Nebraska Department of Roads | |
---|---|
Estimate Summary to Contractor | |
Vendor ID: | 0810 ELK HORN CONSTRUCTION CO. |
Contract ID: | 3625X |
Estimate Number: | 0004 |
Pay Period End Date: | 02.04.2003 |
Contract Location: | ||
G STREET OVERPASS, SOUTH SIOUX CITY | Estimate Type: | FINL |
Contractor: | ||
ELK HORN CONSTRUCTION CO. | Date Let: | 06.27.2002 |
2243 ANDREW AVE | Date Awarded: | 07.03.2002 |
PO BOX 580 | Date Contract Executed: | 07.16.2002 |
Date Notice to Proceed: | 07.16.2002 | |
SERGEANT BLUFF IA 51054 | Date Work Began: | 10.15.2002 |
Phone: | Date Physical Work Completed: | |
(712)943-4430 | Date Accepted: | 11.06.2002 |
Escrow Agent: | ||
Surety Co: | ||
MERCHANTS BONDING COMPANY (MUTUAL) |
Counties |
---|
DAKOTA |
Project Number |   | PCT |   | Fed State Project Number |   | Description | |
---|---|---|---|---|---|---|---|
31625 000 |   | 0.000 |   | MISC-129-1(1009) |   | BRIDGE |
Total to Date | Prev to Date | This Estimate | ||
Current Contract Amt | Total Earnings | $18,476.00 | $18,476.00 | $.00 |
$16,620.00 | Stockpiled Materials | $.00 | $.00 | $.00 |
Original Contract Amt | Gross Earnings | $18,476.00 | $18,476.00 | $.00 |
$14,820.00 | Retainage | $.00 | $-184.76 | $184.76 |
Escrow Amount | $.00 | $.00 | $.00 | |
Percent Complete | Securities Encumbered | $.00 | $.00 | $.00 |
111.17% | Net Earnings | $18,476.00 | $18,291.24 | $184.76 |
Liquidated Damages | $.00 | $.00 | $.00 | |
Incentives | $.00 | $.00 | $.00 | |
Disincentives | $.00 | $.00 | $.00 | |
Other Contract Adj | $.00 | $.00 | $.00 | |
Appl of Training Adj | $.00 | $.00 | $.00 | |
Training Rates Adj | $.00 | $.00 | $.00 | |
Fuel Adj | $.00 | $.00 | $.00 | |
Bituminous Adj | $.00 | $.00 | $.00 | |
Autopay Adj | $.00 | $.00 | $.00 | |
Gasoline Adj | $.00 | $.00 | $.00 | |
Other Adj | $.00 | $.00 | $.00 | |
Price Adj | $.00 | $.00 | $.00 | |
Substandard Item Adj | $.00 | $.00 | $.00 | |
Asphalt Adj | $.00 | $.00 | $.00 | |
Diesel Fuel Adj | $.00 | $.00 | $.00 | |
Petrol Adj | $.00 | $.00 | $.00 | |
Total for Adjustments | $.00 | $.00 | $.00 | |
Payment | $18,476.00 | $18,291.24 | $184.76 | |
Project Manager | Div. Head/Dist. Eng. | |||
Wiebelhaus, Bob | 02.04.2003 | Boyle, Pat | 06.06.2003 | |
Constr. Estimate Eng. | Materials Eng. | |||
Davis, Carl | 06.10.2003 | Hall, David | 06.10.2003 | |
Controller Div. Processed | ||||
Harring, Joyce | 06.23.2003 |
Detailed breakdown of stockpiled materials | ||||
---|---|---|---|---|
Total remaining for contract: | 0.00 |
1. Contracted | |||
---|---|---|---|
2. Current | |||
3. To date | |||
Item Nbr Item Code | Unit Price | 4. This Est | |
Item Description | Units | Qty | Amount |
GROUP 6 BRIDGE AT STA. 355+00.85 | |||
0001 0001.08 | 0.50 | 350.000 | 175.00 |
BARRICADE, TYPE II | BDAY | 350.000 | 175.00 |
0.000 | 0.00 | ||
0.000 | 0.00 | ||
0002 0001.10 | 2.00 | 38.000 | 76.00 |
BARRICADE, TYPE III | BDAY | 38.000 | 76.00 |
95.000 | 190.00 | ||
0.000 | 0.00 | ||
0003 0001.30 | 2.00 | 38.000 | 76.00 |
TYPE B HIGH INTENSITY WARNING LIGHT | LDAY | 38.000 | 76.00 |
0.000 | 0.00 | ||
0.000 | 0.00 | ||
0004 0001.75 | 4.00 | 120.000 | 480.00 |
TEMPORARY SIGN DAY | EACH | 120.000 | 480.00 |
0.000 | 0.00 | ||
0.000 | 0.00 | ||
0005 0001.90 | 1.00 | 513.000 | 513.00 |
SIGN DAY | EACH | 513.000 | 513.00 |
653.000 | 653.00 | ||
0.000 | 0.00 | ||
0006 0003.10 | 150.00 | 10.000 | 1,500.00 |
FLAGGING | DAY | 10.000 | 1,500.00 |
0.000 | 0.00 | ||
0.000 | 0.00 | ||
0007 0030.60 | 2,000.00 | 1.000 | 2,000.00 |
MOBILIZATION | LS | 1.000 | 2,000.00 |
1.000 | 2,000.00 | ||
0.000 | 0.00 | ||
0008 3089.80 | 150.00 | 20.000 | 3,000.00 |
FLOWABLE FILL CONCRETE | CY | 20.000 | 3,000.00 |
15.500 | 2,325.00 | ||
0.000 | 0.00 | ||
0009 6030.05 | 6,000.00 | 1.000 | 6,000.00 |
PREPARATION OF BRIDGE | EACH | 1.000 | 6,000.00 |
AT STA. 355+00.85 | 1.000 | 6,000.00 | |
0.000 | 0.00 | ||
0010 6107.00 | 200.00 | 5.000 | 1,000.00 |
CONCRETE SLOPE PROTECTION | SY | 5.000 | 1,000.00 |
27.540 | 5,508.00 | ||
0.000 | 0.00 | ||
4001 A900.10 | 450.00 | 0.000 | 0.00 |
ADDITIONAL WORK | EACH | 4.000 | 1,800.00 |
Extension of bridge deck drains, down to slope protection Using 6" PVC pipe and connections. | 4.000 | 1,800.00 | |
0.000 | 0.00 | ||
GROUP 6 BRIDGE AT STA. 355+00.85 | Contracted | 14,820.00 | |
Current | 16,620.00 | ||
In place | 18,476.00 | ||
This Estimate | 0.00 | ||
Totals for contract | Contracted | 14,820.00 | |
Current | 16,620.00 | ||
In place | 18,476.00 | ||
This Estimate | 0.00 |