Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:3626 REALM CONSTRUCTION, INC.
Contract ID:2999X
Estimate Number:0010
Pay Period End Date:02.27.2003
Contract Location:
IN OMAHAEstimate Type:FINL
Contractor:
REALM CONSTRUCTION, INC.Date Let:12.06.2001
604 SE INDUSTRIAL DRDate Awarded:12.18.2001
PO BOX 1236Date Contract Executed:01.11.2002
Date Notice to Proceed:01.11.2002
BLUE SPRINGS MO 64014Date Work Began:
Phone:Date Physical Work Completed:
(816)229-6620Date Accepted:09.18.2002
Escrow Agent:
Surety Co:
NATIONAL SURETY CORPORATION
Counties
DOUGLAS
Project Number PCT Fed State Project Number Description
21999 000  0.000 RD-80-9(1117)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$589,046.00$589,046.00$.00
$526,805.34Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$589,046.00$589,046.00$.00
$414,211.34Retainage$.00$-5,890.46$5,890.46
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
111.81%Net Earnings$589,046.00$583,155.54$5,890.46
Liquidated Damages$.00-$4,068.00$4,068.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00-$4,068.00$4,068.00
Payment$589,046.00$579,087.54$9,958.46
Project ManagerDiv. Head/Dist. Eng.
Khalaf, Zahi02.27.2003Lech, Marvin (Marv)02.27.2003
Constr. Estimate Eng.Materials Eng.
Guilfoil, David02.27.2003Hall, David02.27.2003
Controller Div. Processed
Harring, Joyce03.11.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0001                          A801.00 10.00600.0006,000.00
CONSTRUCTION LIGHTING HOUR600.0006,000.00
541.5005,415.00
0.0000.00

0002                          0001.08 0.503,575.0001,787.50
BARRICADE, TYPE II BDAY3,575.0001,787.50
13,750.0006,875.00
0.0000.00

0003                          0001.10 4.001,303.0005,212.00
BARRICADE, TYPE III BDAY1,303.0005,212.00
678.0002,712.00
0.0000.00

0004                          0001.30 3.001,248.0003,744.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY1,248.0003,744.00
431.0001,293.00
0.0000.00

0005                          0001.75 6.00880.0005,280.00
TEMPORARY SIGN DAY EACH880.0005,280.00
2,327.00013,962.00
0.0000.00

0006                          0001.90 0.505,408.0002,704.00
SIGN DAY EACH5,408.0002,704.00
0.0000.00
0.0000.00

0007                          0002.61 50.0020.0001,000.00
PLOWABLE PAVEMENT MARKER EACH20.0001,000.00
28.0001,400.00
0.0000.00

0008                          0002.63 8.802,300.00020,240.00
PLOWABLE PAVEMENT MARKER REFLECTOR EACH2,300.00020,240.00
2,492.00021,929.60
0.0000.00

0009                          0002.97 300.0055.00016,500.00
FLASHING ARROW PANEL DAY 55.00016,500.00
202.50060,750.00
0.0000.00

0010                          0030.90 45,777.001.00045,777.00
MOBILIZATION LS 1.00045,777.00
1.00045,777.00
0.0000.00

0011                          3211.25 20.00143.0002,860.00
SEALING CRACKS LF 5,752.000115,040.00
5,752.000115,040.00
0.0000.00

0012                          3211.30 0.58522,598.000303,106.84
SEALING JOINTS LF 522,598.000303,106.84
540,480.000313,478.40
0.0000.00

4001                          3900.27 18.000.0000.00
ADDITIONAL COST EACH23.000414.00
FILL VOIDS WITH EPOXY 23.000414.00
0.0000.00

GROUP 9 BITUMINOUSContracted414,211.34
Current526,805.34
In place589,046.00
This Estimate0.00

Totals for contractContracted414,211.34
Current526,805.34
In place589,046.00
This Estimate0.00