| | | 1. Contracted
|
---|
| | | 2. Current
|
---|
| | | 3. To date
|
---|
Item Nbr Item Code | Unit Price | | 4. This Est
|
---|
Item Description | Units | Qty | Amount
|
---|
GROUP 6 BRIDGE AT STA. 8+84 | | |
|
0001 0001.10 | 1.00 | 2,295.000 | 2,295.00
|
BARRICADE, TYPE III | BDAY | 2,295.000 | 2,295.00
|
| | 372.000 | 372.00
|
| | 168.000 | 168.00
|
| | |
|
0002 0001.90 | 0.50 | 2,142.000 | 1,071.00
|
SIGN DAY | EACH | 2,142.000 | 1,071.00
|
| | 272.000 | 136.00
|
| | 112.000 | 56.00
|
| | |
|
0003 0001.98 | 1.00 | 1,071.000 | 1,071.00
|
CONTRACTOR FURNISHED SIGN | EACH | 1,071.000 | 1,071.00
|
| | 68.000 | 68.00
|
| | 28.000 | 28.00
|
| | |
|
0004 0030.60 | 23,000.00 | 1.000 | 23,000.00
|
MOBILIZATION | LS | 1.000 | 23,000.00
|
| | 1.000 | 23,000.00
|
| | 1.000 | 23,000.00
|
| | |
|
0005 1000.00 | 150.00 | 1.000 | 150.00
|
LARGE TREE REMOVAL | EACH | 1.000 | 150.00
|
| | 2.000 | 300.00
|
| | 0.000 | 0.00
|
| | |
|
0006 1009.00 | 3,000.00 | 1.000 | 3,000.00
|
GENERAL CLEARING AND GRUBBING | LS | 1.000 | 3,000.00
|
| | 0.500 | 1,500.00
|
| | 0.000 | 0.00
|
| | |
|
0007 1011.00 | 15.00 | 279.000 | 4,185.00
|
WATER | kL | 279.000 | 4,185.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0008 1030.00 | 2.80 | 7,981.000 | 22,346.80
|
EARTHWORK MEASURED IN EMBANKMENT | m3 | 7,981.000 | 22,346.80
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0009 1043.50 | 2.40 | 978.000 | 2,347.20
|
RIPRAP FILTER FABRIC | m2 | 978.000 | 2,347.20
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0010 2009.51 | 375.00 | 4.717 | 1,768.87
|
CRUSHED ROCK EMBEDMENT | StaM | 4.717 | 1,768.87
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0011 2010.03 | 16.07 | 408.000 | 6,556.56
|
CRUSHED ROCK SURFACE COURSE | Mg | 408.000 | 6,556.56
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0012 4045.00 | 500.00 | 1.000 | 500.00
|
REMOVE STRUCTURE | EACH | 1.000 | 500.00
|
AT STA. 8+35.4 LT. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0013 4050.01 | 3.00 | 1,010.000 | 3,030.00
|
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS | m3 | 1,010.000 | 3,030.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0014 4300.30 | 85.00 | 51.700 | 4,394.50
|
750 mm CULVERT PIPE | m | 51.700 | 4,394.50
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0015 4300.36 | 98.00 | 21.000 | 2,058.00
|
900 mm CULVERT PIPE | m | 21.000 | 2,058.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0016 4300.48 | 190.00 | 78.200 | 14,858.00
|
1200 mm CULVERT PIPE | m | 78.200 | 14,858.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0017 4310.30 | 258.00 | 1.000 | 258.00
|
750 mm FLARED-END SECTION | EACH | 1.000 | 258.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0018 4310.36 | 410.00 | 2.000 | 820.00
|
900 mm FLARED-END SECTION | EACH | 2.000 | 820.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0019 4310.48 | 1,100.00 | 3.000 | 3,300.00
|
1200 mm FLARED-END SECTION | EACH | 3.000 | 3,300.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0020 6000.10 | 2,500.00 | 1.000 | 2,500.00
|
ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 2,500.00
|
| | 1.000 | 2,500.00
|
| | 1.000 | 2,500.00
|
| | |
|
0021 6000.11 | 2,500.00 | 1.000 | 2,500.00
|
ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 2,500.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0022 6001.50 | 5,000.00 | 1.000 | 5,000.00
|
BENT NO.1 EXCAVATION | LS | 1.000 | 5,000.00
|
| | 1.000 | 5,000.00
|
| | 0.000 | 0.00
|
| | |
|
0023 6001.51 | 5,000.00 | 1.000 | 5,000.00
|
BENT NO.2 EXCAVATION | LS | 1.000 | 5,000.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0024 6010.22 | 379.30 | 174.900 | 66,339.57
|
CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 174.900 | 66,339.57
|
| | 43.450 | 16,480.59
|
| | 43.450 | 16,480.59
|
| | |
|
0025 6010.26 | 359.69 | 224.000 | 80,570.56
|
CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 224.000 | 80,570.56
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0026 6020.00 | 1.21 | 28,560.000 | 34,557.60
|
REINFORCING STEEL FOR BRIDGE | kg | 28,560.000 | 34,557.60
|
| | 1,100.000 | 1,331.00
|
| | 1,100.000 | 1,331.00
|
| | |
|
0027 6040.00 | 10,000.00 | 1.000 | 10,000.00
|
REMOVE STRUCTURE | EACH | 1.000 | 10,000.00
|
AT STA. 8+89.5 | | 0.900 | 9,000.00
|
| | 0.000 | 0.00
|
| | |
|
0028 6080.00 | 5.51 | 1,260.000 | 6,942.60
|
STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 1,260.000 | 6,942.60
|
| | 328.000 | 1,807.28
|
| | 328.000 | 1,807.28
|
| | |
|
0029 6105.02 | 28.66 | 908.000 | 26,023.28
|
ROCK RIPRAP, TYPE B | Mg | 908.000 | 26,023.28
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0030 6210.50 | 85.30 | 441.400 | 37,651.42
|
PIPE PILING | m | 441.400 | 37,651.42
|
| | 133.170 | 11,359.40
|
| | 133.170 | 11,359.40
|
| | |
|
0031 7020.00 | 1,240.00 | 4.000 | 4,960.00
|
BRIDGE APPROACH SECTIONS | EACH | 4.000 | 4,960.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0032 7021.47 | 1,220.00 | 4.000 | 4,880.00
|
MELT | EACH | 4.000 | 4,880.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0033 L006.00 | 325.00 | 2.000 | 650.00
|
COVER CROP SEEDING | ha | 2.000 | 650.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
6001 2017.01 | 25.28 | 0.000 | 0.00
|
CRUSHED ROCK | m3 | 7.000 | 176.96
|
Crushed Rock for Bridge Bent Foundation Footings | | 3.370 | 85.19
|
| | 3.370 | 85.19
|
| | |
|
6002 6210.61 | 426.50 | 0.000 | 0.00
|
PILE SPLICE | EACH | 4.000 | 1,706.00
|
Pipe Piling Splice | | 4.000 | 1,706.00
|
| | 4.000 | 1,706.00
|
| | |
|
GROUP 6 BRIDGE AT STA. 8+84 | | Contracted | 384,584.96
|
| | Current | 386,467.92
|
| | In place | 74,645.46
|
| | This Estimate | 58,521.46
|
| | |
|
Totals for contract | | Contracted | 384,584.96
|
---|
| | Current | 386,467.92
|
---|
| | In place | 74,645.46
|
---|
| | This Estimate | 58,521.46
|
---|