| | | 1. Contracted
|
---|
| | | 2. Current
|
---|
| | | 3. To date
|
---|
Item Nbr Item Code | Unit Price | | 4. This Est
|
---|
Item Description | Units | Qty | Amount
|
---|
GROUP 6 BRIDGE AT STA. 16+82 | | |
|
0001 0001.10 | 2.26 | 1,110.000 | 2,508.60
|
BARRICADE, TYPE III | BDAY | 1,110.000 | 2,508.60
|
| | 1,470.000 | 3,322.20
|
| | 0.000 | 0.00
|
| | |
|
0002 0001.90 | 1.41 | 888.000 | 1,252.08
|
SIGN DAY | EACH | 888.000 | 1,252.08
|
| | 1,065.000 | 1,501.65
|
| | 0.000 | 0.00
|
| | |
|
0003 0001.98 | 0.85 | 666.000 | 566.10
|
CONTRACTOR FURNISHED SIGN | EACH | 666.000 | 566.10
|
| | 196.000 | 166.60
|
| | 0.000 | 0.00
|
| | |
|
0004 0030.60 | 32,577.90 | 1.000 | 32,577.90
|
MOBILIZATION | LS | 1.000 | 32,577.90
|
| | 1.000 | 32,577.90
|
| | 0.000 | 0.00
|
| | |
|
0005 1009.00 | 3,955.00 | 1.000 | 3,955.00
|
GENERAL CLEARING AND GRUBBING | LS | 1.000 | 3,955.00
|
| | 1.000 | 3,955.00
|
| | 0.000 | 0.00
|
| | |
|
0006 1011.00 | 9.04 | 70.000 | 632.80
|
WATER | MGAL | 70.000 | 632.80
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0007 1030.00 | 4.01 | 4,636.000 | 18,590.36
|
EARTHWORK MEASURED IN EMBANKMENT | CY | 4,636.000 | 18,590.36
|
| | 4,636.000 | 18,590.36
|
| | 0.000 | 0.00
|
| | |
|
0008 4043.00 | 28.25 | 50.000 | 1,412.50
|
REMOVE CULVERT PIPE | LF | 50.000 | 1,412.50
|
| | 81.000 | 2,288.25
|
| | 0.000 | 0.00
|
| | |
|
0009 4050.01 | 8.48 | 385.000 | 3,264.80
|
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS | CY | 385.000 | 3,264.80
|
| | 385.000 | 3,264.80
|
| | 0.000 | 0.00
|
| | |
|
0010 4350.18 | 22.43 | 107.000 | 2,400.01
|
18" CORRUGATED METAL PIPE | LF | 107.000 | 2,400.01
|
| | 107.000 | 2,400.01
|
| | 0.000 | 0.00
|
| | |
|
0011 4360.18 | 135.60 | 1.000 | 135.60
|
18" METAL FLARED-END SECTION | EACH | 1.000 | 135.60
|
| | 1.000 | 135.60
|
| | 0.000 | 0.00
|
| | |
|
0012 6000.10 | 1,130.00 | 1.000 | 1,130.00
|
ABUTMENT NO.1 EXCAVATION | LS | 1.000 | 1,130.00
|
| | 1.000 | 1,130.00
|
| | 0.000 | 0.00
|
| | |
|
0013 6000.11 | 1,130.00 | 1.000 | 1,130.00
|
ABUTMENT NO.2 EXCAVATION | LS | 1.000 | 1,130.00
|
| | 1.000 | 1,130.00
|
| | 0.000 | 0.00
|
| | |
|
0014 6001.00 | 1,073.50 | 1.000 | 1,073.50
|
BENT NO.1 EXCAVATION | LS | 1.000 | 1,073.50
|
| | 1.000 | 1,073.50
|
| | 0.000 | 0.00
|
| | |
|
0015 6001.01 | 1,073.50 | 1.000 | 1,073.50
|
BENT NO.2 EXCAVATION | LS | 1.000 | 1,073.50
|
| | 1.000 | 1,073.50
|
| | 0.000 | 0.00
|
| | |
|
0016 6010.22 | 340.58 | 142.920 | 48,675.69
|
CLASS 47B-3000 CONCRETE FOR BRIDGE | CY | 148.700 | 50,644.25
|
| | 148.700 | 50,644.24
|
| | 0.000 | 0.00
|
| | |
|
0017 6010.26 | 334.75 | 187.430 | 62,742.19
|
CLASS 47BD-4000 CONCRETE FOR BRIDGE | CY | 187.430 | 62,742.19
|
| | 187.430 | 62,742.19
|
| | 0.000 | 0.00
|
| | |
|
0018 6020.00 | 0.52 | 53,520.000 | 27,830.40
|
REINFORCING STEEL FOR BRIDGE | LB | 53,520.000 | 27,830.40
|
| | 53,520.000 | 27,830.40
|
| | 0.000 | 0.00
|
| | |
|
0019 6040.00 | 2,090.50 | 1.000 | 2,090.50
|
REMOVE STRUCTURE | EACH | 1.000 | 2,090.50
|
AT STA. 16+70 | | 1.000 | 2,090.50
|
| | 0.000 | 0.00
|
| | |
|
0020 6080.00 | 1.12 | 1,520.000 | 1,702.40
|
STRUCTURAL STEEL FOR SUBSTRUCTURE | LB | 1,520.000 | 1,702.40
|
| | 1,520.000 | 1,702.40
|
| | 0.000 | 0.00
|
| | |
|
0021 6105.02 | 43.15 | 1,135.000 | 48,975.25
|
ROCK RIPRAP, TYPE B | TON | 1,135.000 | 48,975.25
|
| | 1,060.740 | 45,770.93
|
| | 119.030 | 5,136.14
|
| | |
|
0022 6210.12 | 16.73 | 1,320.000 | 22,083.60
|
HP 10"X42# STEEL PILING | LF | 1,380.000 | 23,087.40
|
| | 1,380.000 | 23,087.40
|
| | 0.000 | 0.00
|
| | |
|
0023 6310.00 | 11.95 | 2,458.000 | 29,373.10
|
STEEL SHEET PILING | SF | 2,458.000 | 29,373.10
|
| | 2,458.000 | 29,373.10
|
| | 0.000 | 0.00
|
| | |
|
0024 L006.00 | 113.00 | 1.000 | 113.00
|
COVER CROP SEEDING | ACRE | 1.000 | 113.00
|
| | 1.000 | 113.00
|
| | 0.000 | 0.00
|
| | |
|
4000 6210.42 | 83.65 | 0.000 | 0.00
|
HP 10"X42#, PILE SPLICES | EACH | 6.000 | 501.90
|
In accordance with Para 3, Subsection 703.05 of 1997 Standard Specs. for Highway Construction | | 6.000 | 501.90
|
| | 0.000 | 0.00
|
| | |
|
GROUP 6 BRIDGE AT STA. 16+82 | | Contracted | 315,288.89
|
| | Current | 318,763.14
|
| | In place | 316,465.43
|
| | This Estimate | 5,136.14
|
| | |
|
Totals for contract | | Contracted | 315,288.89
|
---|
| | Current | 318,763.14
|
---|
| | In place | 316,465.43
|
---|
| | This Estimate | 5,136.14
|
---|