Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0477 WESTERN ENGINEERING COMPANY, INC.
Contract ID:2717
Estimate Number:0003
Pay Period End Date:09.13.2003
Contract Location:
FREMONT SOUTHEASTEstimate Type:PROG
Contractor:
WESTERN ENGINEERING COMPANY, INC.Date Let:11.14.2002
1149 WEST HIGHWAY 44Date Awarded:12.02.2002
PO BOX 350Date Contract Executed:12.26.2002
Date Notice to Proceed:12.26.2002
HARLAN IA 51537Date Work Began:08.05.2003
Phone:Date Physical Work Completed:
(712)755-5191Date Accepted:
Escrow Agent:
Surety Co:
HARTFORD FIRE INSURANCE COMPANY
Counties
DODGE
Project Number PCT Fed State Project Number Description
21717 000  0.000 STPE-3458(1)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$525,047.60$240,130.24$284,917.36
$642,430.19Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$525,047.60$240,130.24$284,917.36
$642,430.19Retainage$-5,250.48$-2,401.30$-2,849.18
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
81.73%Net Earnings$519,797.12$237,728.94$282,068.18
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$519,797.12$237,728.94$282,068.18
Project ManagerDiv. Head/Dist. Eng.
Jacobs, Micky09.18.2003Lech, Marvin (Marv)09.18.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve09.18.2003
Controller Div. Processed
Burling, Laurie09.19.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0001                          0001.08 0.5021,350.00010,675.00
BARRICADE, TYPE II BDAY21,350.00010,675.00
6,980.0003,490.00
4,993.0002,496.50

0002                          0001.10 2.00244.000488.00
BARRICADE, TYPE III BDAY244.000488.00
332.000664.00
168.000336.00

0003                          0001.75 1.00854.000854.00
TEMPORARY SIGN DAY EACH854.000854.00
105.000105.00
57.00057.00

0004                          0001.90 0.503,538.0001,769.00
SIGN DAY EACH3,538.0001,769.00
4,108.0002,054.00
2,120.0001,060.00

0005                          0002.55 7.00736.6605,156.62
OVERLAY BROKEN LINES STA 736.6605,156.62
774.6205,422.34
157.4001,101.80

0006                          0002.60 7.001,473.32010,313.24
OVERLAY SOLID LINES STA 1,473.32010,313.24
1,474.20010,319.40
673.8904,717.23

0007                          0003.10 200.0040.0008,000.00
FLAGGING DAY 40.0008,000.00
52.00010,400.00
13.0002,600.00

0008                          0010.04 1,200.001.0001,200.00
FIELD OFFICE EACH1.0001,200.00
0.0000.00
0.0000.00

0009                          0030.90 10,000.001.00010,000.00
MOBILIZATION LS 1.00010,000.00
1.00010,000.00
0.5005,000.00

0010                          2020.00 8.00904.0007,232.00
SPECIAL SURFACE COURSE FOR MAILBOX TURNOUTS SY 904.0007,232.00
234.0001,872.00
234.0001,872.00

0011                          2021.00 125.0036.0004,500.00
MAILBOX POST EACH36.0004,500.00
0.0000.00
0.0000.00

0012                          9005.00 30.00355.00010,650.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 355.00010,650.00
SP2(0.5) 90.7402,722.20
-0.450-13.50

0013                          9005.30 18.5017,870.000330,595.00
ASPHALTIC CONCRETE, TYPE SP2(0.5) TON 17,870.000330,595.00
17,889.280330,951.68
6,946.680128,513.58

0014                          9009.00 3.001,507.0004,521.00
PLACEMENT OF ASPHALTIC CONCRETE FOR DRIVEWAYS ANDINTERSECTIONS SY 1,507.0004,521.00
2,849.4608,548.38
2,449.9307,349.79

0015                          9021.01 172.00984.150169,273.80
PERFORMANCE GRADED BINDER (64-22) TON 984.150169,273.80
696.680119,828.96
696.680119,828.96

0016                          9034.00 2.00563.0001,126.00
PREPARATION OF INTERSECTIONS AND DRIVEWAYS SY 563.0001,126.00
638.7601,277.52
824.0001,648.00

0017                          9053.00 0.9018,050.00016,245.00
TACK COAT GAL 18,050.00016,245.00
7,070.0006,363.00
2,590.0002,331.00

0018                          9110.01 60.0030.0001,800.00
RENTAL OF LOADER, FULLY OPERATED HOUR30.0001,800.00
0.0000.00
0.0000.00

0019                          9110.02 60.0030.0001,800.00
RENTAL OF MOTOR GRADER, FULLY OPERATED HOUR30.0001,800.00
20.0001,200.00
1.00060.00

0020                          9110.03 45.0030.0001,350.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR30.0001,350.00
16.500742.50
0.0000.00

0021                          9110.07 35.0030.0001,050.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR30.0001,050.00
25.000875.00
0.0000.00

0022                          9111.00 2.00184.000368.00
WATER MGAL184.000368.00
0.0000.00
0.0000.00

0023                          9170.00 59.00736.67043,463.53
EARTH SHOULDER CONSTRUCTION STA 736.67043,463.53
139.1808,211.62
101.0005,959.00

GROUP 9 BITUMINOUSContracted642,430.19
Current642,430.19
In place525,047.60
This Estimate284,917.36

Totals for contractContracted642,430.19
Current642,430.19
In place525,047.60
This Estimate284,917.36