Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0013 DIAMOND ENGINEERING COMPANY/THE
Contract ID:4017X
Estimate Number:0024
Pay Period End Date:05.01.2001
Contract Location:
DONIPHAN NORTHEstimate Type:PROG
Contractor:
DIAMOND ENGINEERING COMPANY/THEDate Let:10.21.1999
1521 W ANNADate Awarded:10.28.1999
PO BOX 1327Date Contract Executed:11.04.1999
Date Notice to Proceed:11.04.1999
GRAND ISLAND NE 68802Date Work Began:11.15.1999
Phone:Date Physical Work Completed:
(308)382-8362Date Accepted:
Escrow Agent:
Surety Co:
EMPLOYERS INSURANCE OF WAUSAU A MUTUAL COMPANY
Counties
HALL
Project Number PCT Fed State Project Number Description
42017 000B  0.000 EACNH-EACBH-34-4(127)  BR GDRL
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$1,064,825.44$1,059,371.44$5,454.00
$1,091,873.57Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$1,064,825.44$1,059,371.44$5,454.00
$1,067,380.45Retainage$-10,648.25$-10,593.71$-54.54
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
97.52%Net Earnings$1,054,177.19$1,048,777.73$5,399.46
Liquidated Damages-$534.00$.00-$534.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments-$534.00$.00-$534.00
Payment$1,053,643.19$1,048,777.73$4,865.46
Project ManagerDiv. Head/Dist. Eng.
Schmidt, Larry05.01.2001Meyer, Keith05.01.2001
Constr. Estimate Eng.Materials Eng.
Bartos, Steve05.02.2001
Controller Div. Processed
Burling, Laurie05.02.2001
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 232+22.759 LT.
0001                          0030.60 30,500.001.00030,500.00
MOBILIZATION LS 1.00030,500.00
1.00030,500.00
0.0000.00

0002                          1101.00 7.70433.0003,334.10
REMOVE PAVEMENT m2 433.0003,334.10
433.0003,334.10
0.0000.00

0003                          1101.25 8.2030.900253.38
SAWING PAVEMENT m 30.900253.38
14.600119.72
0.0000.00

0004                          1102.00 6.25502.0003,137.50
REMOVE ASPHALT SURFACE m2 502.0003,137.50
38.000237.50
0.0000.00

0005                          3050.15 276.10125.60034,678.16
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 125.60034,678.16
125.60034,678.16
0.0000.00

0006                          3051.10 1.428,440.00011,984.80
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 8,440.00011,984.80
8,440.00011,984.80
0.0000.00

0007                          6000.10 3,000.001.0003,000.00
ABUTMENT NO.1 EXCAVATION LS 1.0003,000.00
1.0003,000.00
0.0000.00

0008                          6000.11 3,000.001.0003,000.00
ABUTMENT NO.2 EXCAVATION LS 1.0003,000.00
1.0003,000.00
0.0000.00

0009                          6000.60 14,250.001.00014,250.00
PIER NO.1 EXCAVATION LS 1.00014,250.00
1.00014,250.00
0.0000.00

0010                          6000.61 14,250.001.00014,250.00
PIER NO.2 EXCAVATION LS 1.00014,250.00
1.00014,250.00
0.0000.00

0011                          6005.35 433.0037.80016,367.40
PRECOMPRESSED POLYURETHANE FOAM JOINT m 37.80016,367.40
37.80016,367.40
0.0000.00

0012                          6010.22 550.0091.30050,215.00
CLASS 47B-20 CONCRETE FOR BRIDGE m3 91.30050,215.00
91.30050,215.00
0.0000.00

0013                          6010.26 481.50546.800263,284.20
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 546.800263,284.20
546.800263,284.20
0.0000.00

0014                          6011.11 75,000.001.00075,000.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.00075,000.00
1.00075,000.00
0.0000.00

0015                          6030.00 138,000.001.000138,000.00
PREPARATION OF BRIDGE EACH1.000138,000.00
1.000138,000.00
0.0000.00

0016                          6080.00 8.761,154.00010,109.04
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 1,154.00010,109.04
1,154.00010,109.04
0.0000.00

0017                          6104.00 36.70664.00024,368.80
BROKEN CONCRETE RIPRAP Mg 664.00024,368.80
664.00024,368.80
0.0000.00

0018                          6131.50 1.4256,389.00080,072.38
EPOXY COATED REINFORCING STEEL kg 56,389.00080,072.38
56,389.00080,072.38
0.0000.00

0019                          6200.00 112.00289.60032,435.20
CONCRETE PILING m 289.60032,435.20
289.60032,435.20
0.0000.00

0020                          8091.00 45.0081.0003,645.00
GRANULAR BACKFILL m3 81.0003,645.00
81.0003,645.00
0.0000.00

0021                          9000.01 81.50220.00017,930.00
ASPHALTIC CONCRETE Mg 220.00017,930.00
0.0000.00
0.0000.00

070                           6617.00 1,500.000.0000.00
ABUTMENT REPAIR EACH3.0004,500.00
3.0004,500.00
0.0000.00

071                           6610.60 500.000.0000.00
METAL BOND BREAKER EACH2.0001,000.00
2.0001,000.00
0.0000.00

072                           3075.55 45.450.0000.00
255 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 m2 59.1302,687.46
100.4404,564.99
0.0000.00

GROUP 6 BRIDGE AT STA. 232+22.759 LT.Contracted829,814.96
Current838,002.42
In place818,916.29
This Estimate0.00

GROUP 6A BRIDGE AT STA. 232+22.759 RT.
0022                          0030.60 8,000.001.0008,000.00
MOBILIZATION LS 1.0008,000.00
1.0008,000.00
0.0000.00

0023                          6004.50 246.0043.00010,578.00
EXPANSION JOINT m 43.00010,578.00
43.00010,578.00
0.0000.00

0024                          6010.28 632.50141.82089,701.15
CLASS 47BD-35 CONCRETE FOR BRIDGE m3 141.82089,701.15
141.82089,701.15
0.0000.00

0025                          6020.00 1.186,486.0007,653.48
REINFORCING STEEL FOR BRIDGE kg 6,486.0007,653.48
6,486.0007,653.48
0.0000.00

0068                          6617.50 11,116.000.0000.00
PIER REPAIR EACH1.00011,116.00
1.00011,116.00
0.0000.00

GROUP 6A BRIDGE AT STA. 232+22.759 RT.Contracted115,932.63
Current127,048.63
In place127,048.63
This Estimate0.00

GROUP 7 GUARDRAIL
0026                          L020.00 5.001,083.0005,415.00
EROSION CONTROL m2 1,083.0005,415.00
1,083.0005,415.00
1,083.0005,415.00

0027                          0030.70 2,500.001.0002,500.00
MOBILIZATION LS 1.0002,500.00
1.0002,500.00
0.0000.00

0028                          1033.00 2,200.001.8404,048.00
ROADWAY GRADING StaM1.8404,048.00
1.8404,048.00
0.0000.00

0029                          7011.20 52.58164.0408,625.22
W-BEAM GUARDRAIL m 164.0408,625.22
164.0408,625.22
0.0000.00

0030                          7017.00 6.70209.2001,401.64
REMOVE GUARDRAIL m 209.2001,401.64
209.2001,401.64
0.0000.00

0031                          7020.00 1,050.004.0004,200.00
BRIDGE APPROACH SECTIONS EACH4.0004,200.00
4.0004,200.00
0.0000.00

0032                          7021.70 1,617.002.0003,234.00
GUARDRAIL END TREATMENT, SRT-350 EACH2.0003,234.00
2.0003,234.00
0.0000.00

0033                          9188.50 27.50748.00020,570.00
SURFACING UNDER GUARDRAIL m2 748.00020,570.00
757.00020,817.50
0.0000.00

029                           7011.20 52.580.0000.00
W-BEAM GUARDRAIL m -1.905-100.16
-1.905-100.16
0.0000.00

037                           7011.20 52.580.0000.00
W-BEAM GUARDRAIL m -1.905-100.16
-1.905-100.16
0.0000.00

073                           7026.05 225.000.0000.00
W-THRIE BEAM TRANSITION SECTION EACH1.000225.00
1.000225.00
0.0000.00

074                           7026.05 225.000.0000.00
W-THRIE BEAM TRANSITION SECTION EACH1.000225.00
1.000225.00
0.0000.00

GROUP 7 GUARDRAILContracted49,993.86
Current50,243.53
In place50,491.04
This Estimate5,415.00

GROUP 10 GENERAL ITEMS
0034                          0001.08 0.5012,033.0006,016.50
BARRICADE, TYPE II BDAY12,033.0006,016.50
10,530.0005,265.00
0.0000.00

0035                          0001.10 2.00942.0001,884.00
BARRICADE, TYPE III BDAY942.0001,884.00
3,007.0006,014.00
0.0000.00

0036                          0001.30 2.25628.0001,413.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY628.0001,413.00
940.0002,115.00
0.0000.00

0037                          0001.90 0.508,371.0004,185.50
SIGN DAY EACH8,371.0004,185.50
12,906.0006,453.00
8.0004.00

0038                          0002.30 3.00300.000900.00
PAVEMENT MARKING REMOVAL m 2,060.0006,180.00
1,944.6705,834.01
0.0000.00

0039                          0002.39 3.001,800.0005,400.00
TEMPORARY PAVEMENT MARKING, TYPE II m 3,560.00010,680.00
3,550.00010,650.00
0.0000.00

0040                          0002.97 35.00314.00010,990.00
FLASHING ARROW PANEL DAY 314.00010,990.00
420.00014,700.00
1.00035.00

0041                          0003.10 200.0060.00012,000.00
FLAGGING DAY 60.00012,000.00
0.0000.00
0.0000.00

0042                          0003.51 29.00550.00015,950.00
INSTALL CONCRETE PROTECTION BARRIER m 305.0008,845.00
477.05013,834.45
0.0000.00

0043                          0003.58 3,500.002.0007,000.00
INERTIAL BARRIER SYSTEM EACH2.0007,000.00
0.0000.00
0.0000.00

0044                          0003.64 200.0010.0002,000.00
REPLACEMENT MODULE EACH10.0002,000.00
0.0000.00
0.0000.00

0045                          0010.04 2,400.001.0002,400.00
FIELD OFFICE EACH1.0002,400.00
0.0000.00
0.0000.00

0046                          0030.00 1,500.001.0001,500.00
MOBILIZATION LS 1.0001,500.00
1.0001,500.00
0.0000.00

069                           0001.46 0.250.0000.00
REFLECTORIZED CONE BDAY5,940.0001,485.00
8,016.0002,004.00
0.0000.00

GROUP 10 GENERAL ITEMSContracted71,639.00
Current76,579.00
In place68,369.46
This Estimate39.00

Totals for contractContracted1,067,380.45
Current1,091,873.58
In place1,064,825.42
This Estimate5,454.00