| | | 1. Contracted
|
---|
| | | 2. Current
|
---|
| | | 3. To date
|
---|
Item Nbr Item Code | Unit Price | | 4. This Est
|
---|
Item Description | Units | Qty | Amount
|
---|
GROUP 6 BRIDGE AT STA. 4+00 | | |
|
0001 L006.00 | 700.00 | 1.000 | 700.00
|
COVER CROP SEEDING | ha | 1.000 | 700.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0002 0001.10 | 1.30 | 1,668.000 | 2,168.40
|
BARRICADE, TYPE III | BDAY | 1,668.000 | 2,168.40
|
| | 1,232.000 | 1,601.60
|
| | 72.000 | 93.60
|
| | |
|
0003 0001.30 | 1.10 | 278.000 | 305.80
|
TYPE B HIGH INTENSITY WARNING LIGHT | LDAY | 278.000 | 305.80
|
| | 268.000 | 294.80
|
| | 18.000 | 19.80
|
| | |
|
0004 0001.90 | 0.45 | 3,058.000 | 1,376.10
|
SIGN DAY | EACH | 3,058.000 | 1,376.10
|
| | 1,232.000 | 554.40
|
| | 72.000 | 32.40
|
| | |
|
0005 0030.60 | 27,000.00 | 1.000 | 27,000.00
|
MOBILIZATION | LS | 1.000 | 27,000.00
|
| | 1.000 | 27,000.00
|
| | 0.000 | 0.00
|
| | |
|
0006 1009.00 | 2,000.00 | 1.000 | 2,000.00
|
GENERAL CLEARING AND GRUBBING | LS | 1.000 | 2,000.00
|
| | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
0007 1010.01 | 2.00 | 6,385.000 | 12,770.00
|
EXCAVATION (ESTABLISHED QUANTITY) | m3 | 6,385.000 | 12,770.00
|
| | 6,385.000 | 12,770.00
|
| | 1,385.000 | 2,770.00
|
| | |
|
0008 1011.00 | 2.00 | 230.000 | 460.00
|
WATER | kL | 230.000 | 460.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0009 4043.00 | 10.00 | 9.754 | 97.54
|
REMOVE CULVERT PIPE | m | 9.754 | 97.54
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0010 4050.01 | 3.00 | 1,063.000 | 3,189.00
|
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS | m3 | 1,063.000 | 3,189.00
|
| | 1,063.000 | 3,189.00
|
| | 0.000 | 0.00
|
| | |
|
0011 4350.42 | 105.00 | 43.200 | 4,536.00
|
1050 mm CORRUGATED METAL PIPE | m | 43.200 | 4,536.00
|
| | 43.200 | 4,536.00
|
| | 0.000 | 0.00
|
| | |
|
0012 4350.60 | 175.00 | 28.500 | 4,987.50
|
1500 mm CORRUGATED METAL PIPE | m | 28.500 | 4,987.50
|
| | 28.500 | 4,987.50
|
| | 0.000 | 0.00
|
| | |
|
0013 4360.42 | 420.00 | 1.000 | 420.00
|
1050 mm METAL FLARED-END SECTION | EACH | 1.000 | 420.00
|
| | 1.000 | 420.00
|
| | 0.000 | 0.00
|
| | |
|
0014 4360.60 | 770.00 | 1.000 | 770.00
|
1500 mm METAL FLARED-END SECTION | EACH | 1.000 | 770.00
|
| | 1.000 | 770.00
|
| | 0.000 | 0.00
|
| | |
|
0015 6000.10 | 2,000.00 | 1.000 | 2,000.00
|
ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 2,000.00
|
| | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
0016 6000.11 | 2,000.00 | 1.000 | 2,000.00
|
ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 2,000.00
|
| | 1.000 | 2,000.00
|
| | 0.000 | 0.00
|
| | |
|
0017 6001.00 | 7,000.00 | 1.000 | 7,000.00
|
BENT NO.1 EXCAVATION | LS | 1.000 | 7,000.00
|
| | 1.000 | 7,000.00
|
| | 0.000 | 0.00
|
| | |
|
0018 6001.01 | 7,000.00 | 1.000 | 7,000.00
|
BENT NO.2 EXCAVATION | LS | 1.000 | 7,000.00
|
| | 1.000 | 7,000.00
|
| | 0.000 | 0.00
|
| | |
|
0019 6010.22 | 310.00 | 172.400 | 53,444.00
|
CLASS 47B-20 CONCRETE FOR BRIDGE | m3 | 172.400 | 53,444.00
|
| | 172.400 | 53,444.00
|
| | 0.000 | 0.00
|
| | |
|
0020 6010.26 | 300.00 | 105.900 | 31,770.00
|
CLASS 47BD-30 CONCRETE FOR BRIDGE | m3 | 105.900 | 31,770.00
|
| | 107.250 | 32,175.00
|
| | 1.350 | 405.00
|
| | |
|
0021 6011.11 | 99,800.00 | 1.000 | 99,800.00
|
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE | LS | 1.000 | 99,800.00
|
| | 1.000 | 99,800.00
|
| | 0.000 | 0.00
|
| | |
|
0022 6040.00 | 10,000.00 | 1.000 | 10,000.00
|
REMOVE STRUCTURE | EACH | 1.000 | 10,000.00
|
AT STA. 4+00.48 | | 1.000 | 10,000.00
|
| | 0.000 | 0.00
|
| | |
|
0023 6080.00 | 4.00 | 2,052.000 | 8,208.00
|
STRUCTURAL STEEL FOR SUBSTRUCTURE | kg | 2,052.000 | 8,208.00
|
| | 2,052.000 | 8,208.00
|
| | 0.000 | 0.00
|
| | |
|
0024 6105.02 | 26.00 | 1,154.000 | 30,004.00
|
ROCK RIPRAP, TYPE B | Mg | 1,154.000 | 30,004.00
|
| | 1,154.199 | 30,009.17
|
| | 835.199 | 21,715.17
|
| | |
|
0025 6131.50 | 1.10 | 20,830.000 | 22,913.00
|
EPOXY COATED REINFORCING STEEL | kg | 20,830.000 | 22,913.00
|
| | 20,939.000 | 23,032.90
|
| | 0.000 | 0.00
|
| | |
|
0026 6139.50 | 40.00 | 28.000 | 1,120.00
|
SUBSURFACE DRAINAGE MATTING | m2 | 28.000 | 1,120.00
|
| | 28.000 | 1,120.00
|
| | 28.000 | 1,120.00
|
| | |
|
0027 6210.12 | 65.00 | 568.000 | 36,920.00
|
HP 250 mm X 62 kg STEEL PILING | m | 568.000 | 36,920.00
|
| | 498.840 | 32,424.60
|
| | 0.000 | 0.00
|
| | |
|
0028 6310.00 | 120.00 | 282.400 | 33,888.00
|
STEEL SHEET PILING | m2 | 282.400 | 33,888.00
|
| | 277.440 | 33,292.80
|
| | 0.000 | 0.00
|
| | |
|
0029 8091.00 | 24.00 | 68.200 | 1,636.80
|
GRANULAR BACKFILL | m3 | 68.200 | 1,636.80
|
| | 68.200 | 1,636.80
|
| | 68.200 | 1,636.80
|
| | |
|
0601 6210.32 | 39.00 | 0.000 | 0.00
|
PAY CUT-OFF FOR 250 mm X 62 kg STEEL PILING | m | 10.000 | 390.00
|
Paragraph 2, Subsection 703.05 of the 1997 Standard Specs. | | 69.160 | 2,697.24
|
| | 0.000 | 0.00
|
| | |
|
0602 6210.42 | 130.00 | 0.000 | 0.00
|
HP 250 mm X 62 kg, PILE SPLICES | EACH | 10.000 | 1,300.00
|
Paragraph 3, Subsection 703.05 of the 1997 Standard Specs. | | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6 BRIDGE AT STA. 4+00 | | Contracted | 408,484.14
|
| | Current | 410,174.14
|
| | In place | 403,963.81
|
| | This Estimate | 27,792.77
|
| | |
|
Totals for contract | | Contracted | 408,484.14
|
---|
| | Current | 410,174.14
|
---|
| | In place | 403,963.81
|
---|
| | This Estimate | 27,792.77
|
---|