Vendor ID:1730 WILKE CONTRACTING CORPORATION
Contract ID:1625
Estimate Number:0004
Pay Period End Date:12.04.2002
Contract Location:
LINCOLN EAST BRIDGE (EB)Estimate Type:FINL
Contractor:
WILKE CONTRACTING CORPORATIONDate Let:04.18.2002
27705 115TH ROADDate Awarded:04.29.2002
PO BOX 1205Date Contract Executed:05.07.2002
Date Notice to Proceed:05.07.2002
KEARNEY NE 68848Date Work Began:07.29.2002
Phone:Date Physical Work Completed:
(308)236-9014Date Accepted:
Escrow Agent:
Surety Co:
AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA
Counties
LANCASTER
Project Number PCT Fed State Project Number Description
12625 000  0.000 STR-80-9(1134)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$79,921.09$79,921.09$.00
$121,928.00Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$79,921.09$79,921.09$.00
$121,928.00Retainage$.00$-799.21$799.21
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
65.55%Net Earnings$79,921.09$79,121.88$799.21
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$79,921.09$79,121.88$799.21
Project ManagerDiv. Head/Dist. Eng.
Niazi, Babrak12.23.2002Sklenar, Michael J12.23.2002
Constr. Estimate Eng.Materials Eng.
Davis, Carl02.06.2003Hall, David02.06.2003
Controller Div. Processed
Harring, Joyce02.18.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 699+40
0001                          0001.08 0.501,134.000567.00
BARRICADE, TYPE II BDAY1,134.000567.00
648.000324.00
0.0000.00

0002                          0001.10 1.00108.000108.00
BARRICADE, TYPE III BDAY108.000108.00
75.00075.00
0.0000.00

0003                          0001.30 1.0054.00054.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY54.00054.00
75.00075.00
0.0000.00

0004                          0001.90 1.00756.000756.00
SIGN DAY EACH756.000756.00
490.000490.00
0.0000.00

0005                          0002.30 0.603,000.0001,800.00
PAVEMENT MARKING REMOVAL LF 3,000.0001,800.00
3,960.0002,376.00
0.0000.00

0006                          0002.31 0.407,000.0002,800.00
TEMPORARY PAVEMENT MARKING LF 7,000.0002,800.00
4,390.0001,756.00
0.0000.00

0007                          0002.97 90.0027.0002,430.00
FLASHING ARROW PANEL DAY 27.0002,430.00
25.0002,250.00
0.0000.00

0008                          0003.51 14.00420.0005,880.00
INSTALL CONCRETE PROTECTION BARRIER LF 420.0005,880.00
420.0005,880.00
0.0000.00

0009                          0003.56 5.00420.0002,100.00
RELOCATE CONCRETE PROTECTION BARRIER LF 420.0002,100.00
420.0002,100.00
0.0000.00

0010                          0003.57 1,000.001.0001,000.00
RELOCATE INERTIAL BARRIER SYSTEM EACH1.0001,000.00
1.0001,000.00
0.0000.00

0011                          0003.58 3,000.001.0003,000.00
INERTIAL BARRIER SYSTEM EACH1.0003,000.00
1.0003,000.00
0.0000.00

0012                          0003.64 450.005.0002,250.00
REPLACEMENT MODULE EACH5.0002,250.00
0.0000.00
0.0000.00

0013                          0030.60 7,000.001.0007,000.00
MOBILIZATION LS 1.0007,000.00
1.0007,000.00
0.0000.00

0014                          6007.01 48.00346.00016,608.00
CLASS I REPAIR SY 346.00016,608.00
346.22216,618.66
0.0000.00

0015                          6007.02 155.00208.00032,240.00
CLASS II REPAIR SY 208.00032,240.00
62.7109,720.05
0.0000.00

0016                          6007.03 200.005.0001,000.00
CLASS III REPAIR SY 5.0001,000.00
4.000800.00
0.0000.00

0017                          6008.40 40.00346.00013,840.00
PLACING, FINISHING, AND CURING CONCRETE OVERLAY-SF SY 346.00013,840.00
346.22213,848.88
0.0000.00

0018                          6016.02 410.0069.50028,495.00
CONCRETE FOR OVERLAYS-SF CY 69.50028,495.00
30.75012,607.50
0.0000.00

GROUP 6 BRIDGE AT STA. 699+40Contracted121,928.00
Current121,928.00
In place79,921.09
This Estimate0.00

Totals for contractContracted121,928.00
Current121,928.00
In place79,921.09
This Estimate0.00