| | Detailed breakdown of stockpiled materials | |
|
---|
Est Nbr: | 0003 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0044 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Initial Payment | 12,832.69 | 1978
|
| | Reinforcing Steel | |
|
| | S.P. Adjustment | -898.99 | 1978
|
| | Reinforcing Steel | |
|
| | S.P. Initial Payment | 7,067.90 | 1972
|
| | Reinforcing Steel | |
|
| | S.P. Adjustment | -898.99 | 1972
|
| | Reinforcing Steel | |
|
| | Total for estimate 0003: | 18,102.61 |
|
Est Nbr: | 0004 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0044 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Initial Payment | 6,168.92 | 1972
|
| | Reinforcing Steel | |
|
| | S.P. Closure | -6,168.91 | 1972
|
| | Reinforcing Steel | |
|
0051 | 7019.50 | IMPACT ATTENUATOR | |
|
| | S.P. Initial Payment | 17,200.00 | 20139
|
| | Impact Attenuator | |
|
| | Total for estimate 0004: | 17,200.01 |
|
Est Nbr: | 0005 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0035 | 6005.35 | PRECOMPRESSED POLYURETHANE FOAM JOINT | |
|
| | S.P. Initial Payment | 4,029.00 | 690713
|
| | Precompressed Poly Foam Joint | |
|
0044 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -908.48 | 1978
|
| | Reinforcing Steel | |
|
| | Total for estimate 0005: | 3,120.52 |
|
Est Nbr: | 0006 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0044 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -10,712.06 | 1978
|
| | Reinforcing Steel | |
|
| | Total for estimate 0006: | -10,712.06 |
|
Est Nbr: | 0007 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0035 | 6005.35 | PRECOMPRESSED POLYURETHANE FOAM JOINT | |
|
| | S.P. Adjustment | -1,659.00 | 690713
|
| | Precompressed Poly Foam Joint | |
|
0044 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -313.16 | 1978
|
| | Reinforcing Steel | |
|
| | S.P. Adjustment | -975.89 | 1972
|
| | Reinforcing Steel | |
|
0051 | 7019.50 | IMPACT ATTENUATOR | |
|
| | S.P. Adjustment | -8,600.00 | 20139
|
| | Impact Attenuator | |
|
| | Total for estimate 0007: | -11,548.05 |
|
Est Nbr: | 0009 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0044 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -982.00 | 1972
|
| | Reinforcing Steel | |
|
| | S.P. Initial Payment | 11,914.59 | 2586
|
| | Reinforcing Steel | |
|
| | Total for estimate 0009: | 10,932.59 |
|
Est Nbr: | 0010 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0044 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -412.30 | 1972
|
| | Reinforcing Steel | |
|
| | Total for estimate 0010: | -412.30 |
|
Est Nbr: | 0011 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0044 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -558.56 | 1972
|
| | Reinforcing Steel | |
|
| | Total for estimate 0011: | -558.56 |
|
Est Nbr: | 0012 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0044 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -3,240.17 | 1972
|
| | Reinforcing Steel | |
|
| | S.P. Adjustment | -8,984.80 | 2586
|
| | Reinforcing Steel | |
|
| | Total for estimate 0012: | -12,224.97 |
|
Est Nbr: | 0013 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0044 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -1,223.11 | 2586
|
| | Reinforcing Steel | |
|
| | Total for estimate 0013: | -1,223.11 |
|
Est Nbr: | 0014 | | |
|
Item Nbr | Item Cd | Item Desc | Adj Amt | Invoice Nbr
|
0035 | 6005.35 | PRECOMPRESSED POLYURETHANE FOAM JOINT | |
|
| | S.P. Adjustment | -1,185.00 | 690713
|
| | Precompressed Poly Foam Joint | |
|
0044 | 6131.50 | EPOXY COATED REINFORCING STEEL | |
|
| | S.P. Adjustment | -1,706.69 | 2586
|
| | Reinforcing Steel | |
|
0051 | 7019.50 | IMPACT ATTENUATOR | |
|
| | S.P. Adjustment | -8,600.00 | 20139
|
| | Impact Attenuator | |
|
| | Total for estimate 0014: | -11,491.69 |
|
| | Total remaining for contract: | 1,184.99 |
|
---|
| | | 1. Contracted
|
---|
| | | 2. Current
|
---|
| | | 3. To date
|
---|
Item Nbr Item Code | Unit Price | | 4. This Est
|
---|
Item Description | Units | Qty | Amount
|
---|
GROUP 6 BRIDGE AT STA. 13+99.54 | | |
|
0001 L020.00 | 2.41 | 536.000 | 1,291.76
|
EROSION CONTROL | SY | 536.000 | 1,291.76
|
| | 6,002.000 | 14,464.82
|
| | 6,002.000 | 14,464.82
|
| | |
|
0002 0001.08 | 0.50 | 11,382.000 | 5,691.00
|
BARRICADE, TYPE II | BDAY | 11,382.000 | 5,691.00
|
| | 16,618.000 | 8,309.00
|
| | 160.000 | 80.00
|
| | |
|
0003 0001.10 | 3.58 | 1,751.000 | 6,268.58
|
BARRICADE, TYPE III | BDAY | 1,751.000 | 6,268.58
|
| | 9,913.000 | 35,488.54
|
| | 61.000 | 218.38
|
| | |
|
0004 0001.90 | 0.28 | 8,276.000 | 2,317.28
|
SIGN DAY | EACH | 8,276.000 | 2,317.28
|
| | 17,730.000 | 4,964.40
|
| | 426.000 | 119.28
|
| | |
|
0005 0002.30 | 0.27 | 2,800.000 | 756.00
|
PAVEMENT MARKING REMOVAL | LF | 2,800.000 | 756.00
|
| | 7,890.000 | 2,130.31
|
| | 2,313.500 | 624.65
|
| | |
|
0006 0002.44 | 0.05 | 24,000.000 | 1,200.00
|
TEMPORARY PAVEMENT MARKING, TYPE PAINT | LF | 24,000.000 | 1,200.00
|
| | 10,257.000 | 512.85
|
| | 753.000 | 37.65
|
| | |
|
0007 0002.47 | 0.87 | 2,000.000 | 1,740.00
|
TEMPORARY PAVEMENT MARKING SURFACE PREPARATION | LF | 2,000.000 | 1,740.00
|
| | 5,627.000 | 4,895.49
|
| | 0.000 | 0.00
|
| | |
|
0008 0002.48 | 0.66 | 620.000 | 409.20
|
TEMPORARY RAISED PAVEMENT MARKER | EACH | 620.000 | 409.20
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0009 0002.85 | 53.01 | 20.000 | 1,060.20
|
TUBULAR POST | EACH | 20.000 | 1,060.20
|
| | 16.000 | 848.16
|
| | 0.000 | 0.00
|
| | |
|
0010 0002.97 | 6.33 | 542.000 | 3,430.86
|
FLASHING ARROW PANEL | DAY | 542.000 | 3,430.86
|
| | 509.000 | 3,221.97
|
| | -7.000 | -44.31
|
| | |
|
0011 0003.10 | 54.53 | 60.000 | 3,271.80
|
FLAGGING | DAY | 60.000 | 3,271.80
|
| | 1.000 | 54.53
|
| | 0.000 | 0.00
|
| | |
|
0012 0003.51 | 3.22 | 1,040.000 | 3,348.80
|
INSTALL CONCRETE PROTECTION BARRIER | LF | 1,040.000 | 3,348.80
|
| | 1,620.000 | 5,216.40
|
| | 0.000 | 0.00
|
| | |
|
0013 0003.76 | 3,132.00 | 1.000 | 3,132.00
|
TEMPORARY TRAFFIC SIGNAL | EACH | 1.000 | 3,132.00
|
| | 1.000 | 3,132.00
|
| | 0.000 | 0.00
|
| | |
|
0014 0010.04 | 1,084.00 | 1.000 | 1,084.00
|
FIELD OFFICE | EACH | 1.000 | 1,084.00
|
| | 1.000 | 1,084.00
|
| | 0.000 | 0.00
|
| | |
|
0015 0020.00 | 0.80 | 1,000.000 | 800.00
|
TRAINING | HOUR | 1,000.000 | 800.00
|
| | 704.500 | 563.60
|
| | 0.000 | 0.00
|
| | |
|
0016 0030.60 | 105,811.00 | 1.000 | 105,811.00
|
MOBILIZATION | LS | 1.000 | 105,811.00
|
| | 1.000 | 105,811.00
|
| | 0.000 | 0.00
|
| | |
|
0017 1009.00 | 685.00 | 1.000 | 685.00
|
GENERAL CLEARING AND GRUBBING | LS | 1.000 | 685.00
|
| | 1.000 | 685.00
|
| | 0.000 | 0.00
|
| | |
|
0018 1011.00 | 1.00 | 2.000 | 2.00
|
WATER | MGAL | 2.000 | 2.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0019 1030.00 | 11.48 | 106.000 | 1,216.88
|
EARTHWORK MEASURED IN EMBANKMENT | CY | 106.000 | 1,216.88
|
| | 106.000 | 1,216.88
|
| | 106.000 | 1,216.88
|
| | |
|
0020 1043.50 | 1.21 | 207.000 | 250.47
|
RIPRAP FILTER FABRIC | SY | 207.000 | 250.47
|
| | 207.000 | 250.47
|
| | 0.000 | 0.00
|
| | |
|
0021 1101.00 | 4.81 | 768.000 | 3,694.08
|
REMOVE PAVEMENT | SY | 768.000 | 3,694.08
|
| | 825.000 | 3,968.25
|
| | 0.000 | 0.00
|
| | |
|
0022 1109.00 | 6.17 | 560.000 | 3,455.20
|
REMOVE CURB | LF | 560.000 | 3,455.20
|
| | 952.000 | 5,873.84
|
| | 0.000 | 0.00
|
| | |
|
0023 1122.01 | 2.78 | 566.000 | 1,573.48
|
REMOVE CONCRETE MEDIAN SURFACING | SY | 566.000 | 1,573.48
|
| | 971.940 | 2,701.99
|
| | 0.000 | 0.00
|
| | |
|
0024 2020.50 | 32.01 | 394.000 | 12,611.94
|
SURFACING | SY | 394.000 | 12,611.94
|
8" | | 785.720 | 25,150.90
|
| | 0.000 | 0.00
|
| | |
|
0025 3008.05 | 8.17 | 15.000 | 122.55
|
TIE BARS | EACH | 15.000 | 122.55
|
| | 177.000 | 1,446.09
|
| | 0.000 | 0.00
|
| | |
|
0026 3011.22 | 6.35 | 560.000 | 3,556.00
|
CONCRETE CLASS 47B-3000 CURB TYPE II | LF | 560.000 | 3,556.00
|
| | 1,096.500 | 6,962.78
|
| | 0.000 | 0.00
|
| | |
|
0027 3014.12 | 12.27 | 61.000 | 748.47
|
COMBINATION CONCRETE CLASS 47B-3625 CURB AND GUTTER | LF | 61.000 | 748.47
|
| | 53.000 | 650.31
|
| | 0.000 | 0.00
|
| | |
|
0028 3016.21 | 21.64 | 226.000 | 4,890.64
|
CONCRETE CLASS 47B-3000 SIDEWALKS | SY | 226.000 | 4,890.64
|
| | 218.140 | 4,720.55
|
| | 0.000 | 0.00
|
| | |
|
0029 3017.40 | 23.22 | 394.000 | 9,148.68
|
CONCRETE CLASS 47B-3000 MEDIAN SURFACING | SY | 394.000 | 9,148.68
|
| | 653.300 | 15,169.63
|
| | 0.000 | 0.00
|
| | |
|
0030 3050.15 | 163.61 | 392.200 | 64,167.84
|
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-4000 | CY | 392.200 | 64,167.84
|
| | 409.880 | 67,060.47
|
| | 0.000 | 0.00
|
| | |
|
0031 3051.10 | 0.74 | 35,595.000 | 26,340.30
|
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES | LB | 35,595.000 | 26,340.30
|
| | 35,595.000 | 26,340.30
|
| | 0.000 | 0.00
|
| | |
|
0032 4015.00 | 343.00 | 1.000 | 343.00
|
ADJUST MANHOLE TO GRADE | EACH | 1.000 | 343.00
|
| | 1.000 | 343.00
|
| | 0.000 | 0.00
|
| | |
|
0033 6000.10 | 3,210.00 | 1.000 | 3,210.00
|
ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 3,210.00
|
| | 1.000 | 3,210.00
|
| | 0.000 | 0.00
|
| | |
|
0034 6000.11 | 3,210.00 | 1.000 | 3,210.00
|
ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 3,210.00
|
| | 1.000 | 3,210.00
|
| | 0.000 | 0.00
|
| | |
|
0035 6005.35 | 39.03 | 170.000 | 6,635.10
|
PRECOMPRESSED POLYURETHANE FOAM JOINT | LF | 170.000 | 6,635.10
|
| | 120.000 | 4,683.60
|
| | 0.000 | 0.00
|
| | |
|
0036 6005.78 | 723.74 | 24.000 | 17,369.76
|
EXPANSION BEARING, TFE TYPE | EACH | 24.000 | 17,369.76
|
| | 24.000 | 17,369.76
|
| | 0.000 | 0.00
|
| | |
|
0037 6005.83 | 783.00 | 8.000 | 6,264.00
|
FIXED BEARING | EACH | 8.000 | 6,264.00
|
| | 8.000 | 6,264.00
|
| | 0.000 | 0.00
|
| | |
|
0038 6010.22 | 260.86 | 185.300 | 48,337.36
|
CLASS 47B-3000 CONCRETE FOR BRIDGE | CY | 185.300 | 48,337.36
|
| | 190.630 | 49,727.74
|
| | 0.000 | 0.00
|
| | |
|
0039 6010.26 | 232.30 | 747.000 | 173,528.10
|
CLASS 47BD-4000 CONCRETE FOR BRIDGE | CY | 747.000 | 173,528.10
|
| | 722.290 | 167,787.98
|
| | 0.000 | 0.00
|
| | |
|
0040 6030.00 | 53,283.00 | 1.000 | 53,283.00
|
PREPARATION OF BRIDGE | EACH | 1.000 | 53,283.00
|
AT STA. 13+99.54 | | 1.000 | 53,283.00
|
| | 0.000 | 0.00
|
| | |
|
0041 6071.12 | 387,368.00 | 1.000 | 387,368.00
|
STEEL SUPERSTRUCTURE | LS | 1.000 | 387,368.00
|
AT STA. 13+99.54 | | 1.000 | 387,368.00
|
| | 0.000 | 0.00
|
| | |
|
0042 6100.00 | 487.00 | 8.000 | 3,896.00
|
FLOOR DRAINS | EACH | 8.000 | 3,896.00
|
| | 8.000 | 3,896.00
|
| | 0.000 | 0.00
|
| | |
|
0043 6104.00 | 6.85 | 93.000 | 637.05
|
BROKEN CONCRETE RIPRAP | TON | 93.000 | 637.05
|
| | 93.000 | 637.05
|
| | 0.000 | 0.00
|
| | |
|
0044 6131.50 | 0.66 | 122,505.000 | 80,853.30
|
EPOXY COATED REINFORCING STEEL | LB | 122,505.000 | 80,853.30
|
| | 122,505.006 | 80,853.31
|
| | 0.000 | 0.00
|
| | |
|
0045 6139.50 | 13.55 | 90.000 | 1,219.50
|
SUBSURFACE DRAINAGE MATTING | SY | 90.000 | 1,219.50
|
| | 90.000 | 1,219.51
|
| | 0.000 | 0.00
|
| | |
|
0046 6401.00 | 35.10 | 318.300 | 11,172.33
|
PEDESTRIAN BARRIER RAIL | LF | 318.300 | 11,172.33
|
| | 318.300 | 11,172.33
|
| | 0.000 | 0.00
|
| | |
|
0047 6404.00 | 39.86 | 316.300 | 12,607.72
|
PEDESTRIAN RAILING (CHAIN LINK TYPE) | LF | 316.300 | 12,607.72
|
| | 316.300 | 12,607.72
|
| | 158.150 | 6,303.86
|
| | |
|
0048 6510.55 | 2,369.00 | 1.000 | 2,369.00
|
TEMPORARY BRIDGE SHORING | LS | 1.000 | 2,369.00
|
| | 1.000 | 2,369.00
|
| | 0.000 | 0.00
|
| | |
|
0049 6600.02 | 9.64 | 366.000 | 3,528.24
|
2" CONDUIT IN BRIDGE | LF | 366.000 | 3,528.24
|
| | 363.000 | 3,499.32
|
| | 0.000 | 0.00
|
| | |
|
0050 7017.00 | 2.68 | 125.000 | 335.00
|
REMOVE GUARDRAIL | LF | 125.000 | 335.00
|
| | 125.000 | 335.00
|
| | 0.000 | 0.00
|
| | |
|
0051 7019.50 | 11,856.00 | 2.000 | 23,712.00
|
IMPACT ATTENUATOR | EACH | 2.000 | 23,712.00
|
| | 2.000 | 23,712.00
|
| | 0.000 | 0.00
|
| | |
|
0052 7502.14 | 4.86 | 550.000 | 2,673.00
|
4" WHITE PREFORMED PAVEMENT MARKING, TYPE 4, GROOVED | LF | 550.000 | 2,673.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0053 8091.00 | 13.04 | 175.000 | 2,282.00
|
GRANULAR BACKFILL | CY | 175.000 | 2,282.00
|
| | 175.000 | 2,282.00
|
| | 0.000 | 0.00
|
| | |
|
0054 9173.20 | 9.55 | 394.000 | 3,762.70
|
SUBGRADE PREPARATION | SY | 394.000 | 3,762.70
|
| | 1,088.850 | 10,398.52
|
| | 0.000 | 0.00
|
| | |
|
0055 9185.50 | 9.64 | 25.000 | 241.00
|
MILLING CONCRETE CURB | LF | 25.000 | 241.00
|
| | 276.000 | 2,660.64
|
| | 0.000 | 0.00
|
| | |
|
4001 1101.25 | 2.50 | 0.000 | 0.00
|
SAWING PAVEMENT | LF | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
4003 1101.25 | 2.50 | 0.000 | 0.00
|
SAWING PAVEMENT | LF | 730.000 | 1,825.00
|
| | 783.000 | 1,957.50
|
| | 0.000 | 0.00
|
| | |
|
4004 3041.02 | 36.38 | 0.000 | 0.00
|
ASPHALT PATCHING OF PORTLAND CEMENT CONCRETE PAVEMENT,TYPE B | SY | 14.510 | 527.87
|
| | 7.300 | 265.57
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6 BRIDGE AT STA. 13+99.54 | | Contracted | 1,122,913.17
|
| | Current | 1,125,266.04
|
| | In place | 1,204,007.08
|
| | This Estimate | 23,021.21
|
| | |
|
Totals for contract | | Contracted | 1,122,913.17
|
---|
| | Current | 1,125,266.04
|
---|
| | In place | 1,204,007.08
|
---|
| | This Estimate | 23,021.21
|
---|