Nebraska Department of Roads
Estimate Summary to Contractor
Vendor ID:1809 CAPITAL CONTRACTORS, INC.
Contract ID:8688
Estimate Number:0015
Pay Period End Date:11.24.2001
Contract Location:
SPRINGVIEW SOUTHEstimate Type:PROG
Contractor:
CAPITAL CONTRACTORS, INC.Date Let:01.11.2001
1001 N 9TH STDate Awarded:01.18.2001
PO BOX 80098Date Contract Executed:02.08.2001
Date Notice to Proceed:02.08.2001
LINCOLN NE 68501Date Work Began:04.02.2001
Phone:Date Physical Work Completed:
(402)476-1021Date Accepted:
Escrow Agent:
Surety Co:
UNIVERSAL SURETY COMPANY
Counties
BROWN
KEYA PAHA
Project Number PCT Fed State Project Number Description
80688 000  0.000 EACSTPD-183-4(108)  GR BR GDRL
Total to DatePrev to DateThis Estimate
Current Contract AmtTotal Earnings$2,171,225.87$2,152,659.11$18,566.76
$2,207,140.53Stockpiled Materials$.00$.00$.00
Original Contract AmtGross Earnings$2,171,225.87$2,152,659.11$18,566.76
$2,204,241.60Retainage$-21,712.26$-21,526.59$-185.67
Escrow Amount$.00$.00$.00
Percent CompleteSecurities Encumbered$.00$.00$.00
98.37%Net Earnings$2,149,513.61$2,131,132.52$18,381.09
Liquidated Damages$.00$.00$.00
Incentives$13,500.00$13,500.00$.00
Disincentives$.00$.00$.00
Other Contract Adj$.00$.00$.00
Appl of Training Adj$.00$.00$.00
Training Rates Adj$.00$.00$.00
Fuel Adj$-164.34$-164.34$.00
Bituminous Adj$.00$.00$.00
Autopay Adj$.00$.00$.00
Gasoline Adj$.00$.00$.00
Other Adj$.00$.00$.00
Price Adj$.00$.00$.00
Substandard Item Adj$.00$.00$.00
Asphalt Adj$.00$.00$.00
Diesel Fuel Adj$.00$.00$.00
Petrol Adj$.00$.00$.00
Total for Adjustments$13,335.66$13,335.66$.00
Payment$2,162,849.27$2,144,468.18$18,381.09
Project ManagerDiv. Head/Dist. Eng.
Rudnick, Michael11.30.2001Kovar, Mark11.30.2001
Constr. Estimate Eng.Materials Eng.
Bartos, Steve12.03.2001
Controller Div. Processed
Burling, Laurie12.03.2001
Detailed breakdown of stockpiled materials
Est Nbr:0005
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00576071.11 STEEL SUPERSTRUCTURE
S.P. Initial Payment157,980.0013-S-01
STEEL SUPERSTURCTURE
00586080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Initial Payment9,000.0013-S-01
STRUCTURAL STEEL FOR SUBSTRUCTURE
01046071.11 STEEL SUPERSTRUCTURE
S.P. Initial Payment353,500.0014-S-01
STEEL SUPERSTRUCTURE
01056080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Initial Payment6,450.0014-S-01
STRUCTURAL STEEL FOR SUBSTRUCTURE
Total for estimate 0005:526,930.00
Est Nbr:0007
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00586080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Adjustment-9,000.0013-S-01
STRUCTURAL STEEL FOR SUBSTRUCTURE
00996005.78 EXPANSION BEARING, TFE TYPE
S.P. Initial Payment10,200.00E20011
Expansion Bearing TFE Type
Total for estimate 0007:1,200.00
Est Nbr:0008
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00576071.11 STEEL SUPERSTRUCTURE
S.P. Adjustment-157,980.0013-S-01
STEEL SUPERSTURCTURE
01046071.11 STEEL SUPERSTRUCTURE
S.P. Adjustment-88,375.0014-S-01
STEEL SUPERSTRUCTURE
Total for estimate 0008:-246,355.00
Est Nbr:0009
Item NbrItem CdItem DescAdj AmtInvoice Nbr
00996005.78 EXPANSION BEARING, TFE TYPE
S.P. Adjustment-10,200.00E20011
Expansion Bearing TFE Type
01046071.11 STEEL SUPERSTRUCTURE
S.P. Adjustment-265,125.0014-S-01
STEEL SUPERSTRUCTURE
Total for estimate 0009:-275,325.00
Est Nbr:0012
Item NbrItem CdItem DescAdj AmtInvoice Nbr
01056080.00 STRUCTURAL STEEL FOR SUBSTRUCTURE
S.P. Adjustment-6,450.0014-S-01
STRUCTURAL STEEL FOR SUBSTRUCTURE
Total for estimate 0012:-6,450.00
Total remaining for contract:0.00
1. Contracted
2. Current
3. To date
Item Nbr        Item CodeUnit Price4. This Est
Item DescriptionUnitsQtyAmount
GROUP 1 GRADING
0001                          L020.01 7.30192.0001,401.60
EROSION CONTROL, TYPE A m2 192.0001,401.60
192.0001,401.60
0.0000.00

0002                          L020.07 3.503,441.00012,043.50
EROSION CONTROL, TYPE B-1 m2 3,441.00012,043.50
3,441.00012,043.50
0.0000.00

0003                          L022.25 11.201,434.00016,060.80
FABRIC SILT FENCE, TYPE COIR FIBER m 1,434.00016,060.80
1,300.00014,560.00
0.0000.00

0004                          P402.15 100.0077.0007,700.00
375 mm CULVERT PIPE, TYPE 3,4,5 OR 6 m 77.0007,700.00
77.0007,700.00
0.0000.00

0005                          0030.10 23,000.001.00023,000.00
MOBILIZATION LS 1.00023,000.00
1.00023,000.00
0.0000.00

0006                          1009.00 1,000.001.0001,000.00
GENERAL CLEARING AND GRUBBING LS 1.0001,000.00
1.0001,000.00
0.0000.00

0007                          1011.00 1.79745.0001,333.55
WATER kL 745.0001,333.55
0.0000.00
0.0000.00

0008                          1012.00 74.0010.000740.00
RIGHT-OF-WAY MARKERS EACH10.000740.00
13.000962.00
0.0000.00

0009                          1030.00 4.8018,416.00088,396.80
EARTHWORK MEASURED IN EMBANKMENT m3 18,416.00088,396.80
18,416.00088,396.80
0.0000.00

0010                          1040.00 0.4721,240.0009,982.80
SLOPE PROTECTION m2 21,240.0009,982.80
26,510.10012,459.75
0.0000.00

0011                          1040.06 80.0024.0001,920.00
SLOPE PROTECTION MULCH Mg 24.0001,920.00
26.8162,145.28
0.0000.00

0012                          1102.00 2.862,867.0008,199.62
REMOVE ASPHALT SURFACE m2 2,867.0008,199.62
2,867.0008,199.62
0.0000.00

0013                          1109.00 5.0084.000420.00
REMOVE CURB m 84.000420.00
84.000420.00
0.0000.00

0014                          1120.00 400.007.0002,800.00
REMOVE DISCHARGE STRUCTURE EACH7.0002,800.00
7.0002,800.00
0.0000.00

0015                          3075.11 34.50575.00019,837.50
155 mm CONCRETE PAVEMENT, CLASS 47B-25 m2 575.00019,837.50
575.00019,837.50
0.0000.00

0016                          3075.45 48.652,047.00099,586.55
230 mm DOWELED CONCRETE PAVEMENT, CLASS 47B-25 m2 2,047.00099,586.55
2,120.600103,167.19
0.0000.00

0017                          4024.73 2,500.004.00010,000.00
CONCRETE FLUME, TYPE IV EACH4.00010,000.00
4.00010,000.00
0.0000.00

0018                          7017.00 7.201,181.0008,503.20
REMOVE GUARDRAIL m 1,181.0008,503.20
1,181.0008,503.20
0.0000.00

0019                          8029.84 2.102,835.0005,953.50
BITUMINOUS FOUNDATION COURSE 100 mm m2 2,835.0005,953.50
2,835.0005,953.50
0.0000.00

0020                          9110.01 60.0040.0002,400.00
RENTAL OF LOADER, FULLY OPERATED HOUR40.0002,400.00
0.0000.00
0.0000.00

0021                          9110.03 50.0040.0002,000.00
RENTAL OF DUMP TRUCK, FULLY OPERATED HOUR40.0002,000.00
0.0000.00
0.0000.00

0022                          9110.07 45.0040.0001,800.00
RENTAL OF SKID LOADER, FULLY OPERATED HOUR40.0001,800.00
0.0000.00
0.0000.00

0023                          9170.00 180.005.484987.12
EARTH SHOULDER CONSTRUCTION StaM5.484987.12
5.484987.12
5.484987.12

0024                          9173.20 2.302,835.0006,520.50
SUBGRADE PREPARATION m2 2,835.0006,520.50
2,835.0006,520.50
0.0000.00

0025                          9188.50 15.00205.0003,075.00
SURFACING UNDER GUARDRAIL m2 205.0003,075.00
205.0003,075.00
0.0000.00

GROUP 1 GRADINGContracted335,662.04
Current335,662.04
In place333,132.56
This Estimate987.12

GROUP 6A BRIDGE AT STA. 102+51.50
0046                          0030.60 10,000.001.00010,000.00
MOBILIZATION LS 1.00010,000.00
1.00010,000.00
0.0000.00

0047                          1010.01 15.00341.0005,115.00
EXCAVATION (ESTABLISHED QUANTITY) m3 341.0005,115.00
341.0005,115.00
0.0000.00

0048                          1043.50 3.002,400.0007,200.00
RIPRAP FILTER FABRIC m2 2,400.0007,200.00
2,400.0007,200.00
0.0000.00

0049                          3050.15 275.00115.60031,790.00
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 115.60031,790.00
115.60031,790.00
0.0000.00

0050                          3051.10 1.257,647.0009,558.75
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 7,647.0009,558.75
7,647.0009,558.75
0.0000.00

0051                          6000.10 6,000.001.0006,000.00
ABUTMENT NO.1 EXCAVATION LS 1.0006,000.00
1.0006,000.00
0.0000.00

0052                          6000.11 6,000.001.0006,000.00
ABUTMENT NO.2 EXCAVATION LS 1.0006,000.00
1.0006,000.00
0.0000.00

0053                          6005.60 600.008.0004,800.00
ELASTOMERIC BEARING EACH8.0004,800.00
8.0004,800.00
0.0000.00

0054                          6010.22 375.00114.00042,750.00
CLASS 47B-20 CONCRETE FOR BRIDGE m3 114.00042,750.00
114.00042,750.01
0.0000.00

0055                          6010.26 385.00194.00074,690.00
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 194.00074,690.00
194.00074,690.00
0.0000.00

0056                          6040.00 35,000.001.00035,000.00
REMOVE STRUCTURE EACH1.00035,000.00
AT STA. 102+46.5 1.00035,000.00
0.0000.00

0057                          6071.11 185,000.001.000185,000.00
STEEL SUPERSTRUCTURE LS 1.000185,000.00
AT STA. 102+51.5 1.000185,000.00
0.0000.00

0058                          6080.00 4.003,305.00013,220.00
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 3,305.00013,220.00
3,305.00013,220.00
0.0000.00

0059                          6104.00 28.001,920.50053,774.00
BROKEN CONCRETE RIPRAP Mg 1,920.50053,774.00
1,920.50053,774.01
581.68716,287.24

0060                          6131.50 1.2520,004.00025,005.00
EPOXY COATED REINFORCING STEEL kg 20,004.00025,005.00
20,004.00025,005.00
0.0000.00

0061                          6139.50 35.0055.5001,942.50
SUBSURFACE DRAINAGE MATTING m2 55.5001,942.50
55.5001,942.50
0.0000.00

0062                          6210.50 100.00524.00052,400.00
PIPE PILING m 524.00052,400.00
459.36045,936.00
0.0000.00

0063                          6310.00 125.00257.90032,237.50
STEEL SHEET PILING m2 257.90032,237.50
257.90032,237.50
0.0000.00

0064                          8091.00 35.00215.0007,525.00
GRANULAR BACKFILL m3 215.0007,525.00
215.0007,525.00
0.0000.00

4001                          6210.60 60.000.0000.00
PAY CUT-OFF FOR PIPE PILE m 25.0001,500.00
PILE CUTOFF FOR PIPE PILING 64.6403,878.40
0.0000.00

4002                          6020.06 579.930.0000.00
REINFORCING STEEL FOR BRIDGES LS 1.000579.93
Invoice #464358 Perrett Const. 0.0000.00
0.0000.00

GROUP 6A BRIDGE AT STA. 102+51.50Contracted604,007.75
Current606,087.68
In place601,422.17
This Estimate16,287.24

GROUP 6C BRIDGE AT STA. 12+64.0
0089                          0030.60 85,000.001.00085,000.00
MOBILIZATION LS 1.00085,000.00
1.00085,000.00
0.0000.00

0090                          1010.01 5.001,050.0005,250.00
EXCAVATION (ESTABLISHED QUANTITY) m3 1,050.0005,250.00
1,050.0005,250.00
0.0000.00

0091                          1043.50 2.00656.0001,312.00
RIPRAP FILTER FABRIC m2 656.0001,312.00
656.0001,312.00
0.0000.00

0092                          3050.15 325.00116.00037,700.00
CONCRETE FOR PAVEMENT APPROACHES CLASS 47BD-30 m3 116.00037,700.00
116.00037,700.00
0.0000.00

0093                          3051.10 1.107,605.0008,365.50
EPOXY COATED REINFORCING STEEL FOR PAVEMENT APPROACHES kg 7,605.0008,365.50
7,605.0008,365.50
0.0000.00

0094                          6000.10 10,000.001.00010,000.00
ABUTMENT NO.1 EXCAVATION LS 1.00010,000.00
1.00010,000.00
0.0000.00

0095                          6000.11 10,000.001.00010,000.00
ABUTMENT NO.2 EXCAVATION LS 1.00010,000.00
1.00010,000.00
0.0000.00

0096                          6000.60 35,000.001.00035,000.00
PIER NO.1 EXCAVATION LS 1.00035,000.00
1.00035,000.00
0.0000.00

0097                          6000.61 35,000.001.00035,000.00
PIER NO.2 EXCAVATION LS 1.00035,000.00
1.00035,000.00
0.0000.00

0098                          6005.35 150.0023.0003,450.00
PRECOMPRESSED POLYURETHANE FOAM JOINT m 23.0003,450.00
23.0003,450.00
0.0000.00

0099                          6005.78 850.0012.00010,200.00
EXPANSION BEARING, TFE TYPE EACH12.00010,200.00
12.00010,200.00
0.0000.00

0100                          6005.83 950.004.0003,800.00
FIXED BEARING EACH4.0003,800.00
4.0003,800.00
0.0000.00

0101                          6010.22 385.00233.40089,859.00
CLASS 47B-20 CONCRETE FOR BRIDGE m3 233.40089,859.00
233.40089,859.00
0.0000.00

0102                          6010.26 395.00379.600149,942.00
CLASS 47BD-30 CONCRETE FOR BRIDGE m3 379.600149,942.00
379.600149,942.00
0.0000.00

0103                          6040.00 96,375.001.00096,375.00
REMOVE STRUCTURE EACH1.00096,375.00
AT STA. 12+56.4 1.00096,375.00
0.0000.00

0104                          6071.11 400,000.001.000400,000.00
STEEL SUPERSTRUCTURE LS 1.000400,000.00
AT STA. 12+64.0 1.000400,000.00
0.0000.00

0105                          6080.00 6.001,365.0008,190.00
STRUCTURAL STEEL FOR SUBSTRUCTURE kg 1,365.0008,190.00
1,365.0008,190.00
0.0000.00

0106                          6104.00 17.00556.0009,452.00
BROKEN CONCRETE RIPRAP Mg 556.0009,452.00
139.0002,363.00
0.0000.00

0107                          6105.02 35.00384.00013,440.00
ROCK RIPRAP, TYPE B Mg 384.00013,440.00
0.0000.00
0.0000.00

0108                          6131.50 1.1557,580.00066,217.00
EPOXY COATED REINFORCING STEEL kg 57,580.00066,217.00
57,580.00066,217.01
0.0000.00

0109                          6139.50 40.0048.0001,920.00
SUBSURFACE DRAINAGE MATTING m2 48.0001,920.00
48.0001,920.00
0.0000.00

0110                          6210.12 65.001,325.50086,157.50
HP 250 mm X 62 kg STEEL PILING m 1,325.50086,157.50
1,262.69082,074.85
0.0000.00

0111                          6310.00 105.00186.80019,614.00
STEEL SHEET PILING m2 186.80019,614.00
186.80019,614.00
0.0000.00

0112                          8091.00 50.00185.0009,250.00
GRANULAR BACKFILL m3 185.0009,250.00
185.0009,250.00
0.0000.00

4000                          6210.59 39.000.0000.00
PILE CUT-OFF m 21.000819.00
PILE CUTOFF FOR HP250 X 62 GROUP 6C 62.8802,452.32
0.0000.00

GROUP 6C BRIDGE AT STA. 12+64.0Contracted1,195,494.00
Current1,196,313.00
In place1,173,334.68
This Estimate0.00

GROUP 7 GUARDRAIL
0113                          0030.70 1,200.001.0001,200.00
MOBILIZATION LS 1.0001,200.00
1.0001,200.00
0.0000.00

0114                          7011.20 44.41152.3606,766.31
W-BEAM GUARDRAIL m 152.3606,766.31
152.3606,766.31
0.0000.00

0115                          7020.00 1,081.008.0008,648.00
BRIDGE APPROACH SECTIONS EACH8.0008,648.00
8.0008,648.00
0.0000.00

0116                          7021.70 1,601.004.0006,404.00
GUARDRAIL END TREATMENT, SRT-350 EACH4.0006,404.00
4.0006,404.00
0.0000.00

0117                          7024.25 1,945.004.0007,780.00
GUARDRAIL END TREATMENT, TYPE 1 EACH4.0007,780.00
4.0007,780.00
0.0000.00

GROUP 7 GUARDRAILContracted30,798.31
Current30,798.31
In place30,798.31
This Estimate0.00

GROUP 10 GENERAL ITEMS
0118                          0001.08 0.50210.000105.00
BARRICADE, TYPE II BDAY210.000105.00
0.0000.00
0.0000.00

0119                          0001.10 2.003,986.0007,972.00
BARRICADE, TYPE III BDAY3,986.0007,972.00
4,393.0008,786.00
54.000108.00

0120                          0001.30 2.25474.0001,066.50
TYPE B HIGH INTENSITY WARNING LIGHT LDAY474.0001,066.50
935.0002,103.75
36.00081.00

0121                          0001.90 0.507,072.0003,536.00
SIGN DAY EACH7,072.0003,536.00
4,180.0002,090.00
90.00045.00

0122                          0003.10 150.0042.0006,300.00
FLAGGING DAY 42.0006,300.00
4.000600.00
4.000600.00

0123                          0010.04 3,500.001.0003,500.00
FIELD OFFICE EACH1.0003,500.00
1.0003,500.00
0.0000.00

0124                          0020.00 0.801,000.000800.00
TRAINING HOUR1,000.000800.00
573.000458.40
573.000458.40

0125                          0030.10 15,000.001.00015,000.00
MOBILIZATION LS 1.00015,000.00
1.00015,000.00
0.0000.00

GROUP 10 GENERAL ITEMSContracted38,279.50
Current38,279.50
In place32,538.15
This Estimate1,292.40

Totals for contractContracted2,204,241.60
Current2,207,140.53
In place2,171,225.87
This Estimate18,566.76