50| TEMPORARY SHORING AT STA. 11+60 | | | 0042 4101.06 140.530 m3 | 480.00000 67454.40| 552.00500 77573.26| CLASS 47B-20 OR AX-20 CONCRETE FOR BOX | | | CULVERT | | | 0043 4151.00 9241.000 kg | 0.70000 6468.70| 0.80500 7439.01| REINFORCING STEEL FOR BOX CULVERT | | | SECTION TOTALS | $ 118,413.10| $ 136,003.27| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0004 GROUP 6 BRIDGE AT STA. 110+74.5 ALT AA1 79.0 m 2-SPAN PRESTRESSED CONCRETE GIRDER BRIDGE (NU1600) | | | 0044 0030.60 LUMP| 45000.00000 45000.00| | MOBILIZATION | | | 0045 1010.01 415.000 m3 | 12.00000 4980.00| | EXCAVATION (ESTABLISHED QUANTITY) | | | 0046 1043.50 327.000 m2 | 4.00000 1308.00| | RIPRAP FILTER FABRIC | | | NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 6 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0047 3050.15 119.000 m3 | 425.00000 50575.00| | CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-30 | | | 0048 3051.10 8020.000 kg | 1.45000 11629.00| | EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0049 6000.10 69.000 LS | 15000.00000 15000.00| | ABUTMENT NO.1 EXCAVATION | | | 0050 6000.11 80.000 LS | 15000.00000 15000.00| | ABUTMENT NO.2 EXCAVATION | | | 0051 6001.00 41.000 LS | 35000.00000 35000.00| | BENT NO.1 EXCAVATION | | | 0052 6005.35 23.000 m | 175.00000 4025.00| | PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0053 6005.78 8.000 EACH| 850.00000 6800.00| | EXPANSION BEARING, TFE TYPE | | | 0054 6005.83 8.000 EACH| 650.00000 5200.00| | FIXED BEARING | | | 0055 6010.22 158.200 m3 | 490.00000 77518.00| | CLASS 47B-20 CONCRETE FOR BRIDGE | | | 0056 6010.26 266.900 m3 | 495.00000 132115.50| | CLASS 47BD-30 CONCRETE FOR BRIDGE | | | 0057 6011.11 165.000 LS | 250000.00000 250000.00| | PRECAST/PRESTRESSED CONCRETE | | | SUPERSTRUCTURE AT STA. 110+74.5 | | | 0058 6040.00 1.000 EACH| 25000.00000 25000.00| | REMOVE STRUCTURE AT STA. 110+70, 21.21 | | | m LEFT | | | 0059 6080.00 3785.000 kg | 4.00000 15140.00| | STRUCTURAL STEEL FOR SUBSTRUCTURE | | | 0060 6104.00 300.000 Mg | 30.00000 9000.00| | BROKEN CONCRETE RIPRAP | | | 0061 6131.50 51155.000 kg | 1.45000 74174.75| | EPOXY COATED REINFORCING STEEL | | | 0062 6139.50 66.000 m2 | 18.00000 1188.00| | SUBSURFACE DRAINAGE MATTING | | | 0063 6210.50 847.200 m | 94.00000 79636.80| | PIPE PILING | | | NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 7 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0064 6310.00 335.200 m2 | 125.00000 41900.00| | STEEL SHEET PILING | | | 0065 8091.00 266.800 m3 | 48.00000 12806.40| | GRANULAR BACKFILL | | | SECTION TOTALS | $ 912,996.45| $ | ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0005 GROUP 6A BRIDGE AT STA. 110+74.5 ALT AA2 79.0 m 2-SPAN WELDED PLATE GIRDER | | | 0066 0030.60 LUMP| | 50761.00000 50761.00| MOBILIZATION | | | 0067 1010.01 415.000 m3 | | 19.56100 8117.82| EXCAVATION (ESTABLISHED QUANTITY) | | | 0068 1043.50 327.000 m2 | | 6.23900 2040.15| RIPRAP FILTER FABRIC | | | 0069 3050.15 119.000 m3 | | 469.20000 55834.80| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-30 | | | 0070 3051.10 8020.000 kg | | 0.92000 7378.40| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0071 6000.10 69.000 LS | | 2530.00000 2530.00| ABUTMENT NO.1 EXCAVATION | | | 0072 6000.11 80.000 LS | | 2530.00000 2530.00| ABUTMENT NO.2 EXCAVATION | | | 0073 6001.00 41.000 LS | | 8073.00000 8073.00| BENT NO.1 EXCAVATION | | | 0074 6005.35 23.000 m | | 153.50000 3530.50| PRECOMPRESSED POLYURETHANE FOAM JOINT | | | 0075 6005.78 8.000 EACH| | 736.00000 5888.00| EXPANSION BEARING, TFE TYPE | | | 0076 6005.83 4.000 EACH| | 1690.50000 6762.00| FIXED BEARING | | | 0077 6010.22 158.200 m3 | | 483.26200 76452.05| CLASS 47B-20 CONCRETE FOR BRIDGE | | | 0078 6010.26 226.400 m3 | | 523.68700 118562.74| CLASS 47BD-30 CONCRETE FOR BRIDGE | | | 0079 6040.00 1.000 EACH| | 57672.50000 57672.50| REMOVE STRUCTURE AT STA. 110+70, 21.21 | | | m LEFT | | | NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 8 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0080 6071.11 192140.000 LS | | 335465.35000 335465.35| STEEL SUPERSTRUCTURE AT STA. 110+74.5 | | | 0081 6080.00 3785.000 kg | | 4.07700 15431.45| STRUCTURAL STEEL FOR SUBSTRUCTURE | | | 0082 6104.00 300.000 Mg | | 46.49800 13949.40| BROKEN CONCRETE RIPRAP | | | 0083 6131.50 40035.000 kg | | 1.59500 63855.83| EPOXY COATED REINFORCING STEEL | | | 0084 6139.50 66.000 m2 | | 24.72500 1631.85| SUBSURFACE DRAINAGE MATTING | | | 0085 6210.50 847.200 m | | 99.68800 84455.67| PIPE PILING | | | 0086 6310.00 335.200 m2 | | 168.36600 56436.28| STEEL SHEET PILING | | | 0087 8091.00 266.800 m3 | | 33.83600 9027.44| GRANULAR BACKFILL | | | SECTION TOTALS | $ | $ 986,386.23| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0006 GROUP 6B BRIDGE AT STA. 101+62 ALT BB1 37.2 M SIMPLE SPAN PRESTRESSED NU1350 GIRDER BRIDGE | | | 0088 0030.60 LUMP| | | MOBILIZATION | | | 0089 1010.01 2775.000 m3 | | | EXCAVATION (ESTABLISHED QUANTITY) | | | 0090 3050.15 120.600 m3 | | | CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-30 | | | 0091 3051.10 8240.000 kg | | | EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0092 6000.10 27.200 LS | | | ABUTMENT NO.1 EXCAVATION | | | 0093 6000.11 27.200 LS | | | ABUTMENT NO.2 EXCAVATION | | | 0094 6010.22 49.600 m3 | | | CLASS 47B-20 CONCRETE FOR BRIDGE | | | 0095 6010.26 139.400 m3 | | | CLASS 47BD-30 CONCRETE FOR BRIDGE | | | NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 9 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0096 6011.11 91.100 LS | | | PRECAST/PRESTRESSED CONCRETE | | | SUPERSTRUCTURE AT STA. 101+62 | | | 0097 6040.00 1.000 EACH| | | REMOVE STRUCTURE AT STA. 101+64.44 | | | 0098 6080.00 1660.000 kg | | | STRUCTURAL STEEL FOR SUBSTRUCTURE | | | 0099 6104.00 35.000 Mg | | | BROKEN CONCRETE RIPRAP | | | 0100 6105.02 1220.000 Mg | | | ROCK RIPRAP, TYPE B | | | 0101 6131.50 15987.000 kg | | | EPOXY COATED REINFORCING STEEL | | | 0102 6210.50 316.800 m | | | PIPE PILING | | | 0103 6310.00 391.100 m2 | | | STEEL SHEET PILING | | | 0104 8091.00 220.000 m3 | | | GRANULAR BACKFILL | | | SECTION TOTALS | $ | $ | ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0007 GROUP 6C BRIDGE AT STA. 101+62 ALT BB2 37.2 M SIMPLE SPAN, WELDED PLATE GIRDER BRIDGE | | | 0105 0030.60 LUMP| 42000.00000 42000.00| 28140.00000 28140.00| MOBILIZATION | | | 0106 1010.01 2775.000 m3 | 10.00000 27750.00| 9.02600 25047.15| EXCAVATION (ESTABLISHED QUANTITY) | | | 0107 3050.15 120.600 m3 | 425.00000 51255.00| 469.20200 56585.76| CONCRETE FOR PAVEMENT APPROACHES CLASS | | | 47BD-30 | | | 0108 3051.10 8240.000 kg | 1.45000 11948.00| 0.92000 7580.80| EPOXY COATED REINFORCING STEEL FOR | | | PAVEMENT APPROACHES | | | 0109 6000.10 27.200 LS | 15000.00000 15000.00| 2415.00000 2415.00| ABUTMENT NO.1 EXCAVATION | | | 0110 6000.11 27.200 LS | 15000.00000 15000.00| 2415.00000 2415.00| ABUTMENT NO.2 EXCAVATION | | | NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 10 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0111 6010.22 49.600 m3 | 498.00000 24700.80| 494.26800 24515.69| CLASS 47B-20 CONCRETE FOR BRIDGE | | | 0112 6010.26 131.700 m3 | 498.00000 65586.60| 517.36900 68137.50| CLASS 47BD-30 CONCRETE FOR BRIDGE | | | 0113 6040.00 1.000 EACH| 25000.00000 25000.00| 35880.00000 35880.00| REMOVE STRUCTURE AT STA. 101+64.44 | | | 0114 6071.11 70805.000 LS | 175000.00000 175000.00| 148194.75000 148194.75| STEEL SUPERSTRUCTURE AT STA. 101+62 | | | 0115 6080.00 1660.000 kg | 6.00000 9960.00| 3.52100 5844.86| STRUCTURAL STEEL FOR SUBSTRUCTURE | | | 0116 6104.00 35.000 Mg | 38.00000 1330.00| 49.31900 1726.17| BROKEN CONCRETE RIPRAP | | | 0117 6105.02 1220.000 Mg | 38.00000 46360.00| 44.18800 53909.36| ROCK RIPRAP, TYPE B | | | 0118 6131.50 16020.000 kg | 1.45000 23229.00| 1.61300 25840.26| EPOXY COATED REINFORCING STEEL | | | 0119 6210.50 277.200 m | 95.00000 26334.00| 122.57100 33976.68| PIPE PILING | | | 0120 6310.00 391.100 m2 | 135.00000 52798.50| 158.04800 61812.57| STEEL SHEET PILING | | | 0121 8091.00 220.000 m3 | 48.00000 10560.00| 32.91100 7240.42| GRANULAR BACKFILL | | | SECTION TOTALS | $ 623,811.90| $ 589,261.97| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0008 GROUP 7 GUARDRAIL | | | 0122 0030.70 LUMP| 9000.00000 9000.00| 4025.00000 4025.00| MOBILIZATION | | | 0123 7011.20 76.210 m | 48.00000 3658.08| 55.21400 4207.86| W-BEAM GUARDRAIL | | | 0124 7020.00 8.000 EACH| 1250.00000 10000.00| 1437.50000 11500.00| BRIDGE APPROACH SECTIONS | | | 0125 7024.27 8.000 EACH| 1650.00000 13200.00| 1897.50000 15180.00| GUARDRAIL END TREATMENT, TYPE II | | | SECTION TOTALS | $ 35,858.08| $ 34,912.86| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0009 GROUP 9 BITUMINOUS | | | NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 11 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0126 P402.15 134.200 m | 105.00000 14091.00| 83.56800 11214.83| 375 mm CULVERT PIPE, TYPE 3,4,5 OR 6 | | | 0127 0002.55 16.620 StaM| 35.00000 581.70| 40.27100 669.30| OVERLAY BROKEN LINES | | | 0128 0030.90 LUMP| 45000.00000 45000.00| 12712.10000 12712.10| MOBILIZATION | | | 0129 1020.03 32.000 EACH| 8.00000 256.00| 9.20000 294.40| DELINEATOR, TYPE III | | | 0130 1020.20 16.000 EACH| 25.00000 400.00| 28.75000 460.00| INSTALL CHEVRONS | | | 0131 2020.00 42.000 m2 | 36.00000 1512.00| 19.05700 800.39| SPECIAL SURFACE COURSE FOR MAILBOX | | | TURNOUTS | | | 0132 2020.50 155.000 m2 | 38.00000 5890.00| 51.61600 8000.48| SURFACING | | | 0133 2021.00 3.000 EACH| 50.00000 150.00| 57.50000 172.50| MAILBOX POST | | | 0134 4004.50 2592.000 kg | 4.40000 11404.80| 2.80400 7267.97| CAST IRON GRATE AND FRAME | | | 0135 4105.59 16.160 m3 | 700.00000 11312.00| 1175.61900 18998.00| CLASS 47B-20 CONCRETE FOR INLET AND | | | JUNCTION BOX | | | 0136 4155.50 683.600 kg | 8.00000 5468.80| 2.48000 1695.33| REINFORCING STEEL FOR INLET AND | | | JUNCTION BOX | | | 0137 7502.04 4170.000 m | 6.20000 25854.00| 8.51000 35486.70| 100 mm WHITE PREFORMED PAVEMENT MARKING,| | | TYPE 4 | | | 0138 7503.04 3310.000 m | 6.35000 21018.50| 8.62500 28548.75| 100 mm YELLOW PREFORMED PAVEMENT | | | MARKING, TYPE 4 | | | 0139 8008.00 261.000 m3 | 48.00000 12528.00| 120.02300 31326.00| ARMOR COAT AGGREGATE | | | 0140 8051.00 245.000 m3 | 22.00000 5390.00| 34.50000 8452.50| SOIL BINDER | | | 0141 8070.08 621.000 m3 | 16.00000 9936.00| 6.48100 4024.70| MINERAL FILLER FOR BITUMINOUS SAND BASE | | | COURSE | | | NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 12 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0142 9004.90 3378.000 m2 | 3.85000 13005.30| 3.49200 11795.98| COLD IN-PLACE RECYCLING | | | 0143 9005.21 500.000 m2 | 15.00000 7500.00| 8.82500 4412.50| PATCHING BITUMINOUS SAND | | | 0144 9009.87 125.000 m2 | 8.75000 1093.75| 56.07400 7009.25| SURFACING 200mm | | | 0145 9030.00 1200.000 m | 16.00000 19200.00| 8.19900 9838.80| CONSTRUCTING ASPHALTIC CONCRETE CURB | | | 0146 9052.00 44.704 kL | 345.00000 15422.88| 343.29700 15346.75| ARMOR COAT EMULSIFIED ASPHALT | | | 0147 9052.50 279.478 kL | 345.00000 96419.91| 288.63800 80667.97| BITUMINOUS SAND BASE COURSE EMULSIFIED | | | ASPHALT | | | 0148 9053.20 1800.000 L | 1.25000 2250.00| 0.79500 1431.00| FOG SEAL | | | 0149 9053.90 104467.000 L | 0.34000 35518.78| 0.28900 30190.96| EMULSIFIED ASPHALT FOR COLD IN-PLACE | | | RECYCLING | | | 0150 9111.00 283.000 kL | 4.00000 1132.00| 3.21800 910.69| WATER | | | 0151 9111.25 80.000 kL | 8.00000 640.00| 17.36500 1389.20| WATER FOR COLD IN-PLACE RECYCLING, | | | APPLIED | | | 0152 9170.00 7.400 StaM| 265.00000 1961.00| 318.73600 2358.65| EARTH SHOULDER CONSTRUCTION | | | 0153 9179.24 10.347 StaM| 1875.00000 19400.63| 2240.20500 23179.40| COLD MILLING, CLASS 4 | | | 0154 9188.01 720.000 m2 | 12.00000 8640.00| 30.66700 22080.24| BITUMINOUS SURFACE COURSE | | | 0155 9188.50 536.000 m2 | 32.00000 17152.00| 28.64300 15352.65| SURFACING UNDER GUARDRAIL | | | 0156 9261.00 14.418 StaM| 2200.00000 31719.60| 4372.52000 63042.99| BITUMINOUS SAND BASE COURSE | | | SECTION TOTALS | $ 441,848.65| $ 459,130.98| ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION 0010 GROUP 10 GENERAL ITEMS | | | 0157 0001.08 5125.000 BDAY| 0.50000 2562.50| 0.50000 2562.50| BARRICADE, TYPE II | | | NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 13 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- 0158 0001.10 4340.000 BDAY| 1.65000 7161.00| 1.89800 8237.32| BARRICADE, TYPE III | | | 0159 0001.30 1196.000 LDAY| 1.35000 1614.60| 1.55300 1857.39| TYPE B HIGH INTENSITY WARNING LIGHT | | | 0160 0001.75 60.000 EACH| 10.00000 600.00| 11.50000 690.00| TEMPORARY SIGN DAY | | | 0161 0001.90 14602.000 EACH| 0.35000 5110.70| 0.40300 5884.61| SIGN DAY | | | 0162 0002.30 1550.000 m | 2.00000 3100.00| 2.30000 3565.00| PAVEMENT MARKING REMOVAL | | | 0163 0002.31 750.000 m | 1.50000 1125.00| 1.72500 1293.75| TEMPORARY PAVEMENT MARKING | | | 0164 0002.39 1000.000 m | 2.00000 2000.00| 2.30000 2300.00| TEMPORARY PAVEMENT MARKING, TYPE II | | | 0165 0003.10 20.000 DAY | 220.00000 4400.00| 230.00000 4600.00| FLAGGING | | | 0166 0003.51 126.000 m | 36.00000 4536.00| 97.65900 12305.03| INSTALL CONCRETE PROTECTION BARRIER | | | 0167 0003.56 84.000 m | 12.00000 1008.00| 37.78600 3174.02| RELOCATE CONCRETE PROTECTION BARRIER | | | 0168 0003.70 4.000 EACH| 400.00000 1600.00| 460.00000 1840.00| TEMPORARY RUMBLE STRIP | | | 0169 0003.75 1.000 EACH| 14000.00000 14000.00| 16100.00000 16100.00| TEMPORARY TRAFFIC SIGNAL | | | 0170 0010.04 1.000 EACH| 2500.00000 2500.00| 6900.00000 6900.00| FIELD OFFICE | | | 0171 0020.00 1000.000 HOUR| 0.80000 800.00| 0.80000 800.00| TRAINING | | | 0172 0030.10 LUMP| 6000.00000 6000.00| 4255.00000 4255.00| MOBILIZATION | | | 0173 9110.01 40.000 HOUR| 85.00000 3400.00| 66.70000 2668.00| RENTAL OF LOADER, FULLY OPERATED | | | 0174 9110.02 50.000 HOUR| 65.00000 3250.00| 59.80000 2990.00| RENTAL OF MOTOR GRADER, FULLY OPERATED | | | 0175 9110.03 40.000 HOUR| 45.00000 1800.00| 48.30000 1932.00| RENTAL OF DUMP TRUCK, FULLY OPERATED | | | 0176 9110.07 40.000 HOUR| 35.00000 1400.00| 48.30000 1932.00| RENTAL OF SKID LOADER, FULLY OPERATED | | | NEBRASKA DEPARTMENT OF ROADS DATE : 08/02/02 PAGE : 14 TABULATION OF BIDS CALL ORDER : F14 CONTRACT ID : 5046 COUNTIES : SHERIDAN LETTING DATE : 08/01/02 1:30 PM DISTRICT : 5 PROJECT(S) : EACSTPD-250-4(101) S-87-4(1010) S-250-4(1002) ==================================================================================================================================== |(1) 2283 |(2) 2853 | |PERRETT CONSTRUCTION LTD. |SIMON CONTRACTORS AND SUBSID| LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- SECTION TOTALS | $ 67,967.80| $ 85,886.62| ------------------------------------------+----------------------------+----------------------------+------------------------------- CONTRACT TOTALS | $ 2,690,897.69| $ 2,862,704.96| ====================================================================================================================================