Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:1744 REIMAN CORP.
Contract ID:6342
Estimate Number:0002
Pay Period End Date:08.02.2003
Contract Location:
BIG SPRINGS WESTEstimate Type:PROG
Contractor:
REIMAN CORP.Date Let:06.26.2003
2400 WEST COLLEGE DRDate Awarded:06.30.2003
PO BOX 1007Date Contract Executed:07.08.2003
Date Notice to Proceed:07.08.2003
CHEYENNE WY 82003Date Work Began:
Phone:Date Physical Work Completed:
(307)632-8971Date Accepted:
Escrow Agent:
Surety Co:
TRAVELERS CASUALTY AND SURETY COMPANY
Counties
DEUEL
Project Number PCT Fed State Project Number Description
61342 000  0.000 ER-80-3(130)  BRIDGE
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$155,049.50$17,724.40$137,325.10
$727,075.47Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$155,049.50$17,724.40$137,325.10
$727,075.47Retainage$-1,550.50$-177.24$-1,373.26
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
21.33%Net Earnings$153,499.00$17,547.16$135,951.84
Liquidated Damages$.00$.00$.00
Incentives$.00$.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$.00$.00$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$.00$.00$.00
Payment$153,499.00$17,547.16$135,951.84
Project ManagerDiv. Head/Dist. Eng.
Morrell, Richard08.04.2003O'Donnell, Les08.04.2003
Constr. Estimate Eng.Materials Eng.
Bartos, Steve08.04.2003
Controller Div. Processed
Burling, Laurie08.05.2003
Detailed breakdown of stockpiled materials
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 6 BRIDGE AT STA. 14+95.52
0001                          0001.08 0.501,170.000585.00
BARRICADE, TYPE II BDAY1,170.000585.00
152.00076.00
152.00076.00

0002                          0001.10 2.651,782.0004,722.30
BARRICADE, TYPE III BDAY1,782.0004,722.30
200.000530.00
176.000466.40

0003                          0001.75 2.65656.0001,738.40
TEMPORARY SIGN DAY EACH656.0001,738.40
12.00031.80
12.00031.80

0004                          0001.90 2.403,614.0008,673.60
SIGN DAY EACH3,614.0008,673.60
782.0001,876.80
590.0001,416.00

0005                          0001.98 2.40850.0002,040.00
CONTRACTOR FURNISHED SIGN EACH850.0002,040.00
274.000657.60
274.000657.60

0006                          0002.97 53.0034.0001,802.00
FLASHING ARROW PANEL DAY 34.0001,802.00
4.000212.00
4.000212.00

0007                          0003.51 13.30837.50011,138.75
INSTALL CONCRETE PROTECTION BARRIER LF 837.50011,138.75
721.0009,589.30
721.0009,589.30

0008                          0003.58 2,650.004.00010,600.00
INERTIAL BARRIER SYSTEM EACH4.00010,600.00
4.00010,600.00
4.00010,600.00

0009                          0003.64 265.005.0001,325.00
REPLACEMENT MODULE EACH5.0001,325.00
0.0000.00
0.0000.00

0010                          0005.10 200.00134.00026,800.00
TRAFFIC CONTROL MANAGEMENT DAY 134.00026,800.00
20.0004,000.00
14.0002,800.00

0011                          0030.60 60,000.001.00060,000.00
MOBILIZATION LS 1.00060,000.00
1.00060,000.00
1.00060,000.00

0012                          1011.00 8.0065.000520.00
WATER MGAL65.000520.00
0.0000.00
0.0000.00

0013                          1030.00 19.001,720.00032,680.00
EARTHWORK MEASURED IN EMBANKMENT CY 1,720.00032,680.00
0.0000.00
0.0000.00

0014                          2001.00 28.00200.0005,600.00
GRAVEL SURFACE COURSE CY 200.0005,600.00
0.0000.00
0.0000.00

0015                          2005.50 20.00395.0007,900.00
CLAY SURFACE COURSE CY 395.0007,900.00
0.0000.00
0.0000.00

0016                          2009.10 630.007.6104,794.30
GRAVEL EMBEDMENT STA 7.6104,794.30
0.0000.00
0.0000.00

0017                          6000.10 8,000.001.0008,000.00
ABUTMENT NO.1 EXCAVATION LS 1.0008,000.00
1.0008,000.00
0.0000.00

0018                          6000.11 8,000.001.0008,000.00
ABUTMENT NO.2 EXCAVATION LS 1.0008,000.00
1.0008,000.00
0.0000.00

0019                          6000.20 12,500.001.00012,500.00
PIER NO.1 EXCAVATION LS 1.00012,500.00
1.00012,500.00
1.00012,500.00

0020                          6005.78 1,000.008.0008,000.00
EXPANSION BEARING, TFE TYPE EACH8.0008,000.00
0.0000.00
0.0000.00

0021                          6005.83 820.008.0006,560.00
FIXED BEARING EACH8.0006,560.00
0.0000.00
0.0000.00

0022                          6010.22 360.00193.20069,552.00
CLASS 47B-3000 CONCRETE FOR BRIDGE CY 193.20069,552.00
0.0000.00
0.0000.00

0023                          6010.26 400.00267.500107,000.00
CLASS 47BD-4000 CONCRETE FOR BRIDGE CY 267.500107,000.00
0.0000.00
0.0000.00

0024                          6011.11 165,300.001.000165,300.00
PRECAST/PRESTRESSED CONCRETE SUPERSTRUCTURE LS 1.000165,300.00
AT STA.14+95.52 0.0000.00
0.0000.00

0025                          6030.00 18,000.001.00018,000.00
PREPARATION OF BRIDGE EACH1.00018,000.00
AT STA. 14+95.52 0.4007,200.00
0.4007,200.00

0026                          6107.00 71.0035.0002,485.00
CONCRETE SLOPE PROTECTION SY 35.0002,485.00
0.0000.00
0.0000.00

0027                          6131.50 0.6361,900.00038,997.00
EPOXY COATED REINFORCING STEEL LB 61,900.00038,997.00
0.0000.00
0.0000.00

0028                          6210.50 35.00620.00021,700.00
PIPE PILING LF 620.00021,700.00
617.16821,600.88
617.16821,600.88

0029                          6310.00 10.203,831.20039,078.24
STEEL SHEET PILING SF 3,831.20039,078.24
950.0009,690.00
950.0009,690.00

0030                          7011.20 15.8550.000792.50
W-BEAM GUARDRAIL LF 50.000792.50
0.0000.00
0.0000.00

0031                          7011.30 15.85387.5006,141.88
THRIE-BEAM GUARDRAIL LF 387.5006,141.88
0.0000.00
0.0000.00

0032                          7017.00 3.20437.5001,400.00
REMOVE GUARDRAIL LF 437.5001,400.00
151.600485.12
151.600485.12

0033                          7020.00 1,800.004.0007,200.00
BRIDGE APPROACH SECTIONS EACH4.0007,200.00
0.0000.00
0.0000.00

0034                          7022.50 4,650.002.0009,300.00
BULLNOSE-12.5' EACH2.0009,300.00
0.0000.00
0.0000.00

0035                          7024.27 1,600.004.0006,400.00
GUARDRAIL END TREATMENT, TYPE II EACH4.0006,400.00
0.0000.00
0.0000.00

0036                          L020.00 1.855,270.0009,749.50
EROSION CONTROL SY 5,270.0009,749.50
0.0000.00
0.0000.00

GROUP 6 BRIDGE AT STA. 14+95.52Contracted727,075.47
Current727,075.47
In place155,049.50
This Estimate137,325.10

Totals for contractContracted727,075.47
Current727,075.47
In place155,049.50
This Estimate137,325.10