Official State of Nebraska Web Site

 




 

link to general info and download DjVu
Regular Acrobat Reader Download
Help with PDF's for those with visual disabilities


 


Thedford South
NH-STPN-TMT-83-3(106)
Control # 61044

Text Only

Project Contacts:
Larry Legg, NDOR Roadway Design Unit Leader, 402-479-3943

Proposed Construction: This Project begins on US-83 South of the Middle Loup River to a new intersection with N-2, just East of Thedford. This includes a new bridge over the Middle Loup River on a new grade and alignment as well as a new Viaduct over the BNSF tracks and N-2 to provide a grade separation.

Right of Way: Right of way acquisition will be required throughout the Project.

Phasing: A temporary road on US-83 will be needed to keep approximately 800' of the current US-83, South of the existing crossing open during construction. No detour will be required.

Schedule: This Project is currently in the 5 yr. Program.

Estimated Cost: $ 5,500,000.