Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0477 WESTERN ENGINEERING COMPANY, INC.
Contract ID:2903A
Estimate Number:0004
Pay Period End Date:12.14.2002
Contract Location:
BENNINGTON EAST & WESTEstimate Type:FINL
Contractor:
WESTERN ENGINEERING COMPANY, INC.Date Let:05.23.2002
1149 WEST HIGHWAY 44Date Awarded:05.30.2002
PO BOX 350Date Contract Executed:06.17.2002
Date Notice to Proceed:06.17.2002
HARLAN IA 51537Date Work Began:08.05.2002
Phone:Date Physical Work Completed:
(712)755-5191Date Accepted:
Escrow Agent:
Surety Co:
HARTFORD FIRE INSURANCE COMPANY
Counties
DOUGLAS
Project Number PCT Fed State Project Number Description
29903A 000  0.000 PM-36-7(1012)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$481,422.49$467,753.91$13,668.58
$484,538.70Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$481,422.49$467,753.91$13,668.58
$481,954.86Retainage$.00$-4,677.54$4,677.54
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
99.36%Net Earnings$481,422.49$463,076.37$18,346.12
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$481,422.49$463,076.37$18,346.12
Project ManagerDiv. Head/Dist. Eng.
Trujillo, Ray02.10.2003Lech, Marvin (Marv)03.03.2003
Constr. Estimate Eng.Materials Eng.
Davis, Carl03.04.2003Hall, David03.04.2003
Controller Div. Processed
Harring, Joyce03.21.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0001                          0001.10 4.25248.0001,054.00
BARRICADE, TYPE III BDAY248.0001,054.00
1,198.0005,091.50
0.0000.00

0002                          0001.30 2.50124.000310.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY124.000310.00
0.0000.00
0.0000.00

0003                          0001.75 4.00490.0001,960.00
TEMPORARY SIGN DAY EACH490.0001,960.00
97.000388.00
0.0000.00

0004                          0001.90 0.504,712.0002,356.00
SIGN DAY EACH4,712.0002,356.00
2,952.0001,476.00
0.0000.00

0005                          0002.55 4.101,116.1604,576.26
OVERLAY BROKEN LINES STA 1,116.1604,576.26
1,457.5105,975.79
41.530170.27

0006                          0002.60 9.101,116.16010,157.06
OVERLAY SOLID LINES STA 1,116.16010,157.06
2,279.88020,746.91
14.500131.95

0007                          0003.10 250.0070.00017,500.00
FLAGGING DAY 70.00017,500.00
69.00017,250.00
0.0000.00

0008                          0003.20 350.005.0001,750.00
FURNISHING AND OPERATING PILOT VEHICLE DAY 5.0001,750.00
24.0008,400.00
0.0000.00

0009                          0010.04 750.001.000750.00
FIELD OFFICE EACH1.000750.00
0.0000.00
0.0000.00

0010                          0030.90 6,000.001.0006,000.00
MOBILIZATION LS 1.0006,000.00
1.0006,000.00
0.0000.00

0011                          3040.11 130.003.300429.00
CONCRETE PAVEMENT REPAIR, TYPE A, FULL DEPTH SY 3.300429.00
2.670347.10
2.670347.10

0012                          3040.12 130.0064.1008,333.00
CONCRETE PAVEMENT REPAIR, TYPE B, FULL DEPTH SY 64.1008,333.00
70.3409,144.20
-2.670-347.10

0013                          3040.13 130.0081.30010,569.00
CONCRETE PAVEMENT REPAIR, TYPE C, FULL DEPTH SY 81.30010,569.00
39.2605,103.80
0.0000.00

0014                          3221.15 130.0024.0003,120.00
CONCRETE PAVEMENT, CLASS PR-3500 SY 24.0003,120.00
JOINT REPAIR 69.3109,010.30
0.0000.00

0015                          9005.00 38.00100.0003,800.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 4.000152.00
SP4(0.375) 1.12042.56
-2.880-109.44

0016                          9005.44 24.258,390.000203,457.50
ASPHALTIC CONCRETE, TYPE SP4(0.375) TON 8,390.000203,457.50
8,791.750213,199.94
219.1205,313.66

0017                          9021.01 180.00585.810105,445.80
PERFORMANCE GRADED BINDER (64-22) TON 585.810105,445.80
503.05090,549.00
14.4402,599.20

0018                          9053.00 0.8022,380.00017,904.00
TACK COAT GAL 22,380.00017,904.00
10,692.5008,554.00
0.0000.00

0019                          9053.20 0.9020,360.00018,324.00
FOG SEAL GAL 20,360.00018,324.00
20,450.00018,405.00
0.0000.00

0020                          9110.01 60.0055.0003,300.00
RENTAL OF LOADER, FULLY OPERATED HOUR55.0003,300.00
0.0000.00
0.0000.00

0021                          9110.02 60.0055.0003,300.00
RENTAL OF MOTOR GRADER, FULLY OPERATED HOUR55.0003,300.00
0.0000.00
0.0000.00

0022                          9110.03 45.0055.0002,475.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR55.0002,475.00
14.000630.00
9.000405.00

0023                          9110.07 35.0055.0001,925.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR55.0001,925.00
14.000490.00
9.000315.00

0024                          9179.23 95.00559.57153,159.25
COLD MILLING, CLASS 3 STA 559.57153,159.25
572.49054,386.55
-14.620-1,388.90

4001                          9009.72 55.700.0000.00
PATCHING SY 64.0003,564.80
JOINT REPAIR WITH ASPHALTIC CONCRETE, TYPE SP-4 64.0003,564.80
64.0003,564.80

4002                          3221.06 158.000.0000.00
CONCRETE PAVEMENT, CLASS PR-3625 SY 16.8802,667.04
CONCRETE BRIDGE APPROACH REPAIR, TYPE PR-3625 16.8802,667.04
16.8802,667.04

GROUP 9 BITUMINOUSContracted481,954.86
Current484,538.70
In place481,422.49
This Estimate13,668.58

Totals for contractContracted481,954.86
Current484,538.70
In place481,422.49
This Estimate13,668.58