Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:0083 WERNER CONSTRUCTION, INC.
Contract ID:4903C
Estimate Number:0003
Pay Period End Date:11.19.2002
Contract Location:
ORD AREAEstimate Type:FINL
Contractor:
WERNER CONSTRUCTION, INC.Date Let:05.23.2002
129 E 2ND STDate Awarded:05.30.2002
PO BOX 1087Date Contract Executed:06.06.2002
Date Notice to Proceed:06.06.2002
HASTINGS NE 68902-1087Date Work Began:08.20.2002
Phone:Date Physical Work Completed:
(402)463-4545Date Accepted:
Escrow Agent:
Surety Co:
UNIVERSAL SURETY COMPANY
Counties
GREELEY
HOWARD
NANCE
SHERMAN
VALLEY
Project Number PCT Fed State Project Number Description
49903C 000  0.000 PM-D4(1006)  BITUMINOUS
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$231,525.82$231,713.94$-188.12
$243,381.79Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$231,525.82$231,713.94$-188.12
$243,609.39Retainage$.00$-2,317.14$2,317.14
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
95.13%Net Earnings$231,525.82$229,396.80$2,129.02
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$231,525.82$229,396.80$2,129.02
Project ManagerDiv. Head/Dist. Eng.
Zaruba, Arlen11.21.2002Meyer, Keith11.26.2002
Constr. Estimate Eng.Materials Eng.
Hitzeman, Bill12.03.2002Hall, David12.03.2002
Controller Div. Processed
Harring, Joyce12.12.2002
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 9 BITUMINOUS
0001                          0001.10 4.50108.000486.00
BARRICADE, TYPE III BDAY108.000486.00
87.000391.50
0.0000.00

0002                          0001.30 4.0054.000216.00
TYPE B HIGH INTENSITY WARNING LIGHT LDAY54.000216.00
0.0000.00
0.0000.00

0003                          0001.75 7.50142.0001,065.00
TEMPORARY SIGN DAY EACH142.0001,065.00
92.000690.00
0.0000.00

0004                          0001.90 2.001,642.0003,284.00
SIGN DAY EACH1,642.0003,284.00
1,840.0003,680.00
8.00016.00

0005                          0002.55 6.002,876.54417,259.26
OVERLAY BROKEN LINES STA 2,876.54417,259.26
2,921.55117,529.31
1.3718.23

0006                          0002.60 6.005,753.08834,518.53
OVERLAY SOLID LINES STA 5,753.08834,518.53
5,843.10235,058.61
2.54215.25

0007                          0003.10 185.0030.0005,550.00
FLAGGING DAY 30.0005,550.00
25.0004,625.00
0.0000.00

0008                          0003.20 285.0012.0003,420.00
FURNISHING AND OPERATING PILOT VEHICLE DAY 12.0003,420.00
9.0002,565.00
0.0000.00

0009                          0030.90 12,000.001.00012,000.00
MOBILIZATION LS 1.00012,000.00
1.00012,000.00
0.0000.00

0010                          9053.20 1.8092,117.000165,810.60
FOG SEAL GAL 92,117.000165,810.60
86,230.000155,214.00
0.0000.00

0011                          0096.00 -227.600.0000.00
DEDUCTION LS 1.000-227.60
Deduction for the cost of signs not returned. 1.000-227.60
1.000-227.60

GROUP 9 BITUMINOUSContracted243,609.39
Current243,381.79
In place231,525.82
This Estimate-188.12

Totals for contractContracted243,609.39
Current243,381.79
In place231,525.82
This Estimate-188.12