Nebraska Department of Roads | |
---|---|
Estimate Summary to Contractor | |
Vendor ID: | 2252 PAULSEN, INC. |
Contract ID: | 6316X |
Estimate Number: | 0004 |
Pay Period End Date: | 01.31.2003 |
Contract Location: | ||
WESTERN CANAL BR CROSSOVERS | Estimate Type: | PROG |
Contractor: | ||
PAULSEN, INC. | Date Let: | 08.07.2002 |
1116 EAST HWY 30 | Date Awarded: | 08.08.2002 |
P O BOX 17 | Date Contract Executed: | 08.15.2002 |
Date Notice to Proceed: | 08.15.2002 | |
COZAD NE 69130 | Date Work Began: | 09.23.2002 |
Phone: | Date Physical Work Completed: | |
(308)784-3333 | Date Accepted: | |
Escrow Agent: | ||
Surety Co: | ||
ST. PAUL FIRE AND MARINE INSURANCE COMPANY |
Counties |
---|
KEITH |
Project Number |   | PCT |   | Fed State Project Number |   | Description | |
---|---|---|---|---|---|---|---|
61316 000 |   | 0.000 |   | ER-80-3(127) |   | BITUMINOUS |
Total to Date | Prev to Date | This Estimate | ||
Current Contract Amt | Total Earnings | $301,326.06 | $296,308.56 | $5,017.50 |
$299,446.95 | Stockpiled Materials | $.00 | $.00 | $.00 |
Original Contract Amt | Gross Earnings | $301,326.06 | $296,308.56 | $5,017.50 |
$294,279.45 | Retainage | $-3,013.26 | $-2,963.09 | $-50.17 |
Escrow Amount | $.00 | $.00 | $.00 | |
Percent Complete | Securities Encumbered | $.00 | $.00 | $.00 |
100.63% | Net Earnings | $298,312.80 | $293,345.47 | $4,967.33 |
Liquidated Damages | $.00 | -$5,298.00 | $5,298.00 | |
Incentives | $.00 | $.00 | $.00 | |
Disincentives | $.00 | $.00 | $.00 | |
Other Contract Adj | $.00 | $.00 | $.00 | |
Appl of Training Adj | $.00 | $.00 | $.00 | |
Training Rates Adj | $.00 | $.00 | $.00 | |
Fuel Adj | $.00 | $.00 | $.00 | |
Bituminous Adj | $.00 | $.00 | $.00 | |
Autopay Adj | $.00 | $.00 | $.00 | |
Gasoline Adj | $.00 | $.00 | $.00 | |
Other Adj | $.00 | $.00 | $.00 | |
Price Adj | $.00 | $.00 | $.00 | |
Substandard Item Adj | $.00 | $.00 | $.00 | |
Asphalt Adj | $.00 | $.00 | $.00 | |
Diesel Fuel Adj | $.00 | $.00 | $.00 | |
Petrol Adj | $.00 | $.00 | $.00 | |
Total for Adjustments | $.00 | -$5,298.00 | $5,298.00 | |
Payment | $298,312.80 | $288,047.47 | $10,265.33 | |
Project Manager | Div. Head/Dist. Eng. | |||
Brinker, Gary | 01.31.2003 | Bartos, Steve | 01.31.2003 | |
Constr. Estimate Eng. | Materials Eng. | |||
Bartos, Steve | 01.31.2003 | |||
Controller Div. Processed | ||||
Burling, Laurie | 01.31.2003 |
Detailed breakdown of stockpiled materials | ||||
---|---|---|---|---|
Total remaining for contract: | 0.00 |
1. Contracted | |||
---|---|---|---|
2. Current | |||
3. To date | |||
Item Nbr Item Code | Unit Price | 4. This Est | |
Item Description | Units | Qty | Amount |
GROUP 9 BITUMINOUS | |||
0001 A780.10 | 20,000.00 | 1.000 | 20,000.00 |
CROSSOVER LIGHTING SYSTEM | EACH | 1.000 | 20,000.00 |
AT STA. 1332+00 | 1.000 | 20,000.00 | |
0.000 | 0.00 | ||
0002 A780.11 | 20,000.00 | 1.000 | 20,000.00 |
CROSSOVER LIGHTING SYSTEM | EACH | 1.000 | 20,000.00 |
AT STA. 1365+00 | 1.000 | 20,000.00 | |
0.000 | 0.00 | ||
0003 P600.12 | 13.40 | 500.000 | 6,700.00 |
12" CULVERT PIPE, TYPE 2,3,4,5,7 OR 8 | LF | 500.000 | 6,700.00 |
500.000 | 6,700.00 | ||
0.000 | 0.00 | ||
0004 0001.08 | 0.50 | 1,760.000 | 880.00 |
BARRICADE, TYPE II | BDAY | 1,760.000 | 880.00 |
8,862.000 | 4,431.00 | ||
0.000 | 0.00 | ||
0005 0001.10 | 2.65 | 246.000 | 651.90 |
BARRICADE, TYPE III | BDAY | 246.000 | 651.90 |
278.000 | 736.70 | ||
3.000 | 7.95 | ||
0006 0001.75 | 6.75 | 480.000 | 3,240.00 |
TEMPORARY SIGN DAY | EACH | 480.000 | 3,240.00 |
470.000 | 3,172.50 | ||
20.000 | 135.00 | ||
0007 0001.90 | 0.90 | 984.000 | 885.60 |
SIGN DAY | EACH | 984.000 | 885.60 |
1,384.000 | 1,245.60 | ||
-106.000 | -95.40 | ||
0008 0002.97 | 58.00 | 40.000 | 2,320.00 |
FLASHING ARROW PANEL | DAY | 40.000 | 2,320.00 |
45.000 | 2,610.00 | ||
0.000 | 0.00 | ||
0009 0003.10 | 190.00 | 10.000 | 1,900.00 |
FLAGGING | DAY | 10.000 | 1,900.00 |
0.000 | 0.00 | ||
0.000 | 0.00 | ||
0010 0030.90 | 29,500.00 | 1.000 | 29,500.00 |
MOBILIZATION | LS | 1.000 | 29,500.00 |
1.000 | 29,500.00 | ||
0.000 | 0.00 | ||
0011 1033.00 | 1,700.00 | 26.220 | 44,574.00 |
ROADWAY GRADING | STA | 26.220 | 44,574.00 |
26.370 | 44,829.00 | ||
0.000 | 0.00 | ||
0012 1101.00 | 3.85 | 1,045.000 | 4,023.25 |
REMOVE PAVEMENT | SY | 1,045.000 | 4,023.25 |
919.000 | 3,538.15 | ||
3.000 | 11.55 | ||
0013 4310.12 | 120.00 | 2.000 | 240.00 |
12" FLARED-END SECTION | EACH | 2.000 | 240.00 |
2.000 | 240.00 | ||
0.000 | 0.00 | ||
0014 9188.25 | 25.30 | 6,299.000 | 159,364.70 |
MEDIAN CROSSOVER SURFACING | SY | 6,299.000 | 159,364.70 |
6,299.000 | 159,364.70 | ||
0.000 | 0.00 | ||
4001 1101.25 | 1.25 | 0.000 | 0.00 |
SAWING PAVEMENT | LF | 3,350.000 | 4,187.50 |
3,182.700 | 3,978.38 | ||
3,182.700 | 3,978.38 | ||
4002 4976.05 | 980.00 | 0.000 | 0.00 |
ADDITIONAL WORK | LS | 1.000 | 980.00 |
1.000 | 980.00 | ||
1.000 | 980.00 | ||
GROUP 9 BITUMINOUS | Contracted | 294,279.45 | |
Current | 299,446.95 | ||
In place | 301,326.03 | ||
This Estimate | 5,017.48 | ||
Totals for contract | Contracted | 294,279.45 | |
Current | 299,446.95 | ||
In place | 301,326.03 | ||
This Estimate | 5,017.48 |