| | | 1. Contracted
|
---|
| | | 2. Current
|
---|
| | | 3. To date
|
---|
Item Nbr Item Code | Unit Price | | 4. This Est
|
---|
Item Description | Units | Qty | Amount
|
---|
GROUP 4 CULVERTS | | |
|
0001 0001.08 | 0.50 | 300.000 | 150.00
|
BARRICADE, TYPE II | BDAY | 300.000 | 150.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0002 0001.10 | 1.50 | 194.000 | 291.00
|
BARRICADE, TYPE III | BDAY | 194.000 | 291.00
|
| | 732.000 | 1,098.00
|
| | 150.000 | 225.00
|
| | |
|
0003 0001.75 | 5.00 | 20.000 | 100.00
|
TEMPORARY SIGN DAY | EACH | 20.000 | 100.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0004 0001.90 | 0.75 | 2,134.000 | 1,600.50
|
SIGN DAY | EACH | 2,134.000 | 1,600.50
|
| | 1,536.000 | 1,152.00
|
| | 240.000 | 180.00
|
| | |
|
0005 0003.10 | 250.00 | 20.000 | 5,000.00
|
FLAGGING | DAY | 20.000 | 5,000.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0006 0010.04 | 3,000.00 | 1.000 | 3,000.00
|
FIELD OFFICE | EACH | 1.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0007 0030.40 | 62,000.00 | 1.000 | 62,000.00
|
MOBILIZATION | LS | 1.000 | 62,000.00
|
| | 0.620 | 38,440.00
|
| | 0.000 | 0.00
|
| | |
|
0008 1009.00 | 3,500.00 | 1.000 | 3,500.00
|
GENERAL CLEARING AND GRUBBING | LS | 1.000 | 3,500.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0009 1011.00 | 10.00 | 231.000 | 2,310.00
|
WATER | MGAL | 231.000 | 2,310.00
|
| | 300.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
0010 1012.00 | 100.00 | 12.000 | 1,200.00
|
RIGHT-OF-WAY MARKERS | EACH | 12.000 | 1,200.00
|
| | 3.000 | 300.00
|
| | 3.000 | 300.00
|
| | |
|
0011 1030.00 | 2.96 | 15,160.000 | 44,873.60
|
EARTHWORK MEASURED IN EMBANKMENT | CY | 15,160.000 | 44,873.60
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0012 1102.00 | 2.50 | 468.000 | 1,170.00
|
REMOVE ASPHALT SURFACE | SY | 468.000 | 1,170.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0013 1120.00 | 500.00 | 1.000 | 500.00
|
REMOVE DISCHARGE STRUCTURE | EACH | 1.000 | 500.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0014 1121.00 | 350.00 | 1.000 | 350.00
|
REMOVE CONCRETE FLUME | EACH | 1.000 | 350.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0015 4024.74 | 2,000.00 | 2.000 | 4,000.00
|
CONCRETE FLUME, TYPE V | EACH | 2.000 | 4,000.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0016 4044.00 | 5,000.00 | 1.000 | 5,000.00
|
PREPARATION OF STRUCTURE | EACH | 1.000 | 5,000.00
|
AT STA. 1571+86 | | 1.000 | 5,000.00
|
| | 0.250 | 1,250.00
|
| | |
|
0017 4044.01 | 3,000.00 | 1.000 | 3,000.00
|
PREPARATION OF STRUCTURE | EACH | 1.000 | 3,000.00
|
AT STA. 1572+37 | | 1.000 | 3,000.00
|
| | 0.000 | 0.00
|
| | |
|
0018 4050.01 | 15.00 | 111.000 | 1,665.00
|
EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS | CY | 111.000 | 1,665.00
|
| | 1.000 | 15.00
|
| | 0.000 | 0.00
|
| | |
|
0019 4051.01 | 10.00 | 1,263.000 | 12,630.00
|
EXCAVATION FOR BOX CULVERTS | CY | 1,263.000 | 12,630.00
|
| | 800.000 | 8,000.00
|
| | 0.000 | 0.00
|
| | |
|
0020 4100.06 | 700.00 | 3.700 | 2,590.00
|
CLASS 47B-3000 OR AX-3000 CONCRETE FOR HEADWALL | CY | 3.700 | 2,590.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0021 4101.06 | 210.00 | 633.740 | 133,085.40
|
CLASS 47B-3000 OR AX-3000 CONCRETE FOR BOX CULVERT | CY | 633.740 | 133,085.40
|
| | 431.680 | 90,652.80
|
| | 118.600 | 24,906.00
|
| | |
|
0022 4150.00 | 2.00 | 539.000 | 1,078.00
|
REINFORCING STEEL FOR HEADWALL | LB | 539.000 | 1,078.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0023 4151.00 | 0.60 | 64,128.000 | 38,476.80
|
REINFORCING STEEL FOR BOX CULVERT | LB | 64,128.000 | 38,476.80
|
| | 43,735.050 | 26,241.03
|
| | 11,998.350 | 7,199.01
|
| | |
|
0024 4880.24 | 175.50 | 64.000 | 11,232.00
|
JACKING 24" CULVERT PIPE, TYPE 2 CLASS IV | LF | 64.000 | 11,232.00
|
| | 64.000 | 11,232.00
|
| | 0.000 | 0.00
|
| | |
|
0025 8111.00 | 450.00 | 5.265 | 2,369.25
|
SHOULDER SUBGRADE PREPARATION | STA | 5.265 | 2,369.25
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0026 9005.23 | 95.00 | 140.000 | 13,300.00
|
ASPHALTIC CONCRETE, TYPE SPS | TON | 140.000 | 13,300.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0027 9021.03 | 215.00 | 7.560 | 1,625.40
|
PERFORMANCE GRADED BINDER (58-28) | TON | 7.560 | 1,625.40
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0028 9030.00 | 7.50 | 466.500 | 3,498.75
|
CONSTRUCTING ASPHALTIC CONCRETE CURB | LF | 466.500 | 3,498.75
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0029 9053.00 | 4.45 | 70.000 | 311.50
|
TACK COAT | GAL | 70.000 | 311.50
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0030 L020.01 | 6.38 | 118.000 | 752.84
|
EROSION CONTROL, TYPE A | SY | 118.000 | 752.84
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0031 L020.08 | 6.51 | 127.000 | 826.77
|
EROSION CONTROL, TYPE AA | SY | 127.000 | 826.77
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0032 L020.10 | 1.63 | 7,078.000 | 11,537.14
|
EROSION CONTROL, TYPE HV | SY | 7,078.000 | 11,537.14
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0033 L021.06 | 18.00 | 44.000 | 792.00
|
EROSION CHECKS, TYPE HV | BALE | 44.000 | 792.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0034 P120.24 | 91.00 | 44.000 | 4,004.00
|
24" CULVERT PIPE, TYPE 2 | LF | 44.000 | 4,004.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0035 P128.24 | 44.00 | 64.000 | 2,816.00
|
24" CULVERT PIPE, TYPE 2 CLASS IV | LF | 64.000 | 2,816.00
|
| | 64.000 | 2,816.00
|
| | 0.000 | 0.00
|
| | |
|
0036 P300.36 | 72.00 | 12.000 | 864.00
|
36" CULVERT PIPE, TYPE 3,4 OR 5 | LF | 12.000 | 864.00
|
| | 8.000 | 576.00
|
| | 0.000 | 0.00
|
| | |
|
0037 P402.15 | 32.00 | 95.000 | 3,040.00
|
15" CULVERT PIPE, TYPE 3,4,5 OR 6 | LF | 95.000 | 3,040.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
0038 P402.24 | 34.00 | 110.000 | 3,740.00
|
24" CULVERT PIPE, TYPE 3,4,5 OR 6 | LF | 110.000 | 3,740.00
|
| | 0.000 | 0.00
|
| | 0.000 | 0.00
|
| | |
|
GROUP 4 CULVERTS | | Contracted | 388,279.95
|
| | Current | 388,279.95
|
| | In place | 191,522.83
|
| | This Estimate | 34,060.01
|
| | |
|
Totals for contract | | Contracted | 388,279.95
|
---|
| | Current | 388,279.95
|
---|
| | In place | 191,522.83
|
---|
| | This Estimate | 34,060.01
|
---|