Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:1344 DOBSON BROTHERS CONSTRUCTION COMPANY
Contract ID:1548X
Estimate Number:0007
Pay Period End Date:04.19.2002
Contract Location:
NW 48TH ST. EAST, LINCOLNEstimate Type:FINL
Contractor:
DOBSON BROTHERS CONSTRUCTION COMPANYDate Let:05.03.2001
410 SOUTH 7THDate Awarded:05.09.2001
PO BOX 81409Date Contract Executed:05.21.2001
Date Notice to Proceed:05.21.2001
LINCOLN NE 68501Date Work Began:06.13.2001
Phone:Date Physical Work Completed:
(402)474-5115Date Accepted:
Escrow Agent:
Surety Co:
NATIONAL FIRE INSURANCE COMPANY OF HARTFORD
Counties
LANCASTER
Project Number PCT Fed State Project Number Description
12548 000  0.000 RD-6-6(1035)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$447,347.04$446,608.76$738.28
$395,058.19Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$447,347.04$446,608.76$738.28
$325,205.65Retainage$.00$-4,466.09$4,466.09
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
113.24%Net Earnings$447,347.04$442,142.67$5,204.37
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$447,347.04$442,142.67$5,204.37
Project ManagerDiv. Head/Dist. Eng.
Niazi, Babrak04.19.2002Sklenar, Michael J04.22.2002
Constr. Estimate Eng.Materials Eng.
Davis, Carl04.30.2002Hall, David05.01.2002
Controller Div. Processed
Harring, Joyce05.16.2002
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0001                          0001.08 0.502,242.0001,121.00
BARRICADE, TYPE II BDAY2,242.0001,121.00
2,054.0001,027.00
285.000142.50

0002                          0001.10 1.02238.000242.76
BARRICADE, TYPE III BDAY238.000242.76
259.000264.18
37.00037.74

0003                          0001.30 1.02204.000208.08
TYPE B HIGH INTENSITY WARNING LIGHT LDAY204.000208.08
196.000199.92
31.00031.62

0004                          0001.90 0.412,213.000907.33
SIGN DAY EACH2,213.000907.33
1,231.000504.71
180.00073.80

0005                          0002.40 9.69305.0002,955.45
TEMPORARY SOLID LINES STA 305.0002,955.45
275.4802,669.40
0.0000.00

0006                          0002.45 9.69378.0003,662.82
TEMPORARY BROKEN LINES STA 378.0003,662.82
162.7501,577.05
0.0000.00

0007                          0002.97 22.4430.000673.20
FLASHING ARROW PANEL DAY 30.000673.20
50.0001,122.00
6.000134.64

0008                          0003.10 158.2930.0004,748.70
FLAGGING DAY 30.0004,748.70
42.5006,727.33
2.000316.58

0009                          0010.04 500.001.000500.00
FIELD OFFICE EACH1.000500.00
0.0000.00
0.0000.00

0010                          0030.90 13,000.001.00013,000.00
MOBILIZATION LS 1.00013,000.00
1.00013,000.00
0.0000.00

0011                          3040.12 92.3258.5005,400.72
CONCRETE PAVEMENT REPAIR, TYPE B, FULL DEPTH SY 58.5005,400.72
122.83311,339.95
0.0000.00

0012                          3040.13 91.4348.9004,470.93
CONCRETE PAVEMENT REPAIR, TYPE C, FULL DEPTH SY 48.9004,470.93
141.32712,921.53
0.0000.00

0013                          3221.05 94.3369.7006,574.80
CONCRETE PAVEMENT, CLASS PR-3625 SY 69.7006,574.80
JOINT REPAIR 74.1326,992.88
0.0000.00

0014                          9005.00 31.57100.0003,157.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 100.0003,157.00
SP5(0.5) 669.20021,126.64
0.0000.00

0015                          9005.55 23.035,880.000135,416.40
ASPHALTIC CONCRETE, TYPE SP5(0.5) TON 7,560.870174,126.84
7,560.870174,126.84
0.0000.00

0016                          9021.06 240.00322.92077,500.80
PERFORMANCE GRADED BINDER (70-34) TON 322.92077,500.80
386.08292,659.68
0.0000.00

0017                          9053.00 0.649,220.0005,900.80
TACK COAT GAL 9,220.0005,900.80
6,900.0004,416.00
0.0000.00

0018                          9110.01 50.0010.000500.00
RENTAL OF LOADER, FULLY OPERATED HOUR17.000850.00
21.8641,093.20
0.0000.00

0019                          9110.02 50.0010.000500.00
RENTAL OF MOTOR GRADER, FULLY OPERATED HOUR10.000500.00
13.000650.00
0.0000.00

0020                          9110.03 45.0010.000450.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR17.000765.00
32.5001,462.50
0.0000.00

0021                          9110.07 34.0010.000340.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR24.000816.00
25.000850.00
0.0000.00

0022                          9179.33 1.2634,745.00043,778.70
COLD MILLING, CLASS 3 SY 34,745.00043,778.70
38,356.13948,328.74
0.0000.00

0023                          9179.53 0.8715,168.00013,196.16
COLD MILLING, CLASS 3 SY 15,168.00013,196.16
TYPE A 16,679.55614,511.21
0.0000.00

4001                          9110.17 35.000.0000.00
RENTAL OF SELF PROPELLED BROOM, F.O. HOUR7.000245.00
Broyce Broom 7.000245.00
0.0000.00

4002                          9110.16 200.000.0000.00
RENTAL OF MILLING MACHINE, FULLY OPERATED HOUR8.0001,600.00
Rental of Milling Machine 8.0001,600.00
0.0000.00

4003                          9021.04 225.000.0000.00
PERFORMANCE GRADED BINDER (70-28) TON 69.18915,567.52
Perf Graded Binder (70-28) 68.18915,342.53
0.0000.00

4004                          A007.15 525.000.0000.00
VEHICLE DETECTOR, TYPE TD-5 EACH15.0007,875.00
Installed 15.0007,875.00
0.0000.00

600                           9300.56 4,712.200.0000.00
SUPERPAVE QUALITY INCENTIVE TON 0.0000.00
Superpave Quality Incentive 0.0000.00
-1.000-4,712.20

6001                          9300.56 0.623420.0000.00
SUPERPAVE QUALITY INCENTIVE TON 7,560.8704,713.60
Superpave Quality Incentive ( Revised ) 7,560.8704,713.60
7,560.8704,713.60

GROUP 9 BITUMINOUSContracted325,205.65
Current395,058.21
In place447,346.89
This Estimate738.28

Totals for contractContracted325,205.65
Current395,058.21
In place447,346.89
This Estimate738.28