Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0462 WEBB CONTRACTOR, INC./L. J.
Contract ID:1111X
Estimate Number:0003
Pay Period End Date:08.02.2003
Contract Location:
HUMBOLDT NORTHWESTEstimate Type:PROG
Contractor:
WEBB CONTRACTOR, INC./L. J.Date Let:12.19.2002
918 N 13TH STDate Awarded:01.03.2003
PO BOX 386Date Contract Executed:01.21.2003
Date Notice to Proceed:01.21.2003
GENEVA NE 68361-0386Date Work Began:
Phone:Date Physical Work Completed:
(402)759-4160Date Accepted:
Escrow Agent:
Surety Co:
UNIVERSAL SURETY COMPANY
Counties
RICHARDSON
Project Number PCT Fed State Project Number Description
12111 000  0.000 BRO-7074(17)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$74,645.45$16,124.00$58,521.45
$386,467.93Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$74,645.45$16,124.00$58,521.45
$384,584.97Retainage$-746.45$-161.24$-585.21
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
19.31%Net Earnings$73,899.00$15,962.76$57,936.24
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$73,899.00$15,962.76$57,936.24
Project ManagerDiv. Head/Dist. Eng.
Hitzeman, Don08.13.2003Sklenar, Michael J08.15.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve08.15.2003
Controller Div. Processed
Burling, Laurie08.18.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 8+84
0001                          0001.10 1.002,295.0002,295.00
BARRICADE, TYPE III BDAY2,295.0002,295.00
372.000372.00
168.000168.00

0002                          0001.90 0.502,142.0001,071.00
SIGN DAY EACH2,142.0001,071.00
272.000136.00
112.00056.00

0003                          0001.98 1.001,071.0001,071.00
CONTRACTOR FURNISHED SIGN EACH1,071.0001,071.00
68.00068.00
28.00028.00

0004                          0030.60 23,000.001.00023,000.00
MOBILIZATION LS 1.00023,000.00
1.00023,000.00
1.00023,000.00

0005                          1000.00 150.001.000150.00
LARGE TREE REMOVAL EACH1.000150.00
2.000300.00
0.0000.00

0006                          1009.00 3,000.001.0003,000.00
GENERAL CLEARING AND GRUBBING LS 1.0003,000.00
0.5001,500.00
0.0000.00

0007                          1011.00 15.00279.0004,185.00
WATER kL 279.0004,185.00
0.0000.00
0.0000.00

0008                          1030.00 2.807,981.00022,346.80
EARTHWORK MEASURED IN EMBANKMENT m3 7,981.00022,346.80
0.0000.00
0.0000.00

0009                          1043.50 2.40978.0002,347.20
RIPRAP FILTER FABRIC m2 978.0002,347.20
0.0000.00
0.0000.00

0010                          2009.51 375.004.7171,768.87
CRUSHED ROCK EMBEDMENT StaM4.7171,768.87
0.0000.00
0.0000.00

0011                          2010.03 16.07408.0006,556.56
CRUSHED ROCK SURFACE COURSE Mg 408.0006,556.56
0.0000.00
0.0000.00

0012                          4045.00 500.001.000500.00
REMOVE STRUCTURE EACH1.000500.00
AT STA. 8+35.4 LT. 0.0000.00
0.0000.00

0013                          4050.01 3.001,010.0003,030.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS m3 1,010.0003,030.00
0.0000.00
0.0000.00

0014                          4300.30 85.0051.7004,394.50
750 mm CULVERT PIPE m 51.7004,394.50
0.0000.00
0.0000.00

0015                          4300.36 98.0021.0002,058.00
900 mm CULVERT PIPE m 21.0002,058.00
0.0000.00
0.0000.00

0016                          4300.48 190.0078.20014,858.00
1200 mm CULVERT PIPE m 78.20014,858.00
0.0000.00
0.0000.00

0017                          4310.30 258.001.000258.00
750 mm FLARED-END SECTION EACH1.000258.00
0.0000.00
0.0000.00

0018                          4310.36 410.002.000820.00
900 mm FLARED-END SECTION EACH2.000820.00
0.0000.00
0.0000.00

0019                          4310.48 1,100.003.0003,300.00
1200 mm FLARED-END SECTION EACH3.0003,300.00
0.0000.00
0.0000.00

0020                          6000.10 2,500.001.0002,500.00
ABUTMENT NO.1 EXCAVATION LS 1.0002,500.00
1.0002,500.00
1.0002,500.00

0021                          6000.11 2,500.001.0002,500.00
ABUTMENT NO.2 EXCAVATION LS 1.0002,500.00
0.0000.00
0.0000.00

0022                          6001.50 5,000.001.0005,000.00
BENT NO.1 EXCAVATION LS 1.0005,000.00
1.0005,000.00
0.0000.00

0023                          6001.51 5,000.001.0005,000.00
BENT NO.2 EXCAVATION LS 1.0005,000.00
0.0000.00
0.0000.00

0024                          6010.22 379.30174.90066,339.57
CLASS 47B-20 CONCRETE FOR BRIDGE m3 174.90066,339.57
43.45016,480.59
43.45016,480.59

0025                          6010.26 359.69224.00080,570.56
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 224.00080,570.56
0.0000.00
0.0000.00

0026                          6020.00 1.2128,560.00034,557.60
REINFORCING STEEL FOR BRIDGE kg 28,560.00034,557.60
1,100.0001,331.00
1,100.0001,331.00

0027                          6040.00 10,000.001.00010,000.00
REMOVE STRUCTURE EACH1.00010,000.00
AT STA. 8+89.5 0.9009,000.00
0.0000.00

0028                          6080.00 5.511,260.0006,942.60
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 1,260.0006,942.60
328.0001,807.28
328.0001,807.28

0029                          6105.02 28.66908.00026,023.28
ROCK RIPRAP, TYPE B Mg 908.00026,023.28
0.0000.00
0.0000.00

0030                          6210.50 85.30441.40037,651.42
PIPE PILING m 441.40037,651.42
133.17011,359.40
133.17011,359.40

0031                          7020.00 1,240.004.0004,960.00
BRIDGE APPROACH SECTIONS EACH4.0004,960.00
0.0000.00
0.0000.00

0032                          7021.47 1,220.004.0004,880.00
MELT EACH4.0004,880.00
0.0000.00
0.0000.00

0033                          L006.00 325.002.000650.00
COVER CROP SEEDING ha 2.000650.00
0.0000.00
0.0000.00

6001                          2017.01 25.280.0000.00
CRUSHED ROCK m3 7.000176.96
Crushed Rock for Bridge Bent Foundation Footings 3.37085.19
3.37085.19

6002                          6210.61 426.500.0000.00
PILE SPLICE EACH4.0001,706.00
Pipe Piling Splice 4.0001,706.00
4.0001,706.00

GROUP 6 BRIDGE AT STA. 8+84Contracted384,584.96
Current386,467.92
In place74,645.46
This Estimate58,521.46

Totals for contractContracted384,584.96
Current386,467.92
In place74,645.46
This Estimate58,521.46