Return to District Map


Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0574 CONSTRUCTORS, INC.
Contract ID:4156
Estimate Number:0007
Pay Period End Date:09.19.2003
Contract Location:
MINDEN - GIBBONEstimate Type:PROG
Contractor:
CONSTRUCTORS, INC.Date Let:02.06.2003
1815 Y STREETDate Awarded:02.13.2003
PO BOX 80268Date Contract Executed:02.18.2003
Date Notice to Proceed:02.18.2003
LINCOLN NE 68501Date Work Began:06.09.2003
Phone:Date Physical Work Completed:
(402)434-1764Date Accepted:09.03.2003
Escrow Agent:
Surety Co:
UNIVERSAL SURETY COMPANY
Counties
BUFFALO
Project Number PCT Fed State Project Number Description
42156 000  0.000 IM-80-6(74)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$1,365,586.13$1,361,767.61$3,818.52
$1,500,014.51Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$1,365,586.13$1,361,767.61$3,818.52
$1,473,941.23Retainage$-13,655.86$-13,617.68$-38.18
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
91.04%Net Earnings$1,351,930.27$1,348,149.93$3,780.34
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$-5,660.00$-5,660.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments-$5,660.00-$5,660.00$.00
Payment$1,346,270.27$1,342,489.93$3,780.34
Project ManagerDiv. Head/Dist. Eng.
Kohmetscher, Lyle09.19.2003Meyer, Keith09.19.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve09.22.2003
Controller Div. Processed
Burling, Laurie09.22.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0001                          0001.00 50.00118.0005,900.00
SURVEILLANCE OF TEMPORARY TRAFFIC CONTROL DEVICES CDAY118.0005,900.00
30.0001,500.00
0.0000.00

0002                          0001.08 0.5011,860.0005,930.00
BARRICADE, TYPE II BDAY11,860.0005,930.00
12,891.0006,445.50
0.0000.00

0003                          0001.10 0.10821.00082.10
BARRICADE, TYPE III BDAY821.00082.10
543.00054.30
0.0000.00

0004                          0001.75 0.501,316.000658.00
TEMPORARY SIGN DAY EACH1,316.000658.00
106.00053.00
0.0000.00

0005                          0001.90 0.053,304.000165.20
SIGN DAY EACH3,304.000165.20
7,241.000362.05
0.0000.00

0006                          0001.98 0.0516.0000.80
CONTRACTOR FURNISHED SIGN EACH16.0000.80
9.0000.45
0.0000.00

0007                          0002.55 4.001,335.3605,341.44
OVERLAY BROKEN LINES STA 1,335.3605,341.44
1,334.8205,339.29
0.0000.00

0008                          0002.60 4.002,670.72010,682.88
OVERLAY SOLID LINES STA 2,670.72010,682.88
2,728.51010,914.04
0.0000.00

0009                          0002.61 18.05640.00011,552.00
PLOWABLE PAVEMENT MARKER EACH640.00011,552.00
589.00010,631.45
0.0000.00

0010                          0002.97 100.5065.0006,532.50
FLASHING ARROW PANEL DAY 65.0006,532.50
62.0006,231.00
0.0000.00

0011                          0003.10 185.0033.0006,105.00
FLAGGING DAY 33.0006,105.00
21.0003,885.00
0.0000.00

0012                          0003.35 10.005.00050.00
MOBILE TRAFFIC CONTROL OPERATION DAY 5.00050.00
0.0000.00
0.0000.00

0013                          0010.04 1,850.001.0001,850.00
FIELD OFFICE EACH1.0001,850.00
0.0000.00
0.0000.00

0014                          0030.90 146,200.001.000146,200.00
MOBILIZATION LS 1.000146,200.00
1.000146,200.00
0.0000.00

0015                          3040.11 132.2519.9002,631.77
CONCRETE PAVEMENT REPAIR, TYPE A, FULL DEPTH SY 19.9002,631.77
17.5002,314.38
0.0000.00

0016                          3040.12 115.85121.90014,122.12
CONCRETE PAVEMENT REPAIR, TYPE B, FULL DEPTH SY 121.90014,122.12
132.83415,388.82
0.0000.00

0017                          3040.13 108.5037.3004,047.05
CONCRETE PAVEMENT REPAIR, TYPE C, FULL DEPTH SY 37.3004,047.05
76.4808,298.08
0.0000.00

0018                          3041.25 685.004.0002,740.00
BITUMINOUS PATCHING TON 4.0002,740.00
2.5001,712.50
0.0000.00

0019                          3221.05 119.15202.30024,104.05
CONCRETE PAVEMENT, CLASS PR-3625 SY 202.30024,104.05
JOINT REPAIR 361.08943,023.75
0.0000.00

0020                          7490.03 0.3149,200.00015,252.00
4" YELLOW THERMOPLASTIC LF 49,200.00015,252.00
49,200.00015,252.00
0.0000.00

0021                          7490.04 0.3163,300.00019,623.00
4" WHITE THERMOPLASTIC LF 63,300.00019,623.00
62,524.00019,382.44
0.0000.00

0022                          7490.12 1.002,000.0002,000.00
12" WHITE THERMOPLASTIC LF 2,000.0002,000.00
1,505.4001,505.40
0.0000.00

0023                          9000.75 9.20500.0004,600.00
ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING, TYPE TON 500.0004,600.00
SPS 0.0000.00
0.0000.00

0024                          9005.00 44.70800.00035,760.00
ASPHALTIC CONCRETE FOR PATCHING, TYPE TON 800.00035,760.00
SP5(0.5) 0.0000.00
0.0000.00

0025                          9005.23 9.204,450.00040,940.00
ASPHALTIC CONCRETE, TYPE SPS TON 4,450.00040,940.00
4,796.57044,128.45
0.0000.00

0026                          9005.55 15.2016,640.000252,928.00
ASPHALTIC CONCRETE, TYPE SP5(0.5) TON 16,640.000252,928.00
17,687.630268,851.98
0.0000.00

0027                          9005.57 14.0012,760.000178,640.00
ASPHALTIC CONCRETE, TYPE SP5(0.375) TON 12,760.000178,640.00
12,390.610173,468.54
1.85025.90

0028                          9020.92 186.0027.0005,022.00
PERFORMANCE GRADED BINDER (58-28) FOR STATE MAINTENANCEPATCHING TON 27.0005,022.00
0.0000.00
0.0000.00

0029                          9021.03 186.00240.30044,695.80
PERFORMANCE GRADED BINDER (58-28) TON 240.30044,695.80
197.97836,823.90
-7.563-1,406.72

0030                          9021.04 235.001,758.400413,224.00
PERFORMANCE GRADED BINDER (70-28) TON 0.0000.00
0.0000.00
0.0000.00

0031                          9053.00 0.7536,510.00027,382.50
TACK COAT GAL 36,510.00027,382.50
28,800.00021,600.00
0.0000.00

0032                          9110.01 57.0040.0002,280.00
RENTAL OF LOADER, FULLY OPERATED HOUR40.0002,280.00
0.0000.00
0.0000.00

0033                          9110.02 70.0040.0002,800.00
RENTAL OF MOTOR GRADER, FULLY OPERATED HOUR40.0002,800.00
0.0000.00
0.0000.00

0034                          9110.03 45.0040.0001,800.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR40.0001,800.00
1.00045.00
0.0000.00

0035                          9110.07 35.0040.0001,400.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR40.0001,400.00
1.00035.00
0.0000.00

0036                          9111.00 10.009.00090.00
WATER MGAL9.00090.00
0.0000.00
0.0000.00

0037                          9170.00 270.0034.1229,212.94
EARTH SHOULDER CONSTRUCTION STA 34.1229,212.94
34.1229,212.94
0.0000.00

0038                          9179.23 38.30445.12617,048.33
COLD MILLING, CLASS 3 STA 445.12617,048.33
445.12617,048.32
0.0000.00

0039                          9179.24 243.70445.126108,477.21
COLD MILLING, CLASS 4 STA 445.126108,477.21
445.126108,477.21
0.0000.00

0040                          9179.43 11.60445.1265,163.46
COLD MILLING, CLASS 3 STA 445.1265,163.46
TYPE 'A' 445.1265,163.46
0.0000.00

0041                          9179.63 161.5055.6218,982.79
COLD MILLING, CLASS 3 STA 55.6218,982.79
TYPE 'B' 55.3808,943.87
0.0000.00

0042                          9179.65 78.9067.0705,291.82
COLD MILLING, CLASS 3 STA 67.0705,291.82
TYPE 'C' 67.0705,291.82
0.0000.00

0043                          9179.80 760.002.0001,520.00
MILLING CONCRETE FOR INLAYS EACH2.0001,520.00
2.0001,520.00
0.0000.00

0044                          9185.76 14.05890.24012,507.87
RUMBLE STRIPS, ASPHALT STA 890.24012,507.87
859.53012,076.40
0.0000.00

0045                          9300.52 7,500.001.0007,500.00
ASPHALT PAVEMENT SMOOTHNESS TESTING I/D LS 1.0007,500.00
1.0007,500.00
0.0000.00

0046                          L001.02 1,004.000.900903.60
SEEDING, TYPE B ACRE0.900903.60
0.950953.80
0.0000.00

0047                          L032.75 100.502.000201.00
MULCH TON 2.000201.00
2.300231.15
0.0000.00

4001                          9021.04 275.000.0000.00
PERFORMANCE GRADED BINDER (70-28) TON 816.640224,576.00
PG binder 78-28 MP-1 w polymer, top lift for SP-5(0.375) 555.015152,629.13
0.07320.08

4002                          9021.01 228.000.0000.00
PERFORMANCE GRADED BINDER (64-22) TON 941.760214,721.28
PG binder 64-22 w/o acid, Bottom Lift for SP-5(0.5) 846.893193,091.61
22.7165,179.25

GROUP 9 BITUMINOUSContracted1,473,941.23
Current1,500,014.51
In place1,365,586.03
This Estimate3,818.51

Totals for contractContracted1,473,941.23
Current1,500,014.51
In place1,365,586.03
This Estimate3,818.51