Plattsmouth - Bellevue US 75
Project #: NH-75-2(155) Control #: 21849

Text Only

Project Contacts:
Mike Owen, NDOR, 402-479-4735
Tony Kessler, NDOR, 402-479-3994

Views

We have tried to provide the map info in the best format for fastest download/viewing. Most are in DjVu, which reduces them even more. If you do not have the DjVu reader, please download the FREE READER by clicking on the DjVu button on the left sidebar.

If you do not have the PDF reader, please download the FREE READER by clicking on the Get Acrobat Reader button on the left sidebar.
 

Location Map  (DjVu)

Location Map Info Sheet (PDF)

Aerial of Proposed Construction (DjVu)
This is a preliminary plan ONLY - changes may occur

Proposed Construction : The proposed 6 miles of  improvements on US 75 begin 0.2 miles south of Oak Hill Road/Avenue "B" in Plattsmouth and extends north crossing the Platte River and ends at Fairview Road. Proposed improvements for this section of US 75 include reconstruction/widening of US 75 on improved alignment, bridge construction, and multiple County Road and Frontage Road improvements.

Lighting: Roadway Lighting will be provided at the new interchanges at Bay Road/Webster Blvd., Platteview Road, and Fairview Road.

Related Studies: US 75 Corridor Study, Nebraska City to Bellevue

Right-of-Way: Right-of-way, temporary construction easements, and new controlled access will need to be purchased at various locations along this project.

Phasing: Traffic will be maintained on the existing roadways during construction.  Detours are required on the various side roads.

Schedule: The project is scheduled to be let July 2008 and is expected to take 4 1/2 years to complete.

Estimated Cost: The current total cost for the project is $70,000,000.