Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0880 CHRISTENSEN BROS., INC.
Contract ID:3333
Estimate Number:0007
Pay Period End Date:06.15.2002
Contract Location:
HARTINGTON SOUTHEstimate Type:PROG
Contractor:
CHRISTENSEN BROS., INC.Date Let:12.07.2000
644 RIVER ROADDate Awarded:01.02.2001
PO BOX 478Date Contract Executed:01.26.2001
Date Notice to Proceed:01.26.2001
CHEROKEE IA 51012Date Work Began:07.30.2001
Phone:Date Physical Work Completed:
(712)225-6146Date Accepted:
Escrow Agent:
Surety Co:
NATIONAL FIRE INSURANCE COMPANY OF HARTFORD
Counties
CEDAR
Project Number PCT Fed State Project Number Description
31333 000  0.000 BRO-7014(22)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$286,707.67$267,185.47$19,522.20
$319,772.30Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$286,707.67$267,185.47$19,522.20
$318,932.30Retainage$-2,867.08$-2,671.85$-195.23
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
89.66%Net Earnings$283,840.59$264,513.62$19,326.97
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$-66.85$-66.85$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments-$66.85-$66.85$.00
Payment$283,773.74$264,446.77$19,326.97
Project ManagerDiv. Head/Dist. Eng.
Becker, Roger06.17.2002Boyle, Pat06.18.2002
Constr. Estimate Eng.Materials Eng.
Henrichson, Roger06.18.2002
Controller Div. Processed
Burling, Laurie06.19.2002
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 30+53.55
0001                          L001.01 600.002.0001,200.00
SEEDING, TYPE A ha 2.0001,200.00
0.0000.00
0.0000.00

0002                          L006.00 2,000.002.0004,000.00
COVER CROP SEEDING ha 2.0004,000.00
0.0000.00
0.0000.00

0003                          L032.75 85.0010.000850.00
MULCH Mg 10.000850.00
0.0000.00
0.0000.00

0004                          0001.10 1.601,946.0003,113.60
BARRICADE, TYPE III BDAY1,946.0003,113.60
2,400.0003,840.00
168.000268.80

0005                          0001.30 1.10556.000611.60
TYPE B HIGH INTENSITY WARNING LIGHT LDAY556.000611.60
600.000660.00
42.00046.20

0006                          0001.90 0.403,892.0001,556.80
SIGN DAY EACH3,892.0001,556.80
3,274.0001,309.60
238.00095.20

0007                          0030.60 25,000.001.00025,000.00
MOBILIZATION LS 1.00025,000.00
1.00025,000.00
0.0000.00

0008                          1009.00 3,000.001.0003,000.00
GENERAL CLEARING AND GRUBBING LS 1.0003,000.00
0.8002,400.00
0.0000.00

0009                          1010.01 2.154,782.00010,281.30
EXCAVATION (ESTABLISHED QUANTITY) m3 4,782.00010,281.30
3,500.0007,525.00
0.0000.00

0010                          1011.00 2.00113.000226.00
WATER kL 113.000226.00
0.0000.00
0.0000.00

0011                          1300.24 52.0018.000936.00
600 mm DRIVEWAY CULVERT PIPE m 18.000936.00
20.0001,040.00
20.0001,040.00

0012                          2010.00 42.00126.0005,292.00
CRUSHED ROCK SURFACE COURSE m3 126.0005,292.00
0.0000.00
0.0000.00

0013                          3050.15 290.0037.60010,904.00
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 37.60010,904.00
37.60010,904.00
0.0000.00

0014                          3051.10 1.202,388.0002,865.60
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 2,388.0002,865.60
2,388.0002,865.60
0.0000.00

0015                          4043.00 24.008.600206.40
REMOVE CULVERT PIPE m 8.600206.40
8.600206.40
0.0000.00

0016                          4050.01 3.00373.0001,119.00
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS m3 373.0001,119.00
373.0001,119.00
255.000765.00

0017                          4300.24 57.0020.0001,140.00
600 mm CULVERT PIPE m 20.0001,140.00
20.0001,140.00
20.0001,140.00

0018                          4300.36 76.0071.0005,396.00
900 mm CULVERT PIPE m 71.0005,396.00
71.0005,396.00
52.0003,952.00

0019                          4310.24 225.001.000225.00
600 mm FLARED-END SECTION EACH1.000225.00
1.000225.00
1.000225.00

0020                          4310.36 370.006.0002,220.00
900 mm FLARED-END SECTION EACH6.0002,220.00
6.0002,220.00
2.000740.00

0021                          6000.10 2,000.001.0002,000.00
ABUTMENT NO.1 EXCAVATION LS 1.0002,000.00
1.0002,000.00
0.0000.00

0022                          6000.11 2,000.001.0002,000.00
ABUTMENT NO.2 EXCAVATION LS 1.0002,000.00
1.0002,000.00
0.0000.00

0023                          6001.00 7,000.001.0007,000.00
BENT NO.1 EXCAVATION LS 1.0007,000.00
1.0007,000.00
0.0000.00

0024                          6001.01 7,000.001.0007,000.00
BENT NO.2 EXCAVATION LS 1.0007,000.00
1.0007,000.00
0.0000.00

0025                          6010.22 310.00198.60061,566.00
CLASS 47B-20 CONCRETE FOR BRIDGE m3 198.60061,566.00
198.60061,566.00
0.0000.00

0026                          6010.26 300.00184.50055,350.00
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 184.50055,350.00
184.50055,350.00
0.0000.00

0027                          6020.00 1.1027,690.00030,459.00
REINFORCING STEEL FOR BRIDGE kg 27,690.00030,459.00
27,690.00030,459.00
0.0000.00

0028                          6040.00 10,000.001.00010,000.00
REMOVE STRUCTURE EACH1.00010,000.00
AT STA. 30+59 1.00010,000.00
0.0000.00

0029                          6080.00 4.001,256.0005,024.00
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 1,256.0005,024.00
1,256.0005,024.00
0.0000.00

0030                          6105.02 25.00864.00021,600.00
ROCK RIPRAP, TYPE B Mg 864.00021,600.00
570.00014,250.00
450.00011,250.00

0031                          6210.12 70.00377.00026,390.00
HP 250 mm X 62 kg STEEL PILING m 377.00026,390.00
370.50025,935.00
0.0000.00

0032                          7020.00 1,400.004.0005,600.00
BRIDGE APPROACH SECTIONS EACH4.0005,600.00
0.0000.00
0.0000.00

0033                          7021.45 1,200.004.0004,800.00
BREAKAWAY CABLE TERMINAL EACH4.0004,800.00
0.0000.00
0.0000.00

0601                          6210.32 42.000.0000.00
PAY CUT-OFF FOR 250 mm X 62 kg STEEL PILING m 20.000840.00
In accordance with Paragraph 2, Subsection 703.05 of the 1997 Metric Specs. 6.500273.00
0.0000.00

GROUP 6 BRIDGE AT STA. 30+53.55Contracted318,932.30
Current319,772.30
In place286,707.60
This Estimate19,522.20

Totals for contractContracted318,932.30
Current319,772.30
In place286,707.60
This Estimate19,522.20