Yankton Bridge
Project #: DPS-NH-81-4(113)
Control #:
31315

Text Only

Project Contacts:
Mike Owen, Assistant Design Engineer, 402-479-4735
Tony Kessler
, Roadway Design Project Manager, 402-479-3994

Views of Proposed Construction

We have tried to provide the map info in the best format for fastest download/viewing. Most are in DjVu, which reduces them even more. If you do not have the DjVu reader, please download the FREE READER by clicking on the DjVu button on the left sidebar.

Proposed Construction : The proposed 2.1 miles of  improvements begin 0.4 miles south of the US 81 & N 121 junction and extends north crossing the Missouri River approximately 1000' upstream of the existing US 81 bridge and ending just south of the intersection of 2nd and Broadway in Yankton, SD. Proposed improvements for this section of US 81 include widening and new roadway construction, and construction of a new bridge over the Missouri River.

Lighting/Signals/Signing: Roadway Lighting will be provided along the entire project beginning at the US 81 & N 121 junction.  This will  include the proposed bridge and the urban section in Yankton, SD.

Related Studies: Yankton Bridge Replacement Study Corridor Report, December 2002.

Right-of-Way: Right-of-way, temporary construction easements, and new controlled access will need to be purchased at various locations along this project.

Phasing: This project will not require any detours. Traffic will be maintained on the existing roadway during construction.

Schedule: The project is scheduled to be let June 22, 2006 and is expected to take 3 years to complete.

Estimated Cost: The current total estimated cost for the project is $23,613,000.